100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
CMIT Level 1 Exam - Chapter 1 £6.37   Add to cart

Exam (elaborations)

CMIT Level 1 Exam - Chapter 1

 0 view  0 purchase

CMIT Level 1 Exam - Chapter 1

Preview 1 out of 3  pages

  • June 22, 2024
  • 3
  • 2023/2024
  • Exam (elaborations)
  • Questions & answers
All documents for this subject (19)
avatar-seller
lydiaomutho
CMIT Level 1 Exam - Chapter 1
4 factors when considering a delivery method - ANS-- type of project
- size of project
- owner capabilities
- time considerations

Agency CM - ANS-A construction management option in which the construction
manager acts in the owner's best interests at every stage of the project from design
through construction. The construction manager offers advice and project management
services to the owner but is not financially responsible for the construction and doesn't
perform any actual construction.

CM at Risk (CMAR) - ANS--Will most likely do preconstruction work for the owner
-Advises the owner with respect to construction costs during the design phase,
manages the project's construction during the construction
phase, and works as the general contractor for the project.

Contracting Advantage - ANS-Contracts for all public projects have features that greatly
favor the public owner. Some of those features include the ability to direct their
consultants to do work beyond the original scope (subject to subsequent equitable
adjustments), price data rights that allow the public owner to audit the service provider's
books at any time, and special provisions based on statutes that specify civil and
criminal penalties for program fraud

Design-Bid-Build (DBB) - ANS-Project Delivery method where the owner contracts with
an architect to design the project and prepare contract documents. When complete the
documents are issued to interested contractors to prepare bids to construct the work.

Design-Build(D-B) - ANS-The owner contracts with one entity (a person or firm) to
provide both design and construction services, that entity then subcontracts portions of
the work to others as needed

Engineering, Procurement and Construction Management(EPCM) - ANS-- Same as D-B
- CM is involved normally in the design management and construction process
- In this one they are not involved in construction

Five basic stages of a construction manager - ANS-pre-design, design, procurement,
construction, and post-construction.

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller lydiaomutho. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for £6.37. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

83100 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy revision notes and other study material for 14 years now

Start selling
£6.37
  • (0)
  Add to cart