Exam (elaborations)
Building construction- Masonry construction 25.2 questions and answers (verified for accuracy)
- Module
- Institution
signs of pre 33 construction are? seismic upgrades, concrete caps on top of parapit walls, bond beams wherever trusses contact the exterior bearing walls, rater tie plates wherever floor joists or roof rafters (in those buildings with flat roofs) contact the exterior bearing walls. Other indicator...
[Show more]