During reactive testing, which entity must give approval to change an approved voltage
schedule?
PJM, TOP, MOC, GO - Correct Answer ️️ -TO
Generation available within 10 minutes for offline reserve units:
Quick-start (hydro), manual, operating, s...
PJM Exam Que stions and Answers 100% Correct During reactive testing, which entity must give approval to change an approved voltage schedule? PJM, TOP, MOC, GO - Correct Answer ✔️✔️-TO Generation available within 10 minutes for offline reserve units: Quick -start (hydro), manual, operating, supplemental - Correct Answer ✔️✔️-Quick -start (hydro) Minimum MVARs for an individual generator that is required to do reactive testing? - Correct An swer ✔️✔️-20 MVA Minimum MVARs for an aggregate of generators that is required to do reactive testing? - Correct Answer ✔️✔️-75 MVA Power transformer is connected to the generator with which line? - Correct Answer ✔️✔️-
Primary In a balancing authority regi on, If a site trips offline, what increases? - Correct Answer ✔️✔️-positive time error How many hours before NERCs 24hour deadline ends must you report disturbance to PJM? - Correct Answer ✔️✔️-6 hrs How does PJM avoid dealing with economic issues during t ransmission related constraints - Correct Answer ✔️✔️-cost (offer) capping generation If a generator doesn't have ICCP, what does it have to be linked through so data is available? - Correct Answer ✔️✔️-SCADA (through EMS) Which balancing control mode is u sed by PJM under normal operations? - Correct Answer ✔️✔️-Tie line bias the purpose for balancing area to have AR (area regulator) is to correct for: - Correct Answer ✔️✔️-small deviations in load what esuite tool is used to maintain individual generator r egulation data that is submitted by PJM members? - Correct Answer ✔️✔️-eMarket cold weather alert is for what temp? - Correct Answer ✔️✔️-10F what are the three types of transmission constraint that PJM monitors? - Correct Answer ✔️✔️-Reactive, Stability, Thermal (transfer limits) which would be the last step PJM would take in attempting to relieve a transmission constraint? - Correct Answer ✔️✔️-shed load Load in PJM is generally served using ___ transmission service. - Correct Answer ✔️✔️-
Network Integrat ion If you were going to import, export, or wheel power through PJM, you would use ____ transmission services? - Correct Answer ✔️✔️-point -to-point? what is an example of a quick start reserve? - Correct Answer ✔️✔️-Hydroelectric In order to lower system v oltage, ___ must decrease to decrease _____ - Correct Answer ✔️✔️-MW, MVAR what is PJM's reg requirement during a system restoration? - Correct Answer ✔️✔️-2% of current load During restoration conditions, what amount of load must be shed in order to incre ase frequency by 1.0Hz - Correct Answer ✔️✔️-6-10% During restoration conditions, what percentage of load must be shed in order to alter frequency by 1% Hz? - Correct Answer ✔️✔️-1-2% of load to alter frequency by 1% What is the approx. MVAR per mile of 50 0kV transmission that should be anticipated? - Correct Answer ✔️✔️-1.70 MVAR per mile Frequency during restoration process should be: - Correct Answer ✔️✔️-59.75 -61Hz A system will blackout at what frequency? - Correct Answer ✔️✔️-57.5 Hz or lower What is the criteria for PJM to issue a Min Gen Alert? - Correct Answer ✔️✔️-Within 2500 MW of normal eco min limits Based on a generator capability curve, in order to maximize the MVAR output of the generator, it may be necessary to: - Correct Answer ✔️✔️-decreas e MW output It would be an acceptable action for PJM to request of a generator during periods of heavy flows (load) and low voltages to lower real -time power output to ... - Correct Answer ✔️✔️-increase reactive power lowering the generator's current and increasing the voltage will also increase: - Correct Answer ✔️✔️-MVARs (reactive power) PJM dispatches supply resources in what order to meet customer demand? - Correct Answer ✔️✔️-lowest to highest cost If supply excee ds demand, what will system frequency be? - Correct Answer ✔️✔️-
greater than 60 Hz
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through credit card for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying these notes from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller BrittieDonald. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy these notes for £9.98. You're not tied to anything after your purchase.