100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
STEAM BOILERS EXAM QUESTIONS AND ANSWERS #16. £11.40   Add to cart

Exam (elaborations)

STEAM BOILERS EXAM QUESTIONS AND ANSWERS #16.

 5 views  0 purchase

STEAM BOILERS EXAM QUESTIONS AND ANSWERS #16.

Preview 3 out of 19  pages

  • June 22, 2024
  • 19
  • 2023/2024
  • Exam (elaborations)
  • Questions & answers
All documents for this subject (40)
avatar-seller
puritywanjihia
STEAM BOILERS EXAM QUESTIONS AND ANSWERS #16

1. A low pressure steam boiler has a maximum allowable working pressure (MAWP) up to:
A : 15 psi
B : 35 psi
C : 100 psi
D: no MAWP: A : 15 psi
2. In a fire tube boiler, the heat and gases of combustion pass
A : through the tubes
B : around the tubes
C : only through the combustion chamber
D: both A and B: C : only through the combustion chamber
3. A fire tube boiler may be used
A : only in low pressure plants
B : only in high pressure plants
C : in high or low pressure plants
D: only for process steam: B : only in high pressure plants
4. Because of the large of water, the boiler most likely to cause a boiler explosion is
A : a watertube boiler
B : a firetube boiler
C : both can
D: boilers cannot explode: B : a firetube boiler
5. A horizontal return tubular (HRT) boiler is boiler
A : a firetube
B : a watertube
C : either a firetube or a watertube D: none of
the above: A : a firetube
6. A sudden drop in boiler steam pressure without a corresponding drop in boiler water
temperature could result in
A : loss of efficiency
B : boiler explosion
C : an increase in surface tension
D: no effect on boiler: B : boiler explosion
7. The part of a boiler that has the heat and gases of combustion on one side & water on the other
side is known as the
A : water surface
B : steam surface
C : fire side
D: heating surface: D: heating surface






,STEAM BOILERS EXAM QUESTIONS AND ANSWERS #16


8. The comparison, or ratio, of heat supplied in fuel to heat absorbed by water is defined as
efficiency.
A : combustion
B : watertube
C : thermal
D: overall plant: C : thermal
9. The steam and water drum of watertube boilers is dished (concave) to eliminate the need for
A : brickwork
B : waterwalls
C : stays
D: baffles: C : stays
10.Vertical firetube boilers require :
A : high ceilings
B : less floor space
C : the use of staybolts
D: all of the above: D : all of the above
11.In a watertube boiler, the heat and gases of combustion pass
A : through the tubes
B : around the tubes
C : through and around the tubes
D: only through the combustion chamber: B : around the tubes
12.The boiler has a large volume of water in relation to horsepower size
A : firetube
B : watertube
C : process steam
D: vertical watertube: A : firetube
13.The mud drum is the lowest part of the waterside of a(n) boiler
A : HRT
B : watertube
C : low pressure firetube
D: high pressure firetube: B : watertube
14.Boiler plates and staybolts are subjected to stress
A : tensile
B : compressive
C : shear
D: no stress when boiler is under pressure: A : tensile
15.Safety valve connections must be approved by the : A : fire
department




, STEAM BOILERS EXAM QUESTIONS AND ANSWERS #16


B : shift foreman
C : American Society of Mechanical Engineers (ASME)
D: American Boiler Manufacturers Association (ABMA): C : American Society of Mechanical
Engineers
16.The most important fitting on a boiler is the
A : low water fuel cut off
B : feedwater regulator
C : superheater
D: safety valve: D : safety valve
17.To prevent failure from pressure over the MAWP, all steam boilers must be equipped with at least
one .
A : safety valve
B : blowdown valve
C : gauge glass
D: feedwater heater: A : safety valve
18.A safety valve will :
A : control the boiler operating range
B : control high or low water
C : prevent the boiler from exceeding its MAWP
D: control high and low fire: C : prevent the boiler from exceeding its MAWP
19.Safety valves are designed to
A : open slowly to prevent water hammer
B : pop open
C : open only by hand
D: open and close with no drop in pressure: B : pop open
20.Superheater safety valves are set to open
A : after the main safety valves are opened
B : before the main safety valves are opened
C : only when header pressure is 6% above the MAWP
D: when the boiler is coming off line: B : before the main safety valves are opened
21.When testing a safety valve, there must be
A : at least 75% of the popping pressure
B : no pressure on the boiler
C : an inspector present
D: someone watching the water level: A : at least 75% of the popping pressure
22.Any repairs to the safety valve must be done by the
A : chief engineer
B : state inspector
C : safety valve manufacturer or manufacturers authorized representative

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller puritywanjihia. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for £11.40. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

79064 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy revision notes and other study material for 14 years now

Start selling
£11.40
  • (0)
  Add to cart