Why is it important to collaborate with contractors on risk management (RM)? - Answer Most issues begin with the contractor, so it is essential for the government to prevent risks (NOT) Which of the following are typical sources of framing assumptions (FAs)? (Select all that apply.) - Answer ...

[Show more]

Preview 2 out of 10  pages

  • October 11, 2024
  • 10
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • PMT 0170 RISK MANAGEMENT
  • PMT 0170 RISK MANAGEMENT
avatar-seller
CLM 017 Final Exam Questions And All
Correct Answers.
Why is it important to collaborate with contractors on risk management (RM)? - Answer Most issues
begin with the contractor, so it is essential for the government to prevent risks (NOT)



Which of the following are typical sources of framing assumptions (FAs)? (Select all that apply.) - Answer
-Technological and engineering challenges

-Interdependencies with other programs

-Cost, schedule, and requirements tradeoffs



During which phase should you be building and maintaining robust stakeholder relationships and
ensuring horizontal and vertical communications? - Answer MSA, TMRR, EMD



What would be the appropriate corrective action for the following issue: One of the orders for materials
is going to run 75% over budget because the order will have to be shipped by air to meet schedule
requirements. The budgeting team may be able to find funds from other sources. - Answer Transfer



Which of the following is a responsibility of the Integrated Product Team (IPT) during the risk
management (RM) process? - Answer Coordinate RM efforts for risks affecting multiple IPTs.



What is the main differences between a risk and an opportunity? - Answer Risks have a negative
consequence, while opportunities requires creating additional tasks.



A Monte Carlo simulation reports a 75% chance that the prototyping tasks associated with a new
Doppler-based wind measuring technology will be delayed 17 business days due to supply shortages of
two key pieces of equipment. Based on the likelihood and consequence table, which of the following
represents the appropriate location on the risk matrix? - Answer L = 4; C = 2



During Technology Maturation and Risk Reduction (TMRR), the goal is to primarily reduce which types of
risk? (Select all that apply.) - Answer -Technology

-Integration

, -Engineering



Based on the results of a simulation, there is a 70% chance that the project will end two weeks behind
schedule. Using the table provided, what would the cumulative schedule risk be, based on a two-week
schedule delay? - Answer Probability 4; Schedule Impact 2



Which of the following is the difference between a risk and an issue? - Answer A risk is the potential of
occurring; and issue has occurred or is certain to occur.



Which of the following is a critical success factor to ensure effective risk management (RM)? - Answer -
Program Risk Process (PRP) Document



Who may write the Program Risk Process (PRP) Document? - Answer The program manager (PM) or a
dedicated risk manager



The following describes which type of category of risk: Certification for a new weapons system is
scheduled for January. The test is dependent on temperatures below freezing. If the temperature is too
warm, the system cannot be certified. - Answer Business



Your program is developing a piece of equipment that require a seismograph to identify and track low
ground vibrations within a specific range. You need to understand how well the design and
manufacturing process will be able to meet the performance goals. Which tool will provide that
information? - Answer Performance risk analysis (PRA)



Your program is planning on visiting a cooperating country to conduct an information-sharing event with
military counterparts. While the government is strategically allied with U.S. interests, popular opposition
to U.S. policies has been growing in strength and has turned to increasingly violent demonstrations on
the streets. Which risk mitigation technique should you choose for this security risk? - Answer
Avoidance



Within a program, which of the following entities is responsible for ensuring the risk management (RM)
process is executed according to the Program Risk Process (PRP) Document? - Answer Risk
Management Board (RMB)

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller TestSolver9. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for £8.12. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

75057 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy revision notes and other study material for 14 years now

Start selling
£8.12
  • (0)
  Add to cart