DevOps 5.1 Questions and Answers 2022 with guaranteed pass
2 views 0 purchase
Module
SAFe DevOps
Institution
SAFe DevOps
DevOps 5.1 Questions and Answers 2022 with guaranteed pass
The Agile Release Train passes through four steps in order to deliver Solutions which includes: defining new functionality, implementing, acceptance testing, and what else?
1 Completing phase-gate steps
2 Deploying
3 Regulatory com...
DevOps 5.1 Questions and Answers 2022
with guaranteed pass
The Agile Release Train passes through four steps in order to deliver Solutions which includes:
defining new functionality, implementing, acceptance testing, and what else?
1 Completing phase-gate steps
2 Deploying
3 Regulatory compliance
4 DevOps testing - ANS ☑ *Deploying*
If small batches go through the system faster with lower variability, then which two statements
are true about batch size? (Choose two.)
1 Good infrastructure enables large batches
2 Proximity (co-location) enables small batch size
3 Batch sizes cannot influence our behavior
4 Severe project slippage is the most likely result of large batches
5 Low utilization increases variability - ANS ☑ *Proximity (co-location) enables small batch
size*.
☑ *Severe project slippage is the most likely result of large batches*.
Which statement is true about batch size?
1 Large batch sizes limit the ability to preserve options
2 When stories are broken into tasks it means there are small batch sizes
3 Large batch sizes ensure time for built-in quality
4 When there is flow it means there are small batch sizes - ANS ☑ *Large batch sizes limit the
ability to preserve options*
, Weighted Shortest Job First gives preference to jobs with which two characteristics? (Choose
two.)
1 Higher Cost of Delay
2 Lower Cost of Delay
3 Fixed date
4 Shorter duration
5 Revenue impact - ANS ☑ *Higher Cost of Delay*.
☑ *Shorter duration*.
Implementing SAFe requires buy-in from all levels of the organization. What level of leadership
is most important for effecting cultural change?
1 Release Train Engineers
2 Solution Management
3 Product Owners
4 Executive Management - ANS ☑ *Executive Management*.
Which two statements describe a Capability? (Choose two.)
☒ It is maintained in the Portfolio Backlog
☑ It must be structured to fit within a single PI
☑ It is written using a phrase, benefit hypothesis, and acceptance criteria
☒ It remains complete and becomes a Feature for implementation
☒ It is developed and approved without a dependence on the Solution Kanban - ANS 1 ☑ *It
must be structured to fit within a single PI*.
2 ☑ *It is written using a phrase, benefit hypothesis, and acceptance criteria*.
Lifelong learning is a requirement for Lean-Agile Leaders, and it helps them do what?
1 Provide the personnel, resources, direction, and support to the Enterprise
2 Act as an effective enabler for teams
,3 Demonstrate the values they want the teams to embody
4 Commit to quality and productivity - ANS ☑ *Demonstrate the values they want the teams to
embody*.
What does the Program Roadmap do in the Scaled Agile Framework?
1 It provides visibility into the Portfolio Epics being implemented in the next year.
2 It describes technical dependencies between Features.
3 It communicates the delivery of Features over a near term timeline.
4 It describes the program commitment for the current and next two Program Increments. - ANS
☑ *It describes the program commitment for the current and next two Program Increments*.
*Which statement describes the connection between Features and Capabilities in a large
Solution*?
1 Some Features may not have parent Capabilities.
2 There cannot be more than 5 Features for each.
3 Some Capabilities may not have child Features.
4 Every Feature has a parent Capability. - ANS ☑ *Every Feature has a parent Capability*.
*When is a Pre-PI Planning event needed*?
1 When there is only one day to run PI Planning, so more time is needed to prepare to run it
effectively.
2 When Product Owners and Scrum Masters need to coordinate dependencies within the Agile
Release Train.
3 When multiple Agile Release Trains working on the same Solution need to align and
coordinate.
4 When teams cannot identify and estimate Stories in PI Planning and need more time to prepare.
- ANS ☑ *When multiple Agile Release Trains working on the same Solution need to align and
coordinate*.
During PI Planning, which two tasks are part of the Scrum Master's role in the first team
breakout? (Choose two.)
, 1 Review and Reprioritize the team backlog as part of the preparatory work for the second team
breakout.
2 Facilitate the coordination with other teams for dependencies.
3 Provide clarifications necessary to assist the team with their story estimating and sequencing.
4 Identify as many risks and dependencies as possible for the management review.
5 Be involved in the program backlog refinement and preparation. - ANS 1 ☑ *Facilitate the
coordination with other teams for dependencies*.
2 ☑ *Identify as many risks and dependencies as possible for the management review*.
During the PI Planning event, when are planning adjustments agreed upon?
1 During the draft plan review
2 During breakout sessions
3 During the management review and problem-solving
4 During Scrum of scrums - ANS ☑ *During the management review and problem-solving*.
Why is a confidence vote held at the end of PI Planning?
1 To remove the risks for the PI
2 To build share commitment to the Program plan
3 To ensure that Business Owners accept the plan
4 To hold the team accountable if the Agile Release Train does not deliver on its commitment -
ANS ☑ *To build share commitment to the Program plan*
Which statement correctly describes one aspect of the team's commitment at the end of PI
Planning?
1 A team commits only to the PI Objectives with the highest business value.
2 A team does not commit to uncommitted objectives.
3 A team commits to all the Features they put on the program board.
4 A team commits to all the Stories they put on their PI plan. - ANS ☑ *A team does not commit
to uncommitted objectives*
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through credit card for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying these notes from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller denmukundi. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy these notes for £14.21. You're not tied to anything after your purchase.