EPA Lead exam Questions with complete solution 1%= ___ppm - correct answer 10,000
Allowable amount of lead in dry surface paint wit hXRF - correct answer 1.0mg/cm2
allowed quantity of lead in dry surface paint with paint chip testing - correct answer 5000ppm = 5% by weight
dust clear...
EPA Lead exam
EPA Lead exam
2024/2025 1%= ___ppm - correct answer ✔10,000
Allowable amount of lead in dry surface paint wit hXRF - correct answer ✔1.0mg/cm2
allowed quantity of lead in dry surface paint with paint chip testing - correct answer ✔5000ppm = 5% by weight
dust clearance for floors - correct answer ✔40 ug/ft2
dust clearance window sills - correct answer ✔250ug/ft2
dust clearance for wells - correct answer ✔400 ug/ft2
dust clearance for outside concrete - correct answer ✔800 ug/ft2
clearance for in soil high contact - correct answer ✔400 ppm
clearnce for soil in low contact areas - correct answer ✔1200 ppm
allowable lead in water - correct answer ✔15 ppb or 15mg/L
Lead level of concern in kids - correct answer ✔5ug/dl
niosh bll of concern - correct answer ✔25 ug/dl
OSHA lead allowable lead level - correct answer ✔40 ug/dl Osha medical removal - correct answer ✔50ug/dl
Lead % allowed in paint 1978 - correct answer ✔0.06% or 600ppm
Lead allowed in paint as of 2009 - correct answer ✔0.009% or 90ppm
Hazardous waste toxic characteristic leaching procedure TCLP - correct answer ✔5 ppm
TSCA Title IV, Section 402/404 Rule directed EPA to - correct answer ✔develop training and certification requirements for lead professionals & indviduals performing risk assessment
True or False EPA's debris rule advises contractors that lead waste generated
during renovation and remodeling of
residential housing is now waived from RCRA's rule and can be disposed of as municipal waste - correct answer ✔True
True or False Section 1012/1013 within Title X are sections referring to HUD rules - correct answer ✔True
Are lead inspections mandatory in pre 1978 housing? - correct answer ✔NO
T/F there is no established time frame for abatement of lead based paint in housing. However, all lead-based
paint hazards must be abated from a target house when the project is funded in the amount of $25,000 or more
through HUD - correct answer ✔True
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through credit card for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying these notes from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller Carzola98. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy these notes for £12.35. You're not tied to anything after your purchase.