Exam (elaborations)
ACI GRADE 1 FIELD TESTING CERTIFICATION PRACTICE TEST QUESTIONS AND ANSWERS |LATEST 2024 WITH CORRECT ANSWERS
Institution
ACI Concrete.
ACI GRADE 1 FIELD TESTING CERTIFICATION PRACTICE TEST QUESTIONS AND
ANSWERS |LATEST 2024 WITH CORRECT ANSWERS
The temperature measuring device shall have a capacity of measuring temperature of freshly mixed concrete throughout a range of ______ to ______ Fahrenheit (
A composite sample is ...
[Show more]
Uploaded on
August 2, 2024
Number of pages
8
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
Institution
ACI Concrete.
Module
ACI Concrete.
£8.96
Also available in package deal from £18.33
Added
Add to cart
Add to wishlist
100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached
Also available in package deal (1)
PACKAGE DEAL FOR >. ACI CONCRETE FIELD TESTING TECHNICIAN- GRADE I | COMPLETE QUESTIONS AND ANSWERS GRADED A+ >> ACI CONCRETE | ACI EXAM 100% ACCURATE BUNDLE.
£ 110.26
£ 18.33
12 items
1. Exam (elaborations) - Aci concrete field testing technician- grade i | complete questions and answers grade...
2. Exam (elaborations) - Aci certification- concrete field testing technician grade 1 [cp1>>12] updated|...
3. Exam (elaborations) - Aci concrete field testing technician - grade i | questions and answers |updated|2024
4. Exam (elaborations) - Aci test |2024| questions and answers
5. Exam (elaborations) - Aci certification - concrete field testing technician - grade 1 - test sample written...
6. Exam (elaborations) - Aci concrete field testing technician grade 1 study guide | questions and answers gra...
7. Exam (elaborations) - Aci- concrete field-testing technician - grade 1 >> questions and answers |late...
8. Exam (elaborations) - Aci grade 1 field testing certification practice test questions and answers |latest 2...
9. Exam (elaborations) - Aci certification - concrete field testing technician grade 1 - section 5 air content...
10. Exam (elaborations) - Aci aggregate testing technician - level 1 - section 1>> questions and answers ...
11. Exam (elaborations) - Aci - aggregate base testing technician exam | questions and answers
12. Exam (elaborations) - Aci grade 1 written exam >>questions with correct answers 100% accurate.
Show more
ACI GRADE 1 FIELD TESTING CERTIFICATION PRACTICE TEST QUESTIONS AND ANSWERS |LATEST 2024 WITH CORRECT ANSWERS For BBBconcrete BBBwith BBBaggregates BBBless BBBthan BBB3 BBBinches, BBBthe BBBthermometer BBBmust BBBremain BBBin BBBthe BBBfresh BBBconcrete BBBsample BBBa BBBminimum BBBof BBB5 BBBminutes BBBor BBBuntil BBBthe BBBtemperature BBBreading BBBstabilizes. BBB(True BBBor BBBFalse) BBB- BBBcorrect BBBanswersFalse The BBBtemperature BBBmeasuring BBBdevice BBBmust BBBbe BBBaccurate BBBto BBBwithin BBB0.1 BBBdegrees. BBB(True BBBor BBBFalse) BBB- BBBcorrect BBBanswersFalse The BBBtemperature BBBmeasuring BBBdevice BBBshall BBBhave BBBa BBBcapacity BBBof BBBmeasuring BBBtemperature BBBof BBBfreshly BBBmixed BBBconcrete BBBthroughout BBBa BBBrange BBBof BBB______ BBBto BBB_____ _ BBBFahrenheit BBB( BBB- BBBcorrect BBBanswers A BBBcomposite BBBsample BBBis BBBnot BBBneeded BBBif BBBonly BBBthe BBBtemperature BBBtest BBBis BBBbeing BBBrun. BBB(True BBBor BBBFalse) BBB- BBBcorrect BBBanswersTrue The BBBtemperature BBBof BBBfresh BBBconcrete BBBin BBBa BBBplacement BBBmust BBBbe BBBmeasured BBBby BBBinserting BBBa BBBthermometer BBBinto BBBthe BBBtop BBBsix BBBinches BBBof BBBconcrete. BBB(True BBBor BBBFalse) BBB- BBBcorrect BBBanswersFalse The BBBtemperature BBBof BBBthe BBBconcrete BBBis BBBrecorded BBBto BBBthe BBBnearest BBB_______ BBBFahrenheit BBB(______ BBBCelcius). BBB- BBBcorrect BBBanswers2, BBB0.5 ASTM BBBC1064 BBBstates BBBthe BBBcontainer BBBused BBBto BBBmeasure BBBtemperature BBBof BBBconcrete BBBmust BBBbe BBBlarge BBBenough BBBto BBBprovided BBBat BBBleast BBB5 BBBinches BBBof BBBconcrete BBBaround BBBthe BBBsensor. BBB(True BBBor BBBFalse) BBB- BBBcorrect BBBanswers Calibrate BBBthe BBBtemperature BBBmeasuring BBBdevice BBBat BBBleast BBB_________, BBBor BBBat BBBleast BBBwhenever BBBthere BBBis BBBa BBBquestion BBBof BBBaccuracy. BBB- BBBcorrect BBBanswersAnnua lly After BBBthe BBBthermometer BBBis BBBplaced BBBin BBBthe BBBconcrete: BBB- BBBcorrect BBBanswersGently BBBpress BBBconcrete BBBaround BBBthe BBBthermometer According BBBto BBBASTM BBBC1064, BBBwhat BBBis BBBone BBBreason BBBto BBBtake BBBthe BBBtemperature BBBof BBBconcrete? BBB- BBBcorrect BBBanswersVerify BBBconformance It BBBis BBBallowable BBBto BBBremove BBBthe BBBtemperature BBBmeasuring BBBdevices BBBfrom BBBthe BBBfreshly BBBmixed BBBconcrete BBBto BBBread BBBthe BBBtemperature BBBif BBByou BBBcannot BBBsee BBBthe BBBreading. BBB(True BBBor BBBFalse) BBB- BBBcorrect BBBanswers The BBBmaximum BBBallowable BBBtime BBBbetween BBBobtaining BBBthe BBBfirst BBBand BBBlast BBBportions BBBof BBBthe BBBcomposite BBBsampl e BBBmay BBBnot BBBexceed BBB5 BBBminutes. BBB(True BBBor BBBFalse) BBB- BBBcorrect BBBanswers Start BBBmolding BBBspecimens BBBfor BBBstrength BBBtests BBBwithin BBB30 BBBminutes BBBafter BBBfabricating BBBthe BBBcomposite BBBsample. BBB(True BBBor BBBFalse) BBB- BBBcorrect BBBanswers The BBBcomposite BBBconcrete BBBsample BBBmust BBBbe BBBprotected BBBfrom BBBsun, BBBwind, BBBcontamination, BBBand BBBrapid BBBevaporation. BBB(True BBBor BBBFalse) BBB- BBBcorrect BBBanswers If BBBthe BBBconcrete BBBcontains BBBaggregates BBBlarger BBBthan BBBthose BBBthat BBBare BBBappropriate BBBfor BBBa BBBsize BBBof BBBmold BBBor BBBequipment BBBused, BBBthe BBBsample BBBshould BBBbe BBBwet-sieved BBBbefore BBBmaking BBBthe BBBtest. BBB(True BBBor BBBFalse) BBB- BBBcorrect BBBanswers The BBBcomposite BBBsample BBBshould BBBnot BBBbe BBBremixed BBBbefore BBBbeginning BBBany BBBtests. BBB(True BBBor BBBFalse) BBB- BBBcorrect BBBanswers Sampling BBBshould BBBnormally BBBbe BBBperformed, BBBas BBBthe BBBconcrete BBBis BBBdischarged BBBfrom BBBthe BBBmixer. BBB(True BBBor BBBFalse) BBB- BBBcorrect BBBanswers ASTM BBBMethod BBBC172 BBBincludes BBBsampling BBBfrom BBBstationary BBBmixers, BBBpaving BBBmixers, BBBtruck BBBmixers, BBBagitators, BBBand BBBnon-agitating BBBequipment. BBB(True BBBor BBBFalse) BBB- BBBcorrect BBBanswers After BBBsampling BBBis BBBcompleted, BBBstart BBBthe BBBtests BBBfor BBBslump BBBand BBBair BBBcontent BBBwithin: BBB- BBBcorrect BBBansw ers In BBBany BBBcase, BBBdo BBBnot BBBobtain BBBsamples BBBuntil: BBB- BBBcorrect BBBanswers No BBBsamples BBBshall BBBbe BBBtaken BBBbefore BBB_________ BBBor BBBafter BBB_________ BBBof BBBthe BBBbatch BBBhas BBBbeen BBBdischarged. BBB- BBBcorrect BBBanswers When BBBstrength BBBtests BBBare BBBto BBBbe BBBmade, BBBthe BBBminimum BBBsize BBBof BBBthe BBBcomposite BBBsampl e BBBshall BBBbe: BBB- BBBcorrect BBBanswers Sample BBBthe BBBconcrete BBBfrom BBBthe BBBchute BBBof BBBa BBBtruck BBBmixer BBBby: BBB- BBBcorrect BBBanswers Fresh BBBconcrete BBBto BBBbe BBBtested BBBat BBBthe BBBjob BBBsite BBBshould BBBbe BBBsampled BBBfrom: BBB- BBBcorrect BBBanswers The BBBelapsed BBBtime BBBbetween BBBobtaining BBBthe BBBfirst BBBand BBBfinal BBBportions BBBof BBBthe BBBcomposite BBBsample, BBBaccording BBBto BBBASTM BBBC172, BBBshall BBBnot BBBexceed: BBB- BBBcorrect BBBanswers