Designated
Representative OSSF
exam with complete
solutions
TCEQ - answer Adopted the current OSSF Rules in 1997 & revised them
several times
Designated Representative - answer Is responsible for reviewing permit
applications, site evaluations, planning materials and conducting
inspections of OSSF's.
Installer - answer Individual who holds a valid license from the TCEQ &
who is compensated by another individual to construct install alter or
repair an OSSF
Site Evaluator - answer Individual who visits a site and conducts soil
evaluations and a site survey
Installer II & Maintenance Provider - answer OSSF licenses that require
previous experience
Designated Representative - answer These Individuals working in any
capacity for an OSSF authorized agent cannot work as an installer,
Designer for a fee, or private Site Evaluator within jurisdiction of the
permitting authority
Pre-qualifications for an exam - answer Submit application, pay class and
application fees, complete appropriate training course
, 3 year term - answer New OSSF licenses are issued for
24 hours - answer How many hours of the TCEQ approved continuing
education course must an individual complete in order to renew the
license
9 steps of permitting process - answer Site & soil evaluation conducted
by Site Evaluator, select OSSF, system planned by qualified individual,
prepare and submit permit application, application and planning materials
reviewed by permitting authority, receive permit to construct,
construction, system inspected at appropriate stages, notice of approval &
permit to operate issued by permitting authority
Criminal Penalties/Injunction or civil suit/Administrative Penalties - answer
Penalties for violating the laws, rules or regulations covering OSSF
PE (Professional Engineer) or RS (Registered Sanitarian) - answer
Planning materials for an OSSF utilizing secondary treatment can be
prepared by
Installer II - answer Who can legally install a septic tank followed by a
low pressure dosing drain field at a rental house
Equipment & procedures to protect work site - answer Cones barricades
high level flags, pre-warn, sign properly, regulate speed, guide properly
5 feet deep - answer OSHA requires that all excavations over how many
feet deep be sloped shored or otherwise supported before a person enters
Infectious waterborne diseases - answer A particular hazard that OSSF
installers face that most construction workers do not experience
Feet - answer Inches divided by 12
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through credit card for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying these notes from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller BRAINBOOSTERS. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy these notes for £12.58. You're not tied to anything after your purchase.