Knowledge Hub
On this page, you find all documents, package deals, and flashcards offered by seller mwapemwansa2019.
- 8
- 0
- 0
Community
- Followers
- Following
8 items
Final Assignment in Cost Studies M2CPM9
Construction of 30 New Two-Storey Detached Houses - Housing Development Project in NG8 Area of Nottingham
- Other
- • 22 pages •
Construction of 30 New Two-Storey Detached Houses - Housing Development Project in NG8 Area of Nottingham
Assignment 2
A Relationship with the Lean Approaches used in a Construction Project Delivery based on the Building Cars Documentary.
- Other
- • 16 pages •
A Relationship with the Lean Approaches used in a Construction Project Delivery based on the Building Cars Documentary.
Assignment 2
The Relationship between the Last Planner System, Lean Production and Lean Philosophy
- Other
- • 12 pages •
The Relationship between the Last Planner System, Lean Production and Lean Philosophy
Assignment 3
A Critical Review of the Practical Aspects of Health and Safety Management in the Construction Industry
- Other
- • 18 pages •
A Critical Review of the Practical Aspects of Health and Safety Management in the Construction Industry
Assignment 3 - Client Report
A Project Manager's Report to the Client on Ways to Promote Collaborative Working on a Virtual Project Team
- Other
- • 10 pages •
A Project Manager's Report to the Client on Ways to Promote Collaborative Working on a Virtual Project Team
Assignment 2 - Occupier's Liability Act 1957 and 1984 - Internal Memo
An Internal Memo from the Project Manager to Management on the Occupier's Liability Act 1957 and 1984
- Other
- • 8 pages •
An Internal Memo from the Project Manager to Management on the Occupier's Liability Act 1957 and 1984
Retention - Letter of Advice
Letter of Advice
- Other
- • 4 pages •
Assignment 2
Collateral Warranties and Third Party Rights Act
- Other
- • 14 pages •
Collateral Warranties and Third Party Rights Act