Defects - Answer-No more than 3.4 million defects per million opportunities
Pareto Principle - Answer-Roughly 80% of the effects come from 20% of the causes.
Juran Trilogy - Answer-Quality planning, Improvement cycle, Quality control
Control Charts - Answer-Graphic presentations of process...
ASQ Lean Six Sigma Green Belt Exam
Questions with Correct Answers
Defects - Answer-No more than 3.4 million defects per million opportunities
Pareto Principle - Answer-Roughly 80% of the effects come from 20% of the causes.
Juran Trilogy - Answer-Quality planning, Improvement cycle, Quality control
Control Charts - Answer-Graphic presentations of process data over time, with
predetermined control limits
assignable causes of variation - Answer-any variation-causing factors that can be
identified and eliminated
PDCA cycle - Answer-a plan-do-check-act cycle using observed data for continuous
improvement of operations
Ishikawa - Answer-Ishikawa = Fishbone Diagram: cause and effect.
Walter Shewhart - Answer-Statistical Quality Control
measurable objectives - Answer-defined targets established to measure improvements
in quality
Voice of the Customer (VOC) - Answer-Data that represents the needs and wants of
your customers.
customer loyalty - Answer-when customers buy a product from the same supplier again
and again
Risk of defects - Answer-To lower, reduce the number of suppliers
Reducing inventory - Answer-To lower maintaining capital from the company
cost efficiency - Answer-achieving a desired level of outputs with a minimal level of
inputs and resources
balanced scorecard - Answer-Project meets company's goal and customers needs with
4 perspectives: financial, customer, internal business processes, and employee learning
and growth
Lean - Answer-Improve customer loyalty and product quality by reducing waste
,Color scorecard metrics - Answer-Red, Yellow, Green
Lean vs Six Sigma - Answer-Eliminating waste vs Increasing quality
Theory of Constraints - Answer-Profit improvement by Greater gain comes from
identifying which parts of the process is a constraint to the whole
change agent - Answer-someone who is a catalyst in helping organizations to deal with
old problems in new ways
Theory of Constraints- profits - Answer-Operating expense, inventory = reduce
Throughput= create and deliver product to customer/generate money, increase
Lean Management - Answer-Reducing waste and cost in a methodical manner to
optimize processes.
Five principles: Value, Value stream, Flow and pull, Empowerment, Perfection
Information flows - Answer-The way the customer interacts with the company
Data that moves throughout the supply chain
Inventory lead times - Answer-Time line
Current value stream map - Answer-8 types of waste
Rework - Answer-Defect
Waiting - Answer-Form of waste
Overproduction - Answer-Form of waste
A condition in which production of goods exceeds the demand for them
Transport - Answer-Poor layout on warehouse or production floor
Key Performance Indicators (KPIs) - Answer-The quantifiable metrics a company uses
to evaluate progress toward critical success factors
DMAIC Cycle - Answer-Define, Measure, Analyze, Improve, Control
DFSS Key Tools - Answer-Create or redesign a product or process
FMEA key measures - Answer-severity, frequency of occurrence and ease of detection
PFM stands for - Answer-Potential failure mode
RPNs - Answer-Risk Priority Number
Severity x Occurrence x Detection
Value of RPN - Between 1 and 1000
A corrective action is required for any RPN value higher than 80.
Criticality - Answer-Severity x Occurence
DFMEA - Answer-Design FMEA - product malfunctions
PFMEA - Answer-Process FMEA - potential failures that can lead to customer
dissatisfaction
descriptive statistics - Answer-statistics that summarize the population in a study
Temperature on y axis - Answer-Represents the Response
Capability index - Answer-Increased when process improvement is improved
Pareto chart - Answer-Identify and quantify the source of a problem
Linear - Answer-Correlation analysis used to provide a numeric value between two
variables
A critical to quality (CTQ) tree - Answer-Translate broad requirements into specific
requirements
matrix diagram - Answer-A diagram that shows the relationship of components to a
whole.
Used extensively in Quality Function Deployment (QFD)
P - Answer-Control chart used to monitor discrete data
Oval - Answer-Used to present a termination point in a flowchart
normal distribution - Answer-95%
0.05 - Answer-Commonly accepted level for alpha risk
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through credit card for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying these notes from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller lectknancy. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy these notes for £13.10. You're not tied to anything after your purchase.