APM Project Management Questions And Answers 100% Guaranteed Success.

 2 views  0 purchase
  • Module
  • APM:
  • Institution
  • APM:

APM Project Management Questions And Answers 100% Guaranteed Success. Hold Harmless Agreement - correct answer.A contractual agreement that transfers the liability of one party to another party; The organization or individual is not liable for damages or injuries caused by the individual ...

[Show more]

Preview 2 out of 12  pages

  • September 16, 2024
  • 12
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • APM:
  • APM:
avatar-seller
APM Project Management Questions And
Answers 100% Guaranteed Success.

Hold Harmless Agreement - correct answer.A contractual agreement that transfers the
liability of one party to another party; The organization or individual is not liable for
damages or injuries caused by the individual

Lease Premises - correct answer.The property that resides on the lease

Easement Agreement - correct answer.An agreement that allows limited use of land
owned by someone else

Sidetrack Agreement - correct answer.Contract between a railroad and a business the
railroad may service.
The business holds the railroad harmless if an accident occurs while the railroad is
using the sidetrack to deliver goods to the business.

PERT - correct answer.Program Evaluation and Review Technique. A statistical tool
used in project management used to analyze and represent tasks in a given project

Roadway Pavement Management System - correct answer.The process of planning
the maintenance and repair of a network of roadways.
1. Inventory
2. Inspection
3. Condition Assessment
4. Condition Prediciton
5. Condition Analysis
6. Work planning

Protestant work ethic - correct answer.the view that a person's duty is to achieve
success through hard work and thrift, such success being a sign that one is saved.

management by exception - correct answer.a control principle that states that
managers should be informed of a situation only if data show a significant deviation
from standards

gap analysis - correct answer.Analyzing the current performance versus the
goal/potential performance

, ABC Analysis - correct answer.Rating inventory in ABC or based on importance.
Inventory of organization is not of equal value.

Value Engineering - correct answer.An approach to solve problems through identifying
and eliminating unwanted costs while improving functionality and quality. Value as a
ratio of function to cost. Creating a life-cycle for the product to minimize overspending.

Critical Path Method - correct answer.A method used to estimate the maximum project
duration and determine the amount of scheduling flexibility on the logical network paths
within the schedule model.

Productivity Ratio - correct answer.output/input

Downtime - correct answer.a period of time when a system is unavailable

Index Numbers - correct answer.Used to measure the changes in one or more variable
over a period of time

Management by Objectives (MBO) - correct answer.a program that encompasses
specific goals, participatively set, for an explicit time period, with feedback on goal
progress

Span of Control - correct answer.the number of subordinates who report directly to a
manager

Scientific Management - correct answer.the application of scientific principles to
increase efficiency in the workplace

Bottleneck - correct answer.A point in the production chain where the limited capacity in
one portion causes a reduced capacity of the whole chain.

Aggregates in Bituminous Pavements are tested on... - correct answer.Abrasion,
soundness, and deleterious material

PSI - correct answer.Present Serviceability Index

Minimum thickness for asphalt maintenance by U.S. Federal Highway Administration -
correct answer.3/4" minimum thickness

Raveling - correct answer.Disintegration of asphalt material from the surface downward
causing a separation of material

Management Science - correct answer.The careful, objective study of management
decisions and procedures in order to improve the operation of businesses and
organizations.

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller techgrades. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for £9.56. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

83662 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy revision notes and other study material for 14 years now

Start selling
£9.56
  • (0)
  Add to cart