Exam (elaborations)
ACI Concrete Field-Testing Technician - Grade 1 Exam Review | 100% Correct Answers | Verified | Latest 2024 Version
- Module
- Institution
Q1. Start molding specimens for strength tests within 30 minutes after fabricating the composite sample. A. True B. False - B. False ASTM C172 -Para (4.1.2) - Start molding. specimens for strength tests within 15 min after fabricating the composite sample. Q2. The maximum allowable time betwe...
[Show more]