100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
ACI CACI Certification Exam (1).ertification Exam (1). £6.51   Add to cart

Exam (elaborations)

ACI CACI Certification Exam (1).ertification Exam (1).

 1 view  0 purchase

ACI Certification Exam (1).

Preview 2 out of 5  pages

  • June 23, 2024
  • 5
  • 2023/2024
  • Exam (elaborations)
  • Questions & answers
All documents for this subject (127)
avatar-seller
modockochieng06
ACI Certification Exam
ASTM C172 covers sampling from stationary, paving and truck mixers, and from agitating and
non-agitating equipment used to transport central-mixed concrete. - ANS-True

When the concrete contains large aggregate, the testing technician should wet-sieve the sample
before making unit weight tests for use in yield computations. - ANS-False

Samples should be taken before 10% or after 90% of the batch has been discharged. -
ANS-False

Samples smaller than 28L (1 cu.ft.) are allowed on routine air content, temperature, and slump
tests. - ANS-True

Tests for slump and air content must be started within ____________ after obtaining the final
portion of the composite sample. - ANS-5 Minutes

Start molding strength test specimens within ________ after fabricating the composite sample. -
ANS-15 Minutes

How do you regulate the rate of discharge of the batch from the revolving truck drum mixer or
agitator? - ANS-By the rate of revolution of the drum

The mold is in the shape of a ___________________. - ANS-Frustrum of a Cone

The top diameter of a slump cone is ______ and the diameter at the base is ________. -
ANS-4", 8"

While the technician is checking the slump of the concrete, there is a decided falling away or
shearing off of the concrete from one side of the sample. What should the technician do? -
ANS-Disregard the test and retest on another portion of the sample

The mold is filled in three equal layers by volume, which makes the first third at _______, and
the second third at ________. - ANS-2 5/8, 6 1/8

The maximum size of aggregate allowed for ASTM C143 is _________. - ANS-1 ½"

When rodding the second and third layers the rod should penetrate through the layer and into
the previous layer________. - ANS-1"

The slump of the concrete was determined to be 4 5/16" what should be recorded as the slump?
- ANS-4 1/4"

, What is the difference allowed by ACI when certifying an individual test using a plastic slump
cone vs. a metal slump cone? - ANS-.5"

The sides of the slump mold should be lightly tapped to consolidate the concrete in the mold -
ANS-False

When rodding the final lift additional concrete must be added to keep excess concrete above
the top of the mold at all times - ANS-True

ASTM C 1064 defines the maximum recommended temperature for concrete. - ANS-False

The temperature test method must be complete with in _________ after obtaining the sample. -
ANS-5 Minutes

Each temperature-measuring device should be calibrated ________, or whenever there is a
question of _________. - ANS-Annually, Accuracy

When determining the temperature of fresh concrete, what is the minimum amount of concrete
cover in all directions around the sensor of the TMD? - ANS-3"

When the concrete contains a nominal maximum size of aggregate greater than 3 inches, it may
require __________ before the temperature is stabilized after mixing. - ANS-20 Minutes

After strike off of the measure used to determine density, a small quantity of concrete may be
added to correct a deficiency? - ANS-False

If using any strike off plate the plate must be at least 1 inch greater than the diameter of the
measure with which it is being used. - ANS-False

If rodding is the method of consolidation being used in C138, the measure must be filled in how
many layers? - ANS-3

What is the required shape at the end of the tamping rod? - ANS-rounded to a hemispherical tip

After consolidation of the final layer, the concrete is ½ inch above the top of the measure, what
should be done? - ANS-remove excess concrete with a scoop or trowel

According to ASTM C 138 what is the density of the following concrete batch?
Mass of Measure 7.4 lbs

Mass of Measure w/ Concrete 44.5 lbs

Volume of Measure .254 CF - ANS-146.06 lb/cf = (44.5-7.4)/0.254

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller modockochieng06. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for £6.51. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

75323 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy revision notes and other study material for 14 years now

Start selling
£6.51
  • (0)
  Add to cart