OPERATIONS MANAGEMENT FINAL EXAM SOLVED #16
Balance delay - correct answer the total idle time of an assembly line
Best operating level - correct answer the percent of capacity utilization at which unit
costs are lowest
Block diagram - correct answer a schematic layout diagram that includes that size of
each work area
Capacity - correct answer the maximum capacility to produce
Capacity cushion - correct answer a percent of capacity held in reserve for unexpected
occurences
Capacity planning - correct answer a long-term strategic decision that establishes the
overall level of productive resources for a firm
Cellular layout - correct answer a layout that creates individual cells to process parts or
customers with similar requirements
Cycle time - correct answer the maximum amount of time an item is allowed to spend at
each workstation if the targeted production rate is to be achieved; also, the time
between successive product completions
Diseconomies of scale - correct answer when higher levels of output cost more per unit
to produce
Economies of scale - correct answer when it costs less per unit to product higher levels
of output
Facility layout - correct answer the arrangement of machines, departments,
workstations, and other areas within a facility
Fixed-position layout - correct answer a layout in which the product remains at a
stationary site for the entire manufacturing cycle
Flexible manufacturing system (fms) - correct answer programmable equipment
connected by an automated material-handling system and controlled by a central
computer
Line balancing - correct answer a layout technique that attempts to equalize that
amount of work assigned to each workstation on an assembly line
Mixed-model assembly line - correct answer an assembly line that processes more than
one product model
, Muther's grid - correct answer a formate for displaying manager preferences for
department locations
Precedence requirements - correct answer physical restrictions on the order in which
operations are performed
Process layout - correct answer a layout that groups similar activities together into work
centers according to the process or function they perform
Product layout - correct answer a layout that arranges activities in a line according to
the sequence of operations that are needed to assemble a particular product
Production flow analysis (pfa) - correct answer a group technology technique that
reorders part routing matrices to identify families of parts with similar processing
requirements
Relationship diagram - correct answer a schematic diagram that denotes location
preference with different line thicknesses
Unit load - correct answer the quantity in which material is normally moved, such as a
unit at a time, a pallet, or a bin of material
Contraints - correct answer linear relationships of decision variables representing the
restrictions placed on the decision situation by the operating environment
Decision variables - correct answer mathematical symbols that represent levels of
activity of an operation
Extreme points - correct answer corner points, or protrusions, on the boundary of the
feasible solution space in a linear programming model
Feasible solution space - correct answer an area that satisfies all contraints in a linear
programming model simultaneously
Graphical solution method - correct answer a method for determining the solution of a
linear programming problem using a two-dimensional graph of the model
Linear programming - correct answer a technique for general decision situations in
which the decision is to determine a level of operational activity in order to achieve an
objective, subject to restrictions
Objective function - correct answer a linear mathematical relationship that describes the
objective of an operation in terms of decision variables
Optimal solution - correct answer the single best solution to a problem
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through credit card for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying these notes from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller puritywanjihia. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy these notes for £10.91. You're not tied to anything after your purchase.