100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
ACQ101 Fundamentals of Systems Acquisition Management Lesson 4 £6.98   Add to cart

Exam (elaborations)

ACQ101 Fundamentals of Systems Acquisition Management Lesson 4

 4 views  0 purchase

ACQ101 Fundamentals of Systems Acquisition Management Lesson 4

Preview 2 out of 5  pages

  • September 10, 2024
  • 5
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
All documents for this subject (1)
avatar-seller
Victorious23
ACQ101 Fundamentals of Systems
Acquisition Management Lesson 4
Which of the following are purposes of the Defense Acquisition System? - -A.
Develop technology
B. Produce weapons system.
C. Provide logistics support.

-Documents produced during the JCIDS process are used to support Defense
Acquisition System milestone decisions? - -True

-Which of the following are characteristics of the Material Solution Analysis
phase? - -a. The AoA is conducted.
b. A PM is selected and a program office is established.
c. Promising technologies are analyzed to determined which one is best
suited to meet validated requirements.

-The results of the basis for which of following? - -Acquisition Strategy.

-Which one of the following is considered a primary goal of an Acquisition
Strategy? - -Minimize the time and cost needed to satisfy validated needs.

-Which term is defined as the minimum acceptable value for the
performance that is necessary to satisfy an identified need? - -Threshold.

-Which of the following are considered parameters of the Acquisition
Program Baseline? Select all that apply. - -a. Cost
b. Performance.
c. Schedule.

-A successful Milestone A decision leads to entry into which phase? - -
Technology Maturation and Risk reduction.

-The AS must be approved by the MDA prior to what? - -Release of a formal
solicitation.

-The MDA must approve which of the following for a program to successfully
complete Milestone A? (Select All the apply).
. - -a. The proposed material solution.
b. The Acquisition Strategy.
c. A life Cycle Sustainment Plan

-When does a program enter the TMRR phase? - -When the AoA has been
completed and the MDA has approved the AS.

, -Which of the following are goals of the TMRR phase? (Select all that apply) -
-a. Reduce technology risk.
b. Demonstrate critical technologies through prototyping.
c. Conduct a preliminary design review.

-True or False? One of the requirements for a project to exit the TMRR phase
is that the technology has been demonstrated in a relevant environment. - -
True

-What is the purpose of Milestone B? - -Initiate engineering and
manufacturing development.

-Which of the following are key considerations of the EMD phase? (Select all
that apply) - -a. Completes all needed hardware and software detailed
design.
b. Systemically retires any open risks.
c. Prepares for production and deployment.

-Which of the following is a responsibility of the PM during EMD phase? - -
Finalizing designs of the product support elements

-Which of the following are considerations for Milestone C? (Select all that
apply). - -a. Cost estimates.
b. Environmental issues.
c. Manpower estimates.

-True or False? An updated Acquisition Program Baseline is required for
Milestone C approval. - -True.

-MDA decisions made during the Production and deployment phase are
documented where? - -Acquisition Decision Memorandum.

-True or False? Acquisition programs enter the Full Rate Production and
Deployment after completing the Life Cycle Sustainment Plan. - -False

-The Operations and Support phase is based in what? - -An MDA-approved
LCSP.

-True or False? PMs are encouraged but not required to establish organic
depot maintenance capabilities? - -False.

-Which of the following are PM considerations during the Disposal? (Select
all that apply). - -a. Complete reuse or recycling of system components and
materials.
b. Waste disposal.

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller Victorious23. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for £6.98. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

72042 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy revision notes and other study material for 14 years now

Start selling
£6.98
  • (0)
  Add to cart