100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
CPESC Section 1 & 2 Questions and Correct Answers Latest Update. £9.78   Add to cart

Exam (elaborations)

CPESC Section 1 & 2 Questions and Correct Answers Latest Update.

 3 views  0 purchase
  • Module
  • CPESC
  • Institution
  • CPESC

CPESC Section 1 & 2 Questions and Correct Answers Latest Update.CPESC Section 1 & 2 Questions and Correct Answers Latest Update.CPESC Section 1 & 2 Questions and Correct Answers Latest Update.CPESC Section 1 & 2 Questions and Correct Answers Latest Update.CPESC Section 1 & 2 Questions and Correct A...

[Show more]

Preview 2 out of 5  pages

  • October 26, 2024
  • 5
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • CPESC
  • CPESC
avatar-seller
CPESC Section 1 & 2 Questions and Correct
Answers Latest Update

What does the acronym NPDES stand for? - (correct answer) -National Pollutant Discharge Elimination System
iu iu iu iu iu iu iu iu iu iu iu iu iu iu




True / False: The NPDES requirements apply only to discharges of storm-water either directly or through a municipal
iu iu iu iu iu iu iu iu iu iu iu iu iu iu iu iu iu



separate storm drain system, to waters of the US. - (correct answer) -2.1.1.6
iu iu iu iu iu iu iu iu iu iu iu iu iu iu



True

What does the acronym TMDL stand for? Define it? - (correct answer) -2.1.1.10
iu iu iu iu iu iu iu iu iu iu iu iu iu



Total Maximum Daily Load. The amount of a particular pollutant that a water body can assimilate on a daily basis without
iu iu iu iu iu iu iu iu iu iu iu iu iu iu iu iu iu iu iu iu



violating applicable water quality standards.
iu iu iu iu iu




Define TMDL - (correct answer) -2.1.1.10
iu iu iu iu iu iu



The TMDL defines the amount of a particular pollutant that a water body can assimilate on a daily basis without violating
iu iu iu iu iu iu iu iu iu iu iu iu iu iu iu iu iu iu iu iu



applicable water quality standards. (Water quality standards usually predetermined by the state.)
iu iu iu iu iu iu iu iu iu iu iu iu




What are the two types of storm-water permits issued under the NPDES Program? - (correct answer) -2.2.1
iu iu iu iu iu iu iu iu iu iu iu iu iu iu iu iu



1. The Construction General Permit (CGP).
iu iu iu iu iu



2. The individual permit designed to fit the specific requirements of a particular applicant, facility, or activity.
iu iu iu iu iu iu iu iu iu iu iu iu iu iu iu iu




If deficiencies are found during a SWPPP inspection, how quickly do they need to be corrected? - (correct answer) -No
iu iu iu iu iu iu iu iu iu iu iu iu iu iu iu iu iu iu iu



later than seven days after the inspection.
iu iu iu iu iu iu iu




List three types of pollutants. - (correct answer) -2.1
iu iu iu iu iu iu iu iu



Nutrients,pathogens, heavy metals, toxics, sediment, salts, detergents, hydro-carbons,oxygen absorbing substances. iu iu iu iu iu iu iu iu iu




List three examples of 'Waters of the United States'. - (correct answer) -2.1.1.6
iu iu iu iu iu iu iu iu iu iu iu iu



Lakes,rivers, streams, mudflats, sand flats, wetlands, sloughs, prairie potholes, wet meadows, playa lakes, natural ponds.
iu iu iu iu iu iu iu iu iu iu iu iu iu iu




When does the SWPPP need to be completed? - (correct answer) -2.3.6.4
iu iu iu iu iu iu iu iu iu iu iu



Prior to submitting the NOI.
iu iu iu iu




When does the EPA's construction permit require inspections? - (correct answer) -Every 7 days, or within 24 hrs of a
iu iu iu iu iu iu iu iu iu iu iu iu iu iu iu iu iu iu iu



storm of 0.5 inches or move in depth.
iu iu iu iu iu iu iu iu




What does CPESC stand for? - (correct answer) -Certified Professional in Erosion & Sediment Control
iu iu iu iu iu iu iu iu iu iu iu iu iu iu




What are the two types of Storm Water Permits? - (correct answer) -2.2.1
iu iu iu iu iu iu iu iu iu iu iu iu iu




1. General: provides umbrella coverage to a large number of applicants.
iu iu iu iu iu iu iu iu iu iu




iu 2. Individual: designed to fit the specific requirements of a particular applicant, facility, or activity.
iu iu iu iu iu iu iu iu iu iu iu iu iu iu




True/False: A site initially disturbing 1/2 acre, that is part of a 3.5 acre future development is not required to obtain a
iu iu iu iu iu iu iu iu iu iu iu iu iu iu iu iu iu iu iu iu iu



permit for the 1/2 acre. - (correct answer) -2.1.1.8
iu iu iu iu iu iu iu iu iu



False, If it as part of a larger plan of development >1 acre, a permit is required.
iu iu iu iu iu iu iu iu iu iu iu iu iu iu iu iu




Name 3 of the 5 types of Phase I facilities under section 402 of the CWA as of 1987. - (correct answer) -2.1.1.2
iu iu iu iu iu iu iu iu iu iu iu iu iu iu iu iu iu iu iu iu iu iu



-Facilities already covered by a permit iu iu iu iu iu



-Facilities that engage in industrial activity iu iu iu iu iu



-Large (>250K pop) MS4s iu iu iu



-Medium (100K250K) MS4s iu iu



-Facilities that EPA admin deems "significant contributors" of pollutants to WOTUS
iu iu iu iu iu iu iu iu iu iu

, Who is responsible for applying for the Storm water permit for a construction site? - (correct answer) -2.3.1
iu iu iu iu iu iu iu iu iu iu iu iu iu iu iu iu iu



The operator of the site, however a owner can apply if the operator has not been identified.
iu iu iu iu iu iu iu iu iu iu iu iu iu iu iu iu




What is an NOI? - (correct answer) -2.2.4
iu iu iu iu iu iu iu



"Notice of Intent" to be covered by a general permit in the state in which the facility is located.
iu iu iu iu iu iu iu iu iu iu iu iu iu iu iu iu iu iu




List the 6 major phases of a SWPPP for construction activities? - (correct answer) -2.3.6
iu iu iu iu iu iu iu iu iu iu iu iu iu iu



-Site Evaluation/design development (site plan)
iu iu iu iu



-Assessment (site area/runoff calc) iu iu iu



-Control selection and plan design (BMPs) iu iu iu iu iu



-Certification/notification (NOI) iu



-Construction/implementation (install/maintenance) iu



-Final stabilization/termination (NOT)
iu iu




What score do you need to pass each section of the test? - (correct answer) -70%
iu iu iu iu iu iu iu iu iu iu iu iu iu iu iu




What is the deadline to stabilize a site that wont be redisturbed? - (correct answer) -2.3.6.3
iu iu iu iu iu iu iu iu iu iu iu iu iu iu iu iu



14 days iu




What is the deadline to correct problems found during an inspection? - (correct answer) -2.3.6.5
iu iu iu iu iu iu iu iu iu iu iu iu iu iu iu



As soon as possible but no later than 7 days.
iu iu iu iu iu iu iu iu iu




How long do you have to keep copies of the swppp after final stabilization? - (correct answer) -2.3.6.5 (second to last
iu iu iu iu iu iu iu iu iu iu iu iu iu iu iu iu iu iu iu iu



paragraph)
iu iu



3 years
iu




What are the 3 types of enforcement actions EPA has? - (correct answer) -2.3.7
iu iu iu iu iu iu iu iu iu iu iu iu iu



-Administrative Orders iu



-Civil Actions iu



-Criminal Prosecutions iu




The Federal Water Pollution Control Act was established which year? - (correct answer) -1948
iu iu iu iu iu iu iu iu iu iu iu iu iu




When was the Federal Water Pollution Control Act amended? What is it called now? - (correct answer) -2.1.1
iu iu iu iu iu iu iu iu iu iu iu iu iu iu iu iu iu



1972 and 1977. Now called the Clean Water Act
iu iu iu iu iu iu iu iu




Which year was the National Pollutant Discharge Elimination System established? - (correct answer) -2.1.1.2
iu iu iu iu iu iu iu iu iu iu iu iu iu



1972

What is an MS4? - (correct answer) -Municipal Separate Storm Sewer System
iu iu iu iu iu iu iu iu iu iu iu




Stormwater is defined under EPA's NPDES rules as . . . - (correct answer) -2.1.1.5
iu iu iu iu iu iu iu iu iu iu iu iu iu iu



Stormwater runoff, snow melt runoff, and surface runoff and drainage. iu iu iu iu iu iu iu iu iu




Who is allowed to certify the SWPPP? - (correct answer) -The authorized representative of the site operator, such as the
iu iu iu iu iu iu iu iu iu iu iu iu iu iu iu iu iu iu iu



president, vice president, or a general partner who has been delegated authority to sign and certify this type of document.
iu iu iu iu iu iu iu iu iu iu iu iu iu iu iu iu iu iu iu iu




Whatare the Fundamentals of the Code of Ethics and Professional Conduct ? - (correct answer) -* Integrity
iu iu iu iu iu iu iu iu iu iu iu iu iu iu iu iu



* Objectivity
iu



* Confidentiality
iu



* Competence
iu



* Professionalism
iu




Who oversees Stormwater Regulations ? - (correct answer) -EPA (US Environmental Protection Agency)
iu iu iu iu iu iu iu iu iu iu iu iu




When was the Stormwater Application Rule issued? - (correct answer) -November 16th, 1990
iu iu iu iu iu iu iu iu iu iu iu iu




When was the Stormwater Implementation Rule enacted and what did it entail? - (correct answer) -April 1992; minimum
iu iu iu iu iu iu iu iu iu iu iu iu iu iu iu iu iu



requirements for storm water permit terms and conditions
iu iu iu iu iu iu iu iu




What does the Phase II discharger's include and when were they established? - (correct answer) -Phase II stormwater
iu iu iu iu iu iu iu iu iu iu iu iu iu iu iu iu iu



dischargers generally include "light" industrial facilities, small construction sites (< 5 acres), and small municipalities
iu iu iu iu iu iu iu iu iu iu iu iu iu iu iu

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller Wisdoms. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for £9.78. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

75632 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy revision notes and other study material for 14 years now

Start selling
£9.78
  • (0)
  Add to cart