100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
LEED Green Associate Exam (5). £7.16   Add to cart

Exam (elaborations)

LEED Green Associate Exam (5).

 0 view  0 purchase

LEED Green Associate Exam (5).

Preview 2 out of 5  pages

  • June 5, 2024
  • 5
  • 2023/2024
  • Exam (elaborations)
  • Questions & answers
All documents for this subject (82)
avatar-seller
denicetho
LEED Green Associate Exam
Green Building has evolved in response to: - ANS-Increasing evidence of environmental
impact of buildings.
Increasing demand for natural resources.
Increasing advances in other industries.

BREEAM, CASBEE, Green Globes, SB Tool and LEED are all examples of what? -
ANS-Building Assessment Systems

Which of the following is not a documented benefit of green buildings: Lower operating
costs.
Reduced impact on the environment.
Enhanced occupant comfort and health.
Improved building aesthetics - ANS-Improved building aesthetics

The United Nations report that was published in 1987 and provides the most commonly
cited definition of sustainable development (or, classic definition) is referred to as the: -
ANS-The Bruntland Report

The U.S. Green Building Council (USGBC) was founded in: - ANS-1993

The Precautionary Principle puts the burden of the proof of harmlessness of a new
interventions (technology, process, activity or chemical) on the: - ANS-intervention's
proponents

A widely recognized figure who laid many of the foundations for the green building
movement throughout the 20th century, and who invented the geodesic dome, is: -
ANS-Buckminster Fuller

Triple Bottom-line Reporting refers to: - ANS-Corporate reporting that includes
environmental and social impacts, not just financial.

LEED stands for - ANS-Leadership in Energy and Environmental Design

Who should participate in the charrette at the start of the integrated design process for a
new green building? - ANS-The entire design team, owners, contractors and
stakeholders.

, SS Credit - Site Development: Protect or Restore Habitat, establishes a hierarchy of
conservation efforts associated with building projects. Which of the following is
considered the highest priority action a project should consider for a selected project
site? - ANS-Conserve ecological resources present on the site.

The Development Density compliance path for LT Credit - Surrounding Density/Diverse
Use, requires that the project is located in a community that meets or exceeds a
minimum existing density threshold. This requirement is intended to conserve
undeveloped greenfields as well as to: - ANS-promote public health and walkability

Which of the following is defined as: "Water that meets or exceeds U.S. Environmental
Protection Agency drinking water quality standards (or a local equivalent outside the
U.S.) and is approved for human consumption by the state or local authorities having
jurisdiction; it may be supplied from wells or municipal water systems." - ANS-Potable
water

In order to achieve WE Prerequisite - Indoor Water Use Reduction, how much less
water does the building need to use compared to a baseline building? - ANS-20%

In order to achieve 1 point (the first tier of achievement) for WE Credit - Outdoor Water
Use Reduction, how much must the project team reduce the landscape water
requirement (LWR) from the calculated baseline? - ANS-50%

LEED v4.1 promotes a transition away from conventionally-fueled (gas and diesel)
automobiles with a credit that promotes which of the following alternatives? -
ANS-Electric vehicles

Which of the following are three characteristics of nighttime site lighting addressed by
SS Credit - Light Pollution Reduction? - ANS-Backlight, uplight and glare

One of the options to achieve LT Credit � High Priority Site is brownfield remediation. A
brownfield designation must be documented. Which of the following is NOT an
acceptable method of documentation? - ANS-Photographs showing that the site is
littered with empty 50-gallon drums from a previous owner that contained an unknown
liquid.

In order to achieve the minimum the requirements of SS Credit - Rainwater
Management, a project must manage on-site the runoff from a specific size storm event.
What size storm event is the minimum that must be achieved? - ANS-The 80th
percentile storm event

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller denicetho. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for £7.16. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

67474 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy revision notes and other study material for 14 years now

Start selling
£7.16
  • (0)
  Add to cart