4.1 Describe the Joint Capabilities Integration and Development System - Answer- Ensures new capabilities are born joint - to reduce redundancy and standardize interoperability
4.2 Identify the purpose of the Capabilities Based Assessment...
FAM 104 Unit 1 Exam Questions
and Answers All Correct
4.1 Describe the Joint Capabilities Integration and Development System - Answer-
Ensures new capabilities are born joint - to reduce redundancy and standardize
interoperability
4.2 Identify the purpose of the Capabilities Based Assessment (CBA) Process - Answer-
Determine suitability of existing systems to fill a capability gap. If not, recommend/justify
development of a new material solution
4.3 Identify the importance of DOTMLPF-P analysis - Answer- Considered first before
going after a new system/material solution to fill a capability gap
Looks at changes to Doctrine, Organization, Training, Material, Leadership/Education,
Personnel, Facilities, or policies to fill the capability gap first. If not then material solution
is appropriate
4.4 Identify the purpose of the ICD, when it is developed and the three
milestone/decision points it supports - Answer- Purpose: Describes why non-material
solution alone (tactics/DOTLMPFP) will not suffice
Developed: After the CBA and prior to Material Development Decision (MDD)
Primary Milestone/Decision Point: MDD
4.5 Identify the purpose of the CDD, when it is developed and the three
milestone/decision points it supports - Answer- Purpose: Sponsor defined capabilities
required to deliver a militarily useful, affordable, and supportable capability
Developed: Drafted during Material Solution Analysis, published during TMRR for
Milestone B, updated for Milestone C
Primary Milestone/Decision Point: Milestone B (entry EMD), Milestone C (enter
production and development and FRP)
4.6 List common criteria for a good requirement - Answer- O'h MAN U ROCk
Orderly
Measurable
Attainable
Necessary
Unambiguous
Results-oriented
Organized
Correct
, 4.7 Identify the importance of KPPs - Answer- Top level Must have, or program
reevaluated, restructured, or terminated. Must be testable and verifiable. Limit number
of these
4.7 Identify the importance of threshold requirements - Answer- Minimum Value
achievable within in cost, schedule, and technology limitations
4.7 Identify the importance of objective requirements - Answer- Desired operational goal
if achievable within cost and schedule limits
4.8 List the mandatory requirements of KPPs and the Net-Ready performance Attribute
- Answer- 1. Force Protection KPP - keep people safe
2. Survivability KPP - withstand threatens
3. Sustainment KPP (material availability) - availability to sustain operations
4. Energy Efficient KPP - elongates combat capabilities durations
Net ready KPP - information System interoperability (joint in nature)
5.1 Define Work Breakdown Structure (WBS) - Answer- A key project deliverable
organizing the team's work into manageable sections
5.2 Explain how the WBS is the first step in developing a project plan - Answer- A
structured approach to identify work
A product into smaller parts
Or
A process into smaller steps
5.3 Differentiate between summary tasks and work packages - Answer- Summary Task:
does not contain any work itself but instead "summarizes" the work package beneath it
Work Package: anything in the WBS without something hanging off of it
5.4 Explain the considerations in determining how far to extend a WBS branch -
Answer- 1. 8/80 rule
2. standard reporting periods
3. is it useful? Is it easier to: estimate, assign, track
6.1 Identify the planning steps involved with developing a project schedule - Answer- 1.
Identify the work
2. Determine the task durations
3. Sequence work packages
4. Determine critical path and resource constraints
5. Adjust your schedule as needed
6.2 Critical path method - Answer- Uses predecessor tasks and durations to determine
start and stop times for each work package
Uses a single time estimate for work packages.
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through credit card for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying these notes from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller Scholarsstudyguide. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy these notes for £10.56. You're not tied to anything after your purchase.