3M 304|82 Questions with 100% Correct Answers | Verified | Updated 2024
FBRs must be screened & forwarded by 3MC within how many days of origination in SKED? - ️️7 days What is used to confirm the # of spot checks? - ️️Spot Check Matrix What are the two types of FBRs? - ️️1. Category A (Non-Technical) 2. Category B (Technical) What are the two types of Category B Technical FBRs? - ️️1. Routine 2. Urgent Which type of FBR is used to change Workcenter LOEP? - ️️Category A Non-Technical Once the 3MC signs off on an FBR, what is attached to the FBR before sending the FBR off ship? - ️️Serial # What does the lack of a serial # on an FBR indicate? - ️️The 3MC has not signed off on the FBR What type of FBR is submitted that involves safety of personnel, the ship, or potential damage to equipment? - ️️Category B - Urgent Once generated in SKED, Urgent FBRs are forwarded via what method? - ️️Naval Message What program is used to report maintenance actions and configuration changes? - ️️OMMS - NG
Geschreven voor
- Instelling
- 3M 304
- Vak
- 3M 304
Documentinformatie
- Geüpload op
- 12 maart 2024
- Aantal pagina's
- 8
- Geschreven in
- 2023/2024
- Type
- Tentamen (uitwerkingen)
- Bevat
- Vragen en antwoorden
Onderwerpen
-
3m 304