Exam (elaborations)
ACI Certification Revision Exam And Actual Answers 2024.
- Module
- Institution
All water and admixtures must be added to the mixer. - Answer What must occur before a sample of concrete can be taken from a revolving drum mixer? In two or more portions of concrete, at regularly spaced intervals, and from the middle of the batch. - Answer When sampling from a stationary o...
[Show more]