100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
Summary Critical Path Analysis £3.49
Add to cart

Summary

Summary Critical Path Analysis

 43 views  0 purchase

Describes what a critical path analysis is, what a manager needs to know to use the technique, features of a critical path, key points of a critical path, and the advantages and disadvantages of it.

Preview 1 out of 2  pages

  • September 28, 2020
  • 2
  • 2019/2020
  • Summary
All documents for this subject (38)
avatar-seller
emily1744
Theme 3 Topic 9
Critical Path Analysis
Critical Path Analysis
Critical Path Analysis – using a network diagram to show
the tasks taken to complete a project in the minimum time
possible

 Shows the sequence of activities required for the
project and the order in which they can be
completed
 Its purpose is to plan projects in a way which
enables a project to be completed in the shortest
time possible

To Use the Technique a Manager Needs to Know:

 What different tasks are involved
 The length of time each task is expected to take
 The order the tasks must be completed in – some can’t be started until another has finished

Features of a Critical Path Analysis:

Feature Explanation
Nodes and Node  The circles represent a point in time at the start or end of an activity
Numbers  Nodes are split into three
 The left half of the node contains the number of the node – provides a unique
identity for each node
Earliest Start  The right half of the node is split in two
Time (EST)  The top segment shows the EST that an activity can commence
 Depends on the completion of the previous activity
 For the starting activity, the EST is always zero
Latest Finishing  The bottom segment shows the LFT
Time (LFT)  The latest time an activity can finish without delaying the overall project
Arrows  Represent production activities, they must go left to right and begin and end
with a node
 Below the line – a number which represents the length of time it takes to
complete that activity
 Above the line – a letter or description of the activity that the line represents
The Critical Path  Critical Path – the sequence of activities in a project that must be completed
within a designated time in order to prevent any delay in overall completion of
the project
 Is shown by the symbol // over the arrow
Total Float  Total Float – the amount of time that an activity can be delayed by without
delaying the entire project
 Total Float for an Activity = LFT – Duration of Activity – EST

Key Points of a Critical Path Analysis:

 Must start and end on a single node
 No lines should cross each other
 There is no limit on the number of activities that link to a single node
 When drawing an activity, do not add the end node until you have looked to see which activity follows
 It is helpful to draw networks with large circles and short lines – able to write figures in the nodes

Advantages of Critical Path Analysis Disadvantages of Critical Path Analysis

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller emily1744. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for £3.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

51292 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy revision notes and other study material for 15 years now

Start selling
£3.49
  • (0)
Add to cart
Added