Construction FE Civil Exam Questions with 100% Verified Correct Answers Is the most traditional project delivery method and appeals to those looking for low-cost bids. In this method, the owner contracts designers and builders separately. - Correct Answer Design-bid-build is a construction proj...

[Show more]

Preview 3 out of 18  pages

  • November 11, 2024
  • 18
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • Construction FE Civil
  • Construction FE Civil
avatar-seller
Construction FE Civil Exam Questions with 100%
Verified Correct Answers
Is the most traditional project delivery method and appeals to those looking for low-cost bids. In this
method, the owner contracts designers and builders separately. - Correct Answer Design-bid-build



is a construction project delivery method where the designer and builder work together under a
single contract from the beginning of the project in order to ensure unity and collaboration
throughout the process. - Correct Answer Design- build



Select all that clearly demonstrate an advantage of the Design-Build project delivery over the Design-
Bid-Build approach:



- There is single point of contractual responsibility for the owner for the entire project

-There are contractual relationships with the Owner that prevent a conflict of interest

-The design is clearly and explicitly defined at the outset of the project

- The design includes significant collaboration between the Engineer and the Contractor

-The schedule can be fast-tracked and construction can begin before the complete project design is
finalized

- The Owner will receive a project at the lowest competitive cost - Correct Answer There is single
point of contractual responsibility for the owner for the entire project



There is single point of contractual responsibility for the owner for the entire project



The schedule can be fast-tracked and construction can begin before the complete project design is
finalized



An indemnification clause in an engineer's design contract is typically tied to:



A. Negligent engineering design

B. Claims submitted by parties affected by a failure

C. Project cost overruns

D. Improper construction methods by the Contractor - Correct Answer A. Negligent engineering
design

,Collusion on a construction project typically refers to which of the following?



A. A practice where multiple contractors conspire to fix prices or rig bids

B. A system where public officials receive money from the contractor after award

C. Falsely increasing the price of change order

D. Misrepresenting the amount of work that has been completed to get advance payments - Correct
Answer A. A practice where multiple contractors conspire to fix prices or rig bids



A preconstruction conference should be he held:



A. Prior to advertising for bids

B. After advertising for bids but before bids are received

C. After bid opening but before award of the contract

D. After execution of an agreement but before Notice to Proceed - Correct Answer D. After execution
of an agreement but before Notice to Proceed



Types of submittals for engineer approval typically include all the following except:

A. Product data

B. Shop drawings

C. Installation means and methods

D. Mill certificates - Correct Answer C. Installation means and methods



Which of the following statements best define what is meant by "substantial completion" with
respect to a construction contract?



A. Project can be used and occupied by the owner and is completely finished B. Project can be used
and occupied by the owner but there is still a punch-list of minor work remaining

C. Contractor's performance bond will be used to finish the remaining work

D. The owner has received a final release of liens from all subcontractors - Correct Answer B. Project
can be used and occupied by the owner but there is still a punch-list of minor work remaining

, a financial guarantee that the terms of a contract will be honored. If one party to a contract cannot
complete their obligations, the bond is paid out to the other party to compensate for their damages
or costs. - Correct Answer Performance bond



OSHA requires trench protection systems be installed for the safety of workers:

A. Whenever a trench is dug and workers will be working in the trench

B. For trenches 5 feet deep or greater unless the trench is made entirely in stable rock

C. When the work in the trench will exceed four hours

D. Only if the trench is 8 feet deep or greater or 20 feet long or greater - Correct Answer B. For
trenches 5 feet deep or greater unless the trench is made entirely in stable rock



The basic responsibility for planning the means and methods of construction is that of the:



A. Owner

B. Inspector

C. Engineer

D. Contractor - Correct Answer D. Contractor



Best management practices for temporary erosion and sediment control include which of the
following? Select all that apply:



A. silt fence

B. check dams

C. vortex valves

D. mulching

E. concrete washout stations

F. stormwater wetlands - Correct Answer A. silt fence

B. check dams

D. mulching

E. concrete washout stations



What does these nomenclature stand for:

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller Winfred. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for £9.00. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

67096 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy revision notes and other study material for 14 years now

Start selling
£9.00
  • (0)
  Add to cart