100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
ACI Concrete Field Testing Technician- Grade I latest Q&A £15.86   Add to cart

Exam (elaborations)

ACI Concrete Field Testing Technician- Grade I latest Q&A

 0 view  0 purchase

ACI Concrete Field Testing Technician- Grade I latest Q&A

Preview 3 out of 18  pages

  • September 9, 2024
  • 18
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
All documents for this subject (51)
avatar-seller
HELLENAH
ACI Concrete Field Testing Technician- Grade I latest
2024-2025 Q&A
Quiz :The sensor of the temperature measuring device shall be submerged
a minimum of _____ in. [_____mm] into the freshly mixed concrete. -
Answer :3 in. [75 mm]



Quiz :The temperature measuring device shall have a capacity of
measuring temperature of freshly mixed concrete to +- _____ degrees F [+-
_____ C] throughout a range of _____. - Answer :1 degree F [0.5 C], 30
degrees F to 120 F [0 C to 50 C]



Quiz :The temperature measuring device shall be calibrated _____, or
whenever there is a question of _____. - Answer :Annually, accuracy



Quiz :The temperature of concrete may be measured in a wheelbarrow.
True or False? - Answer :True



Quiz :The temperature of concrete may be measured in a wall form. True
of False - Answer :True



Quiz :A composite sample of concrete is required even if the only purpose
for obtaining the sample is to determine temperature. True of False? -
Answer :False



Quiz :What must be done to the sample container prior to sampling the
concrete? - Answer :Dampen (with water)



Quiz :What must be done to the concrete surrounding the temperature
measuring device after the device is submerged in the fresh concrete. -

,Answer :Gently press the concrete around the temperature measuring
device at the surface of the concrete



Quiz :How long must the temperature measuring device remain in the
freshly mixed concrete? - Answer :At least 2 minutes but not more than 5
minutes



Quiz :After the temperature of the concrete is read, what is required? -
Answer :Reporting of temperature



Quiz :The temperature of concrete is reported to the nearest _____ degrees
F [_____ C] - Answer :1 degree F [0.5 C]



Quiz :According to ASTM C1064, what is one reason to take the
temperature of concrete? - Answer :Verify conformance to a specified
requirement for temperature of concrete



Quiz :A maximum temperature of freshly mixed concrete is specified in
ASTM C1064. True of False? - Answer :False



Quiz :The sample of concrete used for temperature determination must be
rodded 25 times. True or False? - Answer :False



Quiz :Sampling by this method is required when tests are to be made to
determine _____ with specification requirements. - Answer :Compliance



Quiz :This method covers sampling from four types of mixtures which are
_____, _____, _____, and _____. - Answer :Stationary mixers, paving mixers,
revolving drum mixers, and open top mixers

, Quiz :The maximum allowable time between obtaining the first and final
portions of a composite sample is _____ minutes. - Answer :15



Quiz :Portions of a composite sample shall be thoroughly remixed bfore
beginning tests on the sample. True of False? - Answer :True



Quiz :The maximum elapsed time allowed between obtaining the final
portion of the composite sample and beginning the tests for slump,
temperature, and air content is _____ minutes. - Answer :5



Quiz :The molding of strength test specimens shall begin within _____
minutes after fabricating the composite sample. - Answer :15



Quiz :The concrete sample must be protected from contamination and
_____. - Answer :Rapid evaporation



Quiz :The minimum size sample for making strength test specimens is
_____. - Answer :28 L (1ft^3)



Quiz :When sampling from a stationary mixer, the batch must be sampled
at _____ or more regularly spaced intervals during discharge of the middle
portion of the batch - Answer :2



Quiz :The composite sample for a paving mixer must represent a minimum
of _____ different portions of the batch of concrete taken from the pile after
discharge. - Answer :5

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller HELLENAH. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for £15.86. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

75323 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy revision notes and other study material for 14 years now

Start selling
£15.86
  • (0)
  Add to cart