100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
ACI CertifiACI Certification_ Performance Checklistcation. £6.21   Add to cart

Exam (elaborations)

ACI CertifiACI Certification_ Performance Checklistcation.

 1 view  0 purchase

ACI CertifiACI Certification_ Performance Checklistcation.

Preview 1 out of 1  pages

  • June 23, 2024
  • 1
  • 2023/2024
  • Exam (elaborations)
  • Questions & answers
All documents for this subject (127)
avatar-seller
modockochieng06
ACI Certification: Performance Checklist
15 minutes - ANS-Start molding specimens for strength tests within how many minutes after
fabricating the final portion of the composite sample?

15 minutes - ANS-What is the maximum allowable time between obtaining the first and final
portions of the composite sample?

28 L (1 cubic foot) - ANS-What is the minimum size for a sample when strength test specimens
are to be molded?

5 minutes - ANS-Start the tests for slump, temperature, and air content within how many
minutes after obtaining the final portion of the composite sample?

All water and admixtures must be added to the mixer. - ANS-What must occur before a sample
of concrete can be taken from a revolving drum mixer?

Combine and remix the samples with a shovel. - ANS-What action is required after the individual
concrete samples have been transported to the place where tests are to be performed?

Discharge the contents of the paving mixer. Obtain samples from at least five different portions
of the pile. - ANS-Describe the procedure for collecting a sample from a paving mixer.

In two or more portions of concrete, at regularly spaced intervals, and from the middle of the
batch. - ANS-When sampling from a stationary or revolving drum mixer, what is collected and
when is it taken during discharge?

Repeatedly pass a receptacle through the entire discharge stream. Completely divert the
discharge stream into a sample container. - ANS-How are the sample portions obtained from
the discharge stream of a stationary or revolving drum mixer?

Sun, wind, and rapid evaporation. Contamination. - ANS-From what must the concrete sample
be protected?

Wet sieving - ANS-What should be done if the concrete contains aggregate larger than is
appropriate for the size of the molds or the equipment being used?

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller modockochieng06. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for £6.21. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

78310 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy revision notes and other study material for 14 years now

Start selling
£6.21
  • (0)
  Add to cart