Exam (elaborations)
Concrete Field Testing Technician Correct Questions & Solutions.
- Module
- Institution
C1064-The end of the temperature sensing portion of the thermometer is submerged a minimum of ___ into the freshly mixed concrete - ANSWER 3 inches Temperature of thermometer shall be capable of measuring the temperature of freshly mixed concrete to _____ throughout a range of _________. - ANSWE...
[Show more]