100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
3rd class stationary steam engineer license prep EXAM Questions with Accurate Answers £9.89   Add to cart

Exam (elaborations)

3rd class stationary steam engineer license prep EXAM Questions with Accurate Answers

 1 view  0 purchase

3rd class stationary steam engineer license prep EXAM Questions with Accurate Answers

Preview 3 out of 16  pages

  • September 23, 2024
  • 16
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
All documents for this subject (2)
avatar-seller
Victorious23
3rd class stationary steam engineer license
prep EXAM Questions with Accurate Answers
_________ are necessary for complete combustion - - time, temperature,
mixture, and atomization

- if the steam pressure gauge indicates 200 PSIG, the absolute pressure
is______ - - 214.7

- a boiler is operating at 400 PSI, and the safety valve opens at 410 PSI and
closes at 398 PSI. The blowdown is______psi - - 12

- an oil cooler is commonly used with a(n) ________ when operating in
conjunction with a turbo-generator - - steam turbine

- a boiler is producing 40,000lb of steam/hr at a pressure of 100 PSI and a
steam temperature of 500 degrees Fahrenheit. The steam produced is
_______ steam - - superheated

- the economizer on a boiler is used to _______ - - add heat to the feed water

- blowers are normally used with________ boilers - - water tube

- overheating of tubes on a boiler can be caused by________ - - scale on
tubes

- carbon dioxide in a condensate return system causes_________ - -
channeling

- a ________ pump is a positive displacement pump - - reciprocating

- a boiler generating 6000 lb of steam/hr produces _______btu/hr - -
6,000,000

- a bottom blowdown is performed on a boiler to _____ - - discharge sludge
and sediment

- water columns are connected to the boiler with a minimum of _______" pipe
- -1

- the minimum size of a water column blowdown valve is_______". - - 3/4

- the maximum size bottom blowdown valve on a boiler is_________". - - 2
1/2

, - a ________ allows condensate to pass through, but stops Steam. - - a steam
trap

- when taking over a shift, the first thing to do is check the________ - - water
level in each boiler

- according to the asme code, a high-pressure boiler having more than 500
square feet of heating surface shall have________ - - two or more safety
valves

- the probable cause of an increase in temperature of gases of combustion
at the boiler Outlet is____ - - dirty heating services

- boilers in battery equipped with________ must have two main steam stop
valves and a free-flowing drain between them - - manhole openings

- in order to be sure the gauge glass is indicating an accurate water level
reading, the stationary engineer should______ - - blowdown the gauge glass

- a continuous blowdown line is located___ - - in the Steam and water drum
well below the nowl

- a temperature reading of 80 degrees Celsius is equal to_________°f - - 176

- a chimney temperature of 250 degrees Fahrenheit above steam
temperature indicates_______ - - poor efficiency

- a manometer is red in________ - - inches of water

- the boiling point of water will____ with an increase in pressure - - be raised

- if a lather is not obtained when performing a soap hardness test, the water
sample is_______ - - hard

- combustion efficiency can be increased when air is________ - - preheated

- ______ draft is produced by a fan located between the boiler and the
chimney - - induced

- the overspeed trip on a steam turbine should be tested ______ - - before
putting the steam turbine on-line

- a high CO2 reading in the gases of combustion is a sign of____ - - High
combustion efficiency

, - the purpose of chemically treating feedwater is to________ - - turn scale-
forming salts to a non adhering sludge

- water in a d rating feed water heater is prevented from entering the steam
line by a(n) _______. - - Loop seal or internal overflow

- a steam turbine operating at 3600 RPM will trip at_________ rpm - - 3960

- he steam line going to The Blowers is connected to the main ________ - -
steam drum

- before using blowers on a boiler,________ - - drain set blower lines

- an accumulation of snow on the Fireside of a boiler tubes________ - -
decreases boiler efficiency

- a globe valve installed in the feed water line between the feed water pump
and boiler has a pressure from the feed water pump_________ the valve disc -
- under

- the range of a pressure gauge should be twice the safety valve setting, but
not less than______ time (s) the safety valve setting - - 1 1/2

- hard scale formed on the inside of tubes is best removed by________ - - air-
or water-driven turbines

- to correct a low water condition,_____ - - secure fires

- desuperheater drain is used to_______ - - establish steam flow

- a sudden rise in chimney temperature with no increase in load
indicates______ - - there is a broken baffle

- the btu content of natural gas is_____ - - 100,000 btu/therm

- the safety valve setting on the Steam and water drum is ________ a
superheater safety valve - - higher than

- the btu content of number 6 fuel oil is approximately - - 18750 BTU / lb

- chemicals can be added to a boiler by a______pump - - proportioning

- the feed water stop valve is found between the____ - - boiler and check
valve

- sensible heat is______ - - heat that can be measured with a thermometer

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller Victorious23. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for £9.89. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

82265 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy revision notes and other study material for 14 years now

Start selling
£9.89
  • (0)
  Add to cart