ACI Concrete Field Testing Technician- Grade I
The sensor of the temperature measuring device shall be submerged a minimum of _____ in.
[_____mm] into the freshly mixed concrete. - ANS-3 in. [75 mm]
The temperature measuring device shall have a capacity of measuring temperature of freshly
mixed concrete to +- _____ degrees F [+- _____ C] throughout a range of _____. - ANS-1
degree F [0.5 C], 30 degrees F to 120 F [0 C to 50 C]
The temperature measuring device shall be calibrated _____, or whenever there is a question of
_____. - ANS-Annually, accuracy
The temperature of concrete may be measured in a wheelbarrow. True or False? - ANS-True
The temperature of concrete may be measured in a wall form. True of False - ANS-True
A composite sample of concrete is required even if the only purpose for obtaining the sample is
to determine temperature. True of False? - ANS-False
What must be done to the sample container prior to sampling the concrete? - ANS-Dampen
(with water)
What must be done to the concrete surrounding the temperature measuring device after the
device is submerged in the fresh concrete. - ANS-Gently press the concrete around the
temperature measuring device at the surface of the concrete
How long must the temperature measuring device remain in the freshly mixed concrete? -
ANS-At least 2 minutes but not more than 5 minutes
After the temperature of the concrete is read, what is required? - ANS-Reporting of temperature
The temperature of concrete is reported to the nearest _____ degrees F [_____ C] - ANS-1
degree F [0.5 C]
According to ASTM C1064, what is one reason to take the temperature of concrete? -
ANS-Verify conformance to a specified requirement for temperature of concrete
A maximum temperature of freshly mixed concrete is specified in ASTM C1064. True of False? -
ANS-False
The sample of concrete used for temperature determination must be rodded 25 times. True or
False? - ANS-False
, Sampling by this method is required when tests are to be made to determine _____ with
specification requirements. - ANS-Compliance
This method covers sampling from four types of mixtures which are _____, _____, _____, and
_____. - ANS-Stationary mixers, paving mixers, revolving drum mixers, and open top mixers
The maximum allowable time between obtaining the first and final portions of a composite
sample is _____ minutes. - ANS-15
Portions of a composite sample shall be thoroughly remixed bfore beginning tests on the
sample. True of False? - ANS-True
The maximum elapsed time allowed between obtaining the final portion of the composite
sample and beginning the tests for slump, temperature, and air content is _____ minutes. -
ANS-5
The molding of strength test specimens shall begin within _____ minutes after fabricating the
composite sample. - ANS-15
The concrete sample must be protected from contamination and _____. - ANS-Rapid
evaporation
The minimum size sample for making strength test specimens is _____. - ANS-28 L (1ft^3)
When sampling from a stationary mixer, the batch must be sampled at _____ or more regularly
spaced intervals during discharge of the middle portion of the batch - ANS-2
The composite sample for a paving mixer must represent a minimum of _____ different portions
of the batch of concrete taken from the pile after discharge. - ANS-5
When sampling from a revolving drum truck mixer, concrete must be sampled at a minimum of
_____ regularly spaced intervals during discharge of the middle portion of this batch. - ANS-2
Concrete samples from a truck mixer must be obtained before any water or admixtures are
added to the mixer at the job site. True or False? - ANS-False
The composite samples from a truck mixer must be obtained from the _____ portion of the
batch. - ANS-Middle
When the concrete contains aggregate larger than that permitted for a particular test method,
the sample of concrete must be _____ _____ before making the test. - ANS-Wet sieved
The slump test is applicable to plastic concrete with a maximum size aggregate of _____. -
ANS-1.5 in. [37.5 mm]
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through credit card for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying these notes from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller AnswersCOM. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy these notes for £6.52. You're not tied to anything after your purchase.