If the operator is setting up the crane alone, which of the following is required? A. Overhead power lines must be at least 10ft over the boom B. Wind speed cannot exceed on the Beaufort C. The red cones designating the work zone must be set up D. Stabilizers shall be visible to the operator...

[Show more]

Preview 2 out of 15  pages

  • September 24, 2024
  • 15
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • Crane
  • Crane
avatar-seller
Crane practice test #3
QUESTIONS & SOLUTIONS!
If the operator is setting up the crane alone, which of the following is required?
A. Overhead power lines must be at least 10ft over the boom
B. Wind speed cannot exceed on the Beaufort
C. The red cones designating the work zone must be set up
D. Stabilizers shall be visible to the operator when extending and setting -
ANSWER D. Stabilizers shall be visible to the operator when extending and setting


Before the boom is un-stowed from the transport position which of the following
is most important
A. Wheel chock are set
B. Barricade tape is installed around the work zone
C. Stabilizers are properly extended and set
D. Engine oil level has been checked - ANSWER C


Prior to setting up the crane for a lift, what is one thing the operator should do?
A. Fill out the truck log
B. Perform a function of all the boom controls
C. Extend stabilizer on the lifting side of the Crane
D. Make sure the ground will support the weight of the crane and load - ANSWER
D

, What is the minimum clearance from energized power lines when traveling?
A. 1ft
B. 4ft
C. 6ft
D. 10ft - ANSWER B


Which of the following standards pertain to articulating boom cranes?
A. ASME B-30.5
B ASME B30.9
C ASME B30.22
D. ASME B30.23 - ANSWER C




Material that is slip resistant must be provided for
A. All operation and service locations
B. At each stand up platform control station
C. On the deck of the vehicle
D. Anti slip material is not required anywhere - ANSWER B


When operating the crane using remote control, you should never
A. Walk around the load
B. Follow hand signals from a designated signal person

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller Exampool. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for £12.16. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

79373 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy revision notes and other study material for 14 years now

Start selling
£12.16
  • (0)
  Add to cart