100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
Main_points_Summary £3.87   Add to cart

Summary

Main_points_Summary

 75 views  1 purchase
  • Module
  • Institution

Useful summary for the main points mentioned during the class

Preview 1 out of 18  pages

  • September 6, 2017
  • 18
  • 2016/2017
  • Summary
avatar-seller
Logistic and supply chain operations – Summary

Chapter 1 - Capacity

Throughput time (TH): Rate at which entities are processed by the system
Work in process (WIP): Number of entities in the system, which can be measured in
physical units or financial units
Cycle Time (CT): (1) Time it takes to traverse the system, including any rework,
restarts because of yield loss, or other disruption. (2) The period required to complete
one cycle of an operation; or to complete a function, job, or task from start to finish.
Cycle time is used in differentiating total duration of a process from its run time.


In general the objective is to have a high TH and low WIP and CTà high efficiency.
Useful measure of efficiency is inventory turns (TH/WIP). TH is measured in terms
of the cost of goods sold in a year and WIP is the dollar value of the average amount
of inventory held in the system.

Measuring Capacity

Definition (Capacity): The capacity of a system is the maximum average rate at which
entities can flow through the system.

For individual situations: Capacity= base capacity – detractors
Base capacity is equal to the rate of processes under ideal conditions and detractors
anything that might slow the process down.
The process that constrains the capacity of a process is called bottleneck. Mostly, it is
the slowest process, or busiest. Measured through the utilization level, this is the
fraction in which the machine is not idle and computed as:
Utilization = rate into station/ capacity of station

Limits of Capacity

Principle (Capacity): The output of a system cannot equal or exceed its capacity.
Variability affects utilization. It is impossible to have 100% utilization. Insufficient
capacity planning due to ignoring detractors could lead to station overload, which
affects the release rate negatively and increasing WIP.
In case release parts are determined to be equal to the true capacity of the system.
Performance is no longer predictable and sometimes WIP level will be low. However,
in case of disruptions the WIP will significantly increase. In case release rate is the
same as the production rate, the WIP will stay high for a long time because there is no
slack capacity, which enables the system to catch up. If the release rate is lower e.g.
80% percent of the production rate, there are minor fluctuations of the WIP, but in
general the WIP remains consistently low.

Impact of Utilization

Principle (Utilization): Cycle time increases with utilization and des so sharply as
approaches 100%.



1

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller sihengchen. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for £3.87. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

79223 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy revision notes and other study material for 14 years now

Start selling
£3.87  1x  sold
  • (0)
  Add to cart