Have you previously done design for electrical work?
o Yes
o No
If yes, the following two items must be answer
a- What facilities or buildings you designed?
o Commercial
o Residential
o Industrial
o Medical/Health Care
o Educational/Schools
o Hotels
o Power Plant/S...
و اﻟﺴﻼم ﻋﻠﻴﻜﻢ و رﺣﻤﺔ اﷲ و ﺑﺮآﺎﺗﻪ.
اﺧﻮآﻢ /ﻣﺤﻤﻮد ﻋﺼﺎم ﺣﺰﻩ
, T op Ele c t ric a l De sign Prepared by: Mahmoud Essam Hizzah
Que st ions & Answ e rs Electrical Design Engineer
1) Have you previously done design for electrical work?
o Yes
o No
If yes, the following two items must be answer
a- What facilities or buildings you designed?
o Commercial
o Residential
o Industrial
o Medical/Health Care
o Educational/Schools
o Hotels
o Power Plant/Stations
o Sports
o Exterior Site Work
o Others: Please specify:
b- What Standards or Norm you used in your design?
o French
o American
o British
o IEC
o Others: Please specify:
2) Have you previously done shop drawing (execution) for electrical (high current) work?
o Yes
o No
3) Are you familiar and have used the following computer software’s:
o MS Word
o MS Excel
o AutoCAD
o Lighting Calculation Programs: Please specify:
o Voltage Drop Calculation Programs: Please specify:
o Short Circuit Calculation Programs: Please specify:
o Others: Please specify:
-1-
st
1 Edition Best Wishes
, T op Ele c t ric a l De sign Prepared by: Mahmoud Essam Hizzah
Que st ions & Answ e rs Electrical Design Engineer
4) What are the de-rating factors considered in cable installation?
Answer:
- Ground Temperature de-rating factor
- Air Temperature de-rating factor
- Burial Depth de-rating factor
- Soil Thermal Resistivity de-rating factor
- PVC Rated Temperature de-rating factor
- Trefoil or Flat Formation de-rating factor for three & single core cables laid direct in ground
- Trefoil Formation de-rating factors for multi-core cables laid direct in ground
- Reduction factors for groups of more than one multi-core cable in air to be applied to the current
carrying capacity for one multi-core cable in free air
- Reduction factors for groups of more than one circuit of single core cables to be applied to the current
carrying capacity for one circuit of single core cables in free air
5) What are the types of contracts? State the difference between them?
Answer:
- Lump Sum
- Re-measured
- Cost Plus
6) What are the precautions to be taken in mind when selecting an emergency feeder running next to another
feeder fed from normal supply?
Answer:
- Type of the used designed cable should be taken into consideration regarding its properties & to be of
higher fire resistance.
7) What is the national color code of a three phase circuit?
Answer:
- Red for phase (A)
- Yellow for phase (B)
- Blue for phase (C)
- Black for neutral (N)
- Yellow with green strip for protective earth (PE)
-2-
st
1 Edition Best Wishes
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through credit card for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying these notes from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller TIFFACADEMICS. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy these notes for £18.02. You're not tied to anything after your purchase.