Certified erosion sediment and stormwater inspector ✔️Ans - CESSWI
Offers no mitigation ✔️Ans - Ignorance
Controls water pollution by regulating point sources that discharge
pollutants into waters of the US ✔️Ans - NPDES National pollutant
discharge elimination system
MS4 ✔️Ans - Municipal Separate Storm Sewer System
ESCP ✔️Ans - Erosion and sediment control plan
Has regulatory authority over the cwa ✔️Ans - EPA
Return flow from irrigated agriculture or their run off ✔️Ans - Does not
apply to the storm water term
Only directly to. Or though a separate storm water system into us waters
only ✔️Ans - NPDES REQUIREMENTS
Commercial, retail, light industrial and institutional facilities.
Less than 5 acres
MS4 serving fewer than 100k people ✔️Ans - Phase II
Agriculture is exempt only for ✔️Ans - Crop production
O&G, forestry, and agriculture discharges are ✔️Ans - Exempt
Waiver "construction rainfall erosivity waiver" from phase II requirements
under 2 conditions ✔️Ans - Low rainfall potential
Based on TMDL
*only for small sites
Triennial review process ✔️Ans - States required to review and revise if
necessary
, Umbrella coverage ✔️Ans - General Permit
Identifies potential sources of pollution that may effect storm water
discharges.
Describes management practices that are to be implemented to reduce
pollutants discharges in stormwater ✔️Ans - SWPPP
NOI ✔️Ans - Brief description of project
Estimated timetable for major activities
Estimated disturbed acres of soil
Certification that the swppp provides compliance
NOI needs to be submitted - ✔️Ans - At least 7 days before activity.
The SWPPP must be prepared before ✔️Ans - The NOI is filed
Under EPAs general permit disturbed areas that will not be redisturbed
within ________ days must be stabilized by the _____ day ✔️Ans - 14
EPAs GP also requires a sediment basin be installed where more than _____
acres in the upstream drainage area are disturbed at one time. ✔️Ans -
10 acres
A sediment basin must provide _________ cubic feet of storage for every
_______ acre of land that it drains ✔️Ans - 3600//1
EPA gives the State _______ days then they take action. ✔️Ans - 30
Arrival introduction ✔️Ans - -Credentials and ID (who you are)
-Purpose of visit (why are you there)
-What to expect at the end of the visit
-What they may receive and when follow up will occur
Pre construction meetings ✔️Ans - 1. Clarify objectives
2. Designate a contact person for communicating concerns
3. Determine if the sequence and plan will work, if not revise.
4. Make sure everyone reviews the plan/SWPPP
5. Remind everyone that BMPs are performance based and could require
changes, and establish procedure for those changes
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through credit card for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying these notes from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller LeCrae. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy these notes for £7.97. You're not tied to anything after your purchase.