100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
Rn ati pharmacology proctored exam 2023 with ngn £8.90   Add to cart

Exam (elaborations)

Rn ati pharmacology proctored exam 2023 with ngn

 12 views  0 purchase

Rn ati pharmacology proctored exam 2023 with ngn

Preview 3 out of 18  pages

  • April 24, 2024
  • 18
  • 2023/2024
  • Exam (elaborations)
  • Questions & answers
All documents for this subject (6)
avatar-seller
LAWEXEPRT
Rn ati pharmacology proctored exam 2023 with ngn

Acceptance - ANSThe written acceptance by the Department of the Work.

acceptance testing - ANSTesting conducted by the Department to measure the degree
of compliance to the Contract

actual cost - ANSThe computed cost using calculations provided

addendum - ANSA Contract revision or response to a Contractor inquiry issued after
advertisement and before the opening of bids.

as-built quantity - ANSThe quantity of a completed Item eligible for payment

authorized funding amount - ANSThe amount of funds authorized by the Department for
the Contract

Bidder - ANSThe individual, firm, partnership, corporation, joint venture, or any
acceptable combination thereof that submits a bid to the Department.

bridge - ANS. A structure, other than a culvert, including supports, erected over a
depression or an obstruction, such as water, highway, or railway, and having a track or
passageway for carrying traffic or other moving loads and having a length 3 measured
along the center of the structure of more than 20 feet between undercopings of
abutments or extreme ends of openings for multiple boxes. Structure dimensions are
defined as follows:

bridge length - ANSThe overall length measured along the line of survey stationing from
back to back of backwalls of abutments, if present, otherwise end to end of the bridge
floor; but, in no case less than the total clear opening of the structure

bridge width - ANSThe clear width measured at right angles to the longitudinal
centerline of the bridge between the bottom of curbs, or in the case of multiple height of
curbs, between the bottoms of the lower risers or, if curbs are not used, between inner
faces of parapet or railing

Change Order. - ANSA written order issued by the Department to the Contractor after
execution of the Contract authorizing one or more of the following: 1. Changes in the
Work. 2. Modifications in the basis of payment. 3. Modifications to Contract Time.

Commercially Useful Function - ANSOccurrences in which the subcontractor is
responsible for the execution of a distinct element of the work of a contract and carrying
out its responsibilities by actually performing, managing, and supervising the work
involved, and with respect to materials and supplies used on the contract, prepares the
estimate, negotiates price, determines quality and quantity, orders the material,
arranges delivery, installs (where applicable), and pays for the material and supplies
itself for the project.

,Rn ati pharmacology proctored exam 2023 with ngn

Completion - ANSWhen all of the following have occurred: 1. The Work has been
satisfactorily completed in all respects according to the Contract. 2. The Project is ready
for use by the Department as required by the Contract. 3. The Contractor has
satisfactorily executed and delivered to the RE all documents, certificates, and proofs of
compliance required by the Contract including the Notice of Completion.

construction operations - ANSPhysical work done in the performance of the Contract
within the Project Limits. Does not include off-site mobilization, procurement and off-site
storage of materials and plants, engineering, performance bond and payment bond,
surveys, working drawings, off-site field offices, schedules, certificates, forms, or
documents

Contract - ANSThe written integrated agreement between the Department and the
Contractor setting forth the obligations of the parties, including, but not limited to, the
performance of the Work and the basis of payment. It includes the advertisement,
Proposal, Certification as to Publication and Notice of Advertisement for Proposal, bid,
Appointment of Agent by Nonresident Contractors, Resolution of Award of Contract,
Executed Form of Contract, performance and payment bonds, Specifications, Plans,
Right-of-Way Plans, permits, boring logs, pavement core records, addenda, Change
Orders, and Field Orders, all of which are to be treated as one instrument whether or
not set forth at length in the form of it.

Contract Time - ANSThe number of working days allowed to complete the work for a
milestone or the date by which work must be completed, as provided in the Contract
and as modified by Change Order.

Contractor - ANSThe individual, firm, partnership, corporation, joint venture, or any
acceptable combination thereof contracting with the Department for performance of the
Contract. For the purpose of carrying out the Contract, it also means the Contractor's
representative.

day. - ANSEvery day shown on the calendar

Department - ANSThe Department of Transportation of the State of New Jersey, as
created by law, acting through duly authorized representatives, such representatives
acting within the scope of the particular duties delegated to them.

Department Laboratory - ANSThe main testing laboratory of the Department at 930
Lower Ferry Road, P.O. Box 607 Trenton, New Jersey 08625, or such other laboratory
as the Department may designate

Discrimination. - ANSThat act (or action) whether intentional or unintentional, through
which a person in the United States, solely because of race, creed, color, national
origin, age, ancestry, nationality, sex (including pregnancy and sexual 4 harassment),
marital status, domestic partnership or civil union status, affectional or sexual
orientation, gender identity or expression, atypical hereditary cellular or blood trait,

, Rn ati pharmacology proctored exam 2023 with ngn

genetic information, liability for military service, or disability has been otherwise
subjected to unequal treatment.

Estimate - ANSProgress payment made to the Contractor by the Department.

Extra Work - ANSNew Work and quantity adjustments to Items that are not the result of
as-built measurement or calculation.

Federal Aid Project - ANSAny agreement or modification thereof between NJDOT and
any applicant and a person for construction work which is paid for in whole or in part
with funds obtained from the Federal government or borrowed on the credit of the
Federal government pursuant to any program involving a grant, contract, loan,
insurance or guarantee under which the NJDOT itself participates in the construction
work.

Federal Aid Project Attachments - ANSAttachments to the Contract Special Provision
document, used for Federal Aid Projects.

Field Order - ANSWritten direction, signed by the RE, requiring action by the Contractor

Full Traffic Access - ANSAll work is complete to allow safe unencumbered use of the
final paved portion of roadway throughout the project including but not limited to striping,
RPMs, rumble strips, highway lighting, and traffic signals as determined by the RE.

highway, street, or road - ANSA general term denoting a public way for purposes of
vehicular travel, including the entire area within the ROW (see Figure 101-1).

holiday - ANSA legal holiday as defined by N.J.S.A. 36:1-1

inspector - ANSThe Department's authorized representative assigned to inspect the
Work for conformance to the Contract

Interim Completion - ANSA milestone other than "Completion of Work," requiring
completion by a specified date or within a specified time.

Item - ANSA specifically described portion of Work for which there is a unit or lump sum
price.

ITS commissioning - ANSCompletion of Level A testing of an Intelligent Transportation
System per 704.03.01. This does not constitute Acceptance by the Department of the
work.

land surveyor - ANSA person who is legally authorized to practice land surveying in
New Jersey according to the provisions of N.J.S.A. 45:8-27, et seq

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller LAWEXEPRT. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for £8.90. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

64438 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy revision notes and other study material for 14 years now

Start selling
£8.90
  • (0)
  Add to cart