performance-based code - ANS-A _________ outlines a requirement that a design has
to meet but does not state that a particular method or material must be used to meet the
requirements.
False - ANS-True or False
A performance-based code/standard gives the designer less freedom than a
prescriptive-based code/standard.
code - ANS-A ____________ is a collection of rules and regulations that has been
enacted by law in a particular jurisdiction.
All of the answers are correct - ANS-An exception to a code may occur in which of the
following forms?
A. Variances
B. Appeals
C. Modifications
D. All of the answers are correct
True - ANS-True or False:
Fire and life safety inspectors acting alone have little authority to approve requests for
modification of code requirements.
False - ANS-True or False:
Falls are the leading cause of unintentional injury deaths for adults over the age of 65.
All of the answers are correct - ANS-Model code organizations include:
A. National Fire Protection Association (NFPA)
B. International Code Council (ICC)
C. American Society of Mechanical Engineers (ASME)
D. all answers are correct
All of the answers are correct - ANS-The Iroquois Theater fire resulted in which of the
following changes for other theater buildings:
A. Outward open exit doors must remain unlocked
B. Exit doors fitted with panic hardware
C. Flame-resistant scenery, props, and curtains
, D. all answers are correct
C. Cocoanut Grove Fire - ANS-Many jurisdictions did not include restaurants and
nightclubs in the code classification of public places until which historic fire:
A. Beverly Hill Supper Club Fire
B. The Station Nightclub Fire
C. Cocoanut Grove Fire
D. Our Lady of the Angles School Fire
All of the answers are correct - ANS-Sanctions issued by a jurisdiction may be in the
form of __________.
A. Stop Work Orders
B. Fines
C. Court summonses
D. all answers are correct
All of the answers are correct - ANS-Which of the following technological tools may be
used to schedule, record, and file inspection documents?
A. smart phone
B. tablet
C. laptop
D. all answers are correct
True - ANS-True or False:
The plan review process can be broken down into the following phases: Application,
Review, Approval, Site Visits, and Commissioning.
C. design professional's - ANS-It is the ______________ responsibility to determine the
occupancy classification for the proposed building and identify the intended use of each
room or section of the building.
A fire marshal's
B. fire inspector's
C. design professional's
D. property owner's
C. Records retention - ANS-All inspection files are subject to laws and must be kept for
a specific length of time.
A. public retention
B. office retention
C. records retention
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through credit card for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying these notes from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller modockochieng06. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy these notes for £6.47. You're not tied to anything after your purchase.