What is the minimum height for habitable rooms according to Michigan's Residential Code?
**ANS**: 7 feet
What is the maximum allowed riser height for stairs in a residential buildin...
Michigan Builders License Exam Study
Guide Question and Answers [100%
Correct] 2024/2025 Latest Release!!
What is the minimum height for habitable rooms according to Michigan's Residential Code?
**ANS**: 7 feet
What is the maximum allowed riser height for stairs in a residential building?
**ANS**: 8 1/4 inches
What is the required depth for footings in Michigan?
**ANS**: At least 42 inches below grade to account for frost.
What does the term "R-value" refer to in insulation?
**ANS**: The resistance to heat flow.
What must be done if there is asbestos found in a building before renovation or demolition?
**ANS**: Asbestos must be properly removed by a certified professional before starting any work.
What type of contract is used when the contractor agrees to complete a project for a specified price?
**ANS**: Lump Sum Contract.
When should an employer provide a Material Safety Data Sheet (MSDS)?
**ANS**: Whenever employees are working with hazardous materials.
What is the minimum slope required for a roof in Michigan for it to be considered a low-slope roof?
**ANS**: 2:12 (2 inches of rise for every 12 inches of run).
1
,What is the most common type of foundation used in Michigan residential construction?
**ANS**: Concrete foundation.
What is the maximum allowable spacing for studs in load-bearing walls according to Michigan code?
**ANS**: 16 inches on center.
What is the purpose of a vapor barrier in residential construction?
**ANS**: To prevent moisture from entering walls or floors.
When are GFCI (Ground Fault Circuit Interrupter) outlets required by code in Michigan homes?
**ANS**: In areas like kitchens, bathrooms, garages, and outdoors.
How long is a Michigan residential builder’s license valid before needing renewal?
**ANS**: 3 years.
What is the minimum width required for stairways in residential construction?
**ANS**: 36 inches.
What is the term for the legal responsibility of ensuring a safe working environment on a construction
site?
**ANS**: Duty of care.
What is the required fire separation between an attached garage and the house in a Michigan home?
**ANS**: 1/2 inch gypsum board (drywall).
When can a subcontractor file a construction lien?
**ANS**: When payment has not been received for work completed.
2
,What type of insurance covers injury to workers on the job site?
**ANS**: Workers’ Compensation Insurance.
What is the term used for the amount of water that roofing materials can shed?
**ANS**: Roof drainage.
Which document outlines the scope of work, payment schedule, and completion date for a project?
**ANS**: The contract.
What is the purpose of a footer drain in a foundation system?
**ANS**: To divert water away from the foundation.
What does the term "load-bearing wall" refer to?
**ANS**: A wall that supports the weight of the structure above it.
What is the minimum slope required for drainage away from the foundation of a house?
**ANS**: 6 inches within the first 10 feet.
What does OSHA stand for?
**ANS**: Occupational Safety and Health Administration.
What should be the fire rating for walls separating townhouses?
**ANS**: At least 1-hour fire-rated.
What is the maximum spacing allowed for rebar in a concrete footing?
**ANS**: 48 inches.
What is the maximum horizontal spacing for anchor bolts in foundation walls?
**ANS**: 6 feet.
3
, When must you install a handrail on stairs?
**ANS**: When there are four or more risers.
What is required when a contractor wishes to make changes to the agreed contract?
**ANS**: A written change order signed by both parties.
What is the minimum required clearance between the bottom of a wood beam and the ground in a
crawl space?
**ANS**: 18 inches.
How often must Michigan builders complete continuing education requirements?
**ANS**: Every license cycle (every 3 years).
When is a contractor legally allowed to cancel a signed contract with a homeowner?
**ANS**: If the homeowner fails to make agreed payments or violates the terms of the contract.
What is required for a builder to pull a permit for a construction project?
**ANS**: They must be a licensed contractor.
What is the function of a ledger board in a deck structure?
**ANS**: To attach the deck to the house and support the deck joists.
What happens if a builder works without a license in Michigan?
**ANS**: They can face fines, legal action, or penalties.
Created to serve as a complete, comprehensive code regulating the construction of single-family, two-
family and buildings consisting of three or more townhouse units. **Ans**IRC (International Residential
Code)
4
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through credit card for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying these notes from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller StellarGrades. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy these notes for £7.96. You're not tied to anything after your purchase.