ASQ Lean Six Sigma Green Belt Exam Questions with Correct Answers £13.10   Add to cart

Exam (elaborations)

ASQ Lean Six Sigma Green Belt Exam Questions with Correct Answers

 4 views  0 purchase
  • Module
  • Six Sigma Green Belt
  • Institution
  • Six Sigma Green Belt

Defects - Answer-No more than 3.4 million defects per million opportunities Pareto Principle - Answer-Roughly 80% of the effects come from 20% of the causes. Juran Trilogy - Answer-Quality planning, Improvement cycle, Quality control Control Charts - Answer-Graphic presentations of process...

[Show more]

Preview 3 out of 18  pages

  • September 10, 2024
  • 18
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • Six Sigma Green Belt
  • Six Sigma Green Belt
avatar-seller
ASQ Lean Six Sigma Green Belt Exam
Questions with Correct Answers
Defects - Answer-No more than 3.4 million defects per million opportunities

Pareto Principle - Answer-Roughly 80% of the effects come from 20% of the causes.

Juran Trilogy - Answer-Quality planning, Improvement cycle, Quality control

Control Charts - Answer-Graphic presentations of process data over time, with
predetermined control limits

assignable causes of variation - Answer-any variation-causing factors that can be
identified and eliminated

PDCA cycle - Answer-a plan-do-check-act cycle using observed data for continuous
improvement of operations

Ishikawa - Answer-Ishikawa = Fishbone Diagram: cause and effect.

Walter Shewhart - Answer-Statistical Quality Control

measurable objectives - Answer-defined targets established to measure improvements
in quality

Voice of the Customer (VOC) - Answer-Data that represents the needs and wants of
your customers.

customer loyalty - Answer-when customers buy a product from the same supplier again
and again

Risk of defects - Answer-To lower, reduce the number of suppliers

Reducing inventory - Answer-To lower maintaining capital from the company

cost efficiency - Answer-achieving a desired level of outputs with a minimal level of
inputs and resources

balanced scorecard - Answer-Project meets company's goal and customers needs with
4 perspectives: financial, customer, internal business processes, and employee learning
and growth

Lean - Answer-Improve customer loyalty and product quality by reducing waste

,Color scorecard metrics - Answer-Red, Yellow, Green

Lean vs Six Sigma - Answer-Eliminating waste vs Increasing quality

Theory of Constraints - Answer-Profit improvement by Greater gain comes from
identifying which parts of the process is a constraint to the whole

change agent - Answer-someone who is a catalyst in helping organizations to deal with
old problems in new ways

Theory of Constraints- profits - Answer-Operating expense, inventory = reduce

Throughput= create and deliver product to customer/generate money, increase

Lean Management - Answer-Reducing waste and cost in a methodical manner to
optimize processes.

Five principles: Value, Value stream, Flow and pull, Empowerment, Perfection

Information flows - Answer-The way the customer interacts with the company

Data that moves throughout the supply chain

Inventory lead times - Answer-Time line

Current value stream map - Answer-8 types of waste

Rework - Answer-Defect

Waiting - Answer-Form of waste

Overproduction - Answer-Form of waste

A condition in which production of goods exceeds the demand for them

Transport - Answer-Poor layout on warehouse or production floor

Key Performance Indicators (KPIs) - Answer-The quantifiable metrics a company uses
to evaluate progress toward critical success factors

DMAIC Cycle - Answer-Define, Measure, Analyze, Improve, Control

DFSS Key Tools - Answer-Create or redesign a product or process

DMADV methodology - Answer-(Define, Measure, Analyze, Design, Verify)

, IDOV - Answer-Identify, Design, Optimize, Verify

FMEA key measures - Answer-severity, frequency of occurrence and ease of detection

PFM stands for - Answer-Potential failure mode

RPNs - Answer-Risk Priority Number

Severity x Occurrence x Detection

Value of RPN - Between 1 and 1000
A corrective action is required for any RPN value higher than 80.

Criticality - Answer-Severity x Occurence

DFMEA - Answer-Design FMEA - product malfunctions

PFMEA - Answer-Process FMEA - potential failures that can lead to customer
dissatisfaction

descriptive statistics - Answer-statistics that summarize the population in a study

Temperature on y axis - Answer-Represents the Response

Capability index - Answer-Increased when process improvement is improved

Pareto chart - Answer-Identify and quantify the source of a problem

Linear - Answer-Correlation analysis used to provide a numeric value between two
variables

A critical to quality (CTQ) tree - Answer-Translate broad requirements into specific
requirements

matrix diagram - Answer-A diagram that shows the relationship of components to a
whole.

Used extensively in Quality Function Deployment (QFD)

P - Answer-Control chart used to monitor discrete data

Oval - Answer-Used to present a termination point in a flowchart

normal distribution - Answer-95%

0.05 - Answer-Commonly accepted level for alpha risk

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller lectknancy. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for £13.10. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

84197 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy revision notes and other study material for 14 years now

Start selling
£13.10
  • (0)
  Add to cart