100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
ICC Prestressed Concrete - Codes and Plans Certification Preparation Questions and Answers 100% Solved £13.50   Add to cart

Exam (elaborations)

ICC Prestressed Concrete - Codes and Plans Certification Preparation Questions and Answers 100% Solved

 11 views  0 purchase
  • Module
  • Institution

ICC Prestressed Concrete - Codes and Plans Certification Preparation Questions and Answers 100% Solved Module 1. Prestressed concrete is: - The tensioning of steel-stranded cables prior to concrete placement - The tensioning of steel-stranded cables after concrete has been placed and hardened -...

[Show more]

Preview 2 out of 13  pages

  • September 7, 2024
  • 13
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
avatar-seller
ICC Prestressed Concrete - Codes and
Plans Certification Preparation
Questions and Answers 100% Solved

Module 1. Prestressed concrete is: - answer- The tensioning of steel-stranded cables
prior to concrete placement
- The tensioning of steel-stranded cables after concrete has been placed and hardened
- Concrete that has received a tensile load prior to any service loads

Module 1. The use of a prestressed concrete system will achieve the following: -
answer- Reduced thickness of concrete, less conventional reinforcing steel and
adequate crack control

Module 1. Once tensioned, the tensioning cables are held securely in a tensioned state
by: - answer Wedges that have been seated

Module 1. The end of a cable that terminates within a concrete slab, thus rendering it in
accessible from outside the concrete is known as: - answer The dead end

Module 1. The presence of sheathing on a wire-stranded cable indicates that: - answer
It will be used in an unbonded system application

Module 1. The most common post-tension cable tendons in use today are made up of: -
answer7 steel strands of wire wrapped together

Module 1. In an unbonded system, the force applied to the concrete after tensioning: -
answer Comes from the anchorage zone only

Module 2. Post-tension manufacturing plants must be certified by: - answer PTI
Unbonded Plant Certification Program

Module 2. Prior to cutting the tendon tails after tensioning, the field records of stressing
activities must be forwarded to and approved by: - answer The engineer of record

Module 2. In the event that a new set of stressing equipment is delivered to the project,
this equipment should contain __________ for review prior being used on-site: - answer
A current calibration chart relating gauge pressure to force applied

, Module 2. According to the Field Procedures Manual for Unbonded Single Strand
Tendons, all of the following items are necessary for post-tension document control
except:
A) Concrete Strength Results
B) Shipping Lists
C) Material Certifications
D) Approved Installation Drawings - answerA) Concrete Strength Results

Module 2. When reporting stressing results, the following information is necessary to
record:
A) Jack and gauge serial number
B) Elongation measurements and percentage deviation
C) Both A and B
D) Gauge Manufacturer
E) All three, A, B, and D - answerC) Both A and B

Module 2. When moving post-tension cables across the site, the use of _______ is
permitted.
A) Nylon slings, with unloading as close as placement as possible
B) Smooth finished chains with limited use
C) Epoxy coated high strength wire with limited use
D) A large front loader exercising caution - answerNylon slings, with unloading as close
to the placement as possible

Module 2. When storing post-tension cables, care must be taken to: - answerPrevent
the cables from being exposed to weather elements and moisture

Module 2. During deliver, it is the ______________ responsibility to ensure the
delivered items match the shipping list. - answerBuyer's

Module 2. According to the Field Procedures Manual for Unbonded Single Strand
Tendons, the follow documents must be kept on site: - answer1) Approved Installation
Drawings
2) Shipping Lists
3) Material Certifications
4) Jack Calibrations
5) Stressing Records

Module 2. Install drawings show: - answerPlan views, elevation views, and details so
the subcontractor and inspector can clearly see the tendon layout. This includes tendon
profiles, also known as drape.

Module 2. Drape - answerTendon profiles

Module 2. Material Certifications - answerDocuments that describe the cables' physical
properties and factory testing results.

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller julianah420. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for £13.50. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

67474 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy revision notes and other study material for 14 years now

Start selling
£13.50
  • (0)
  Add to cart