Exam (elaborations)
ICC Prestressed Concrete - Codes and Plans Certification Preparation Test with correct Solutions |Latest 2024/2025
Module
ICC Prestressed Concrete - Codes and Plans
Institution
ICC Prestressed Concrete - Codes And Plans
ICC Prestressed Concrete - Codes and Plans Certification Preparation Test with correct Solutions |Latest 2024/2025
[Show more]
Preview 3 out of 24 pages
Uploaded on
August 29, 2024
Number of pages
24
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
Institution
ICC Prestressed Concrete - Codes and Plans
Module
ICC Prestressed Concrete - Codes and Plans
£10.56
Also available in package deal from £73.52
Added
Add to cart
Add to wishlist
100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached
Also available in package deal (1)
ICC (International Code Council) certification Exams PACKAGE DEAL | BUNDLE contains the latest exams solutions including practice tests , prep tests and updated study guide - Everything you need to pass ICC certifications is here!!
£ 182.81
£ 73.52
20 items
1. Exam (elaborations) - Icc accessibility exam study guide quiz with complete solutions | latest 2024/2025
2. Exam (elaborations) - Icc sample exam questions with verified answers |latest 2024/2025
3. Exam (elaborations) - Icc general requirements test with approved answers |latest 2024/2025
4. Exam (elaborations) - Icc general requirements practice test with correct answers |latest 2024/2025
5. Exam (elaborations) - Icc reinforced concrete test with verified answers |latest 2024/2025
6. Exam (elaborations) - Icc / ust test questions with verified answers |latest 2024/2025
7. Exam (elaborations) - Icc structural steel test with verified answers |latest 2024/2025
8. Exam (elaborations) - Icc exam study guide questions with verified answers |latest 2024/2025
9. Exam (elaborations) - Icc b1 exam definitions with verified solutions | latest 2024/2025
10. Exam (elaborations) - Icc soils certification quiz with complete solutions |latest 2024/2025
11. Exam (elaborations) - Icc electrical test with verified solutions |latest 2024/2025
12. Exam (elaborations) - 2024 icc concrete test with complete solutions |latest 2024/2025
13. Exam (elaborations) - Icc vapor recovery 1 test with complete solutions |latest 2024/2025
14. Exam (elaborations) - 2024 icc residential electrical exam study guide with complete solutions |latest 2024...
15. Exam (elaborations) - Masonry icc test with verified answers |latest 2024/2025
16. Exam (elaborations) - Icc (u2) decommissioning test with verified answers |latest 2024/2025
17. Exam (elaborations) - Icc ast installation/ retrofitting study guide with complete solutions |latest 2024/2...
18. Exam (elaborations) - Icc prestressed concrete - codes and plans certification preparation test with correc...
19. Exam (elaborations) - Icc california ust inspector exam test bank with 100% correct answers |latest 2024/20...
20. Exam (elaborations) - Icc special inspector gr quiz with complete solutions |latest 2024/2025
Show more
ICC Prestressed Concrete - Codes and
__.- __.- __.- __.- __.- __.-
Plans Certification Preparation Test with
__.- __.- __.- __.- __.-
correct Solutions. __.-
Module__.-1.__.-Prestressed__.-concrete__.-is:__.-__.- __.--__.-The__.-tensioning__.-of__.-steel-
stranded__.-cables__.-prior__.-to__.-concrete__.-placement
-__.-The__.-tensioning__.-of__.-steel-stranded__.-cables__.-after__.-concrete__.-has__.-been__.-
placed__.-and__.-hardened
-__.-Concrete__.-that__.-has__.-received__.-a__.-tensile__.-load__.-prior__.-to__.-any__.-service__.-
loads
Module__.-1.__.-The__.-use__.-of__.-a__.-prestressed__.-concrete__.-system__.-will__.-achieve__.-
the__.-following:__.-__.- __.--__.-Reduced__.-thickness__.-of__.-concrete,__.-less__.-
conventional__.-reinforcing__.-steel__.-and__.-adequate__.-crack__.-control
Module__.-1.__.-Once__.-tensioned,__.-the__.-tensioning__.-cables__.-are__.-held__.-securely__.-
in__.-a__.-tensioned__.-state__.-by:__.-__.- __.-Wedges__.-that__.-have__.-been__.-seated
Module__.-1.__.-The__.-end__.-of__.-a__.-cable__.-that__.-terminates__.-within__.-a__.-concrete__.-
slab,__.-thus__.-rendering__.-it__.-in__.-accessible__.-from__.-outside__.-the__.-concrete__.-is__.-
known__.-as:__.-__.- __.-The__.-dead__.-end
Module__.-1.__.-The__.-presence__.-of__.-sheathing__.-on__.-a__.-wire-stranded__.-cable__.-
indicates__.-that:__.-__.- __.-It__.-will__.-be__.-used__.-in__.-an__.-unbonded__.-system__.-
application
,Module__.-1.__.-The__.-most__.-common__.-post-tension__.-cable__.-tendons__.-in__.-use__.-
today__.-are__.-made__.-up__.-of:__.-__.- __.-7__.-steel__.-strands__.-of__.-wire__.-wrapped__.-
together
Module__.-1.__.-In__.-an__.-unbonded__.-system,__.-the__.-force__.-applied__.-to__.-the__.-
concrete__.-after__.-tensioning:__.-__.- __.-Comes__.-from__.-the__.-anchorage__.-zone__.-only
Module__.-2.__.-Post-tension__.-manufacturing__.-plants__.-must__.-be__.-certified__.-by:__.-__.-
__.-PTI__.-Unbonded__.-Plant__.-Certification__.-Program
Module__.-2.__.-Prior__.-to__.-cutting__.-the__.-tendon__.-tails__.-after__.-tensioning,__.-the__.-
field__.-records__.-of__.-stressing__.-activities__.-must__.-be__.-forwarded__.-to__.-and__.-
approved__.-by:__.-__.- __.-The__.-engineer__.-of__.-record
Module__.-2.__.-In__.-the__.-event__.-that__.-a__.-new__.-set__.-of__.-stressing__.-equipment__.-is__.-
delivered__.-to__.-the__.-project,__.-this__.-equipment__.-should__.-contain__.-____________.-
for__.-review__.-prior__.-being__.-used__.-on-site:__.-__.- __.-A__.-current__.-calibration__.-
chart__.-relating__.-gauge__.-pressure__.-to__.-force__.-applied
Module__.-2.__.-According__.-to__.-the__.-Field__.-Procedures__.-Manual__.-for__.-Unbonded__.-
Single__.-Strand__.-Tendons,__.-all__.-of__.-the__.-following__.-items__.-are__.-necessary__.-for__.-
post-tension__.-document__.-control__.-except:
A)__.-Concrete__.-Strength__.-Results
B)__.-Shipping__.-Lists
C)__.-Material__.-Certifications
D)__.-Approved__.-Installation__.-Drawings__.-__.- __.- A)__.-Concrete__.-Strength__.-Results
, Module__.-2.__.-When__.-reporting__.-stressing__.-results,__.-the__.-following__.-information__.-
is__.-necessary__.-to__.-record:
A)__.-Jack__.-and__.-gauge__.-serial__.-number
B)__.-Elongation__.-measurements__.-and__.-percentage__.-deviation
C)__.-Both__.-A__.-and__.-B
D)__.-Gauge__.-Manufacturer
E)__.-All__.-three,__.-A,__.-B,__.-and__.-D__.-__.- __.- C)__.-Both__.-A__.-and__.-B
Module__.-2.__.-When__.-moving__.-post-tension__.-cables__.-across__.-the__.-site,__.-the__.-
use__.-of__.-_________.-is__.-permitted.__.-
A)__.-Nylon__.-slings,__.-with__.-unloading__.-as__.-close__.-as__.-placement__.-as__.-possible
B)__.-Smooth__.-finished__.-chains__.-with__.-limited__.-use
C)__.-Epoxy__.-coated__.-high__.-strength__.-wire__.-with__.-limited__.-use
D)__.-A__.-large__.-front__.-loader__.-exercising__.-caution__.-__.- __.-Nylon__.-slings,__.-with__.-
unloading__.-as__.-close__.-to__.-the__.-placement__.-as__.-possible
Module__.-2.__.-When__.-storing__.-post-tension__.-cables,__.-care__.-must__.-be__.-taken__.-to:__.-
__.- __.-Prevent__.-the__.-cables__.-from__.-being__.-exposed__.-to__.-weather__.-elements__.-
and__.-moisture
Module__.-2.__.-During__.-deliver,__.-it__.-is__.-the__.-________________.-responsibility__.-to__.-
ensure__.-the__.-delivered__.-items__.-match__.-the__.-shipping__.-list.__.-__.- __.-Buyer's
Module__.-2.__.-According__.-to__.-the__.-Field__.-Procedures__.-Manual__.-for__.-Unbonded__.-
Single__.-Strand__.-Tendons,__.-the__.-follow__.-documents__.-must__.-be__.-kept__.-on__.-site:__.-
__.- __.-1)__.-Approved__.-Installation__.-Drawings