Midterm Exam- Offshore Fire And Safety
Inspection Questions And Answers 2025
- a well on which operations are temporarily suspended because of various
reasons but may be used at a later stage. - Suspended wells
- drilled specifically for finding new oil reservoirs - Exploration wells
- specifically drilled for production of petroleum products. - Production wells
,Terms in this set (100) Q&A
- used to 'appraise' the characteristics of the contents of a reservoir. -
Appraisal wells
- wells that have been plugged and therefore abandoned due to technical
reasons. - Abandoned wells
: • Task selection • Hazard identification • Likelihood of occurrence of harm
or severity of harm • Establishing if precautions are sufficient • Check if a
PTW is required to avoid conflict with other tasks • Obtain approval from
area controller • Review with work team and have a toolbox talk • When
work occurs a dynamic risk assessment will continue - A risk assessment
can be carried out by
: A fire sprinkler system is an active fire sprinkler systemprotection method,
consisting of a water supply system, providing adequate pressure and
flowrate to a water distribution piping system, onto which fire sprinklers are
connected. - Water sprinkler system
: a fire-protection device that automatically detects and gives a warning of
the presence of smoke. - Smoke detector:
: a portable device that discharges a jet of water, foam, gas, or other
material to extinguish a fire. - Fire extinguisher
: a room or building set aside for the treatment or accommodation of the
sick, especially within a military base or on board a ship
, Terms in this set (100) Q&A
The _____ ___ facilities, medical supplies and equipment should be
suitable to accommodate the number of personnel normally present on the
installation. - Sick bay
: any unsafe act or condition, material, object or activity, circumstance or
situation that has a potential for damaging property, life or health of an
employee or environment - Hazard
: information about the task should be contained in permit (nature of work,
duration and contingency measures)
: signatures from persons carrying out task, authorizing person (such as
safety officer) and the offshore installation manager
: PTW should continuously be reviewed
: a copy should be kept and filed properly
each permit should be specific to the task - • Task:
• Authorization:
• Review and Management:
• Record Keeping:
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through credit card for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying these notes from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller Schoolflix. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy these notes for £12.96. You're not tied to anything after your purchase.