CGSC X100 Exam with complete solutions
Differentiate the roles of HQDA G-3/5/7 and HQDA G-1 in manning an organization. - ANSWER HQDA G-3/5/7 identifies how many spaces (authorizations) an organization has; HQDA G-1 provides the faces (personnel) to fill the spaces FORSCOM (the Army's force provider) follows ________, the model used to generate readiness to meet global demand while providing time for organizations to modernize. - ANSWER Regionally Alligood Readiness and Modernization Model (ReARMM) ________ readiness prioritize the readiness of specific units to keep them at high levels of readiness; __________ readiness rotates which units are prioritized to build readiness at the time of need (employment) - ANSWER Tiered; cyclic What is an example of the Army considering Force Integration early in the development of a new capability? - ANSWER Force Integration Functional Area (FIFA) analysis before approving a Force Design Update How do Force Integration Functional Area Analyses differ from DOTMLPF-P? - ANSWER FIFA assess friction points in integrating organizational change. DOTMLPF-P identifies option as to solve capability gaps. Replacing HMMWVs with JLTVs on TOEs requires ___________ to update the TOE. - ANSWER A Basis of Issue Plan (BOIP) What process does the Army use to develop organizational designs? - ANSWER Force Development What is The Force Design Update (FDU) - ANSWER Is the process through which the Army develop and approves new (or modified) organizational designs. What does a civilian provide to the Capabilities Development and Integration Directorate (CDID) - ANSWER Institutional knowledge of past decisions and familiarity with force management process related to the Center of Excellence What does a Basic Branch Officer provide to the Capabilities Develop and Integration Directorate (CDID) - ANSWER Recent operational experience in the warfighting function under consideration What does the force management officer provide to the Capabilities Develop and Integration Directorate (CDID) - ANSWER Recent operational experience in a range of force management processes across the Army The Army Budget Office (ABO) monitors expenditures during _________. - ANSWER Execution Identifying DOTMLPF-P solutions is part of ________. - ANSWER Planning The Program Objective Memorandum (POM) is built during_________. - ANSWER programming If a program is unable to spend appropriated funds, the Army can shift the funds to another program through ________, but only if it is less than the allowable threshold. - ANSWER Reprogramming What needs to occur for the Department of Defense to be able to fund operations at the beginning of FY22? - ANSWER Congress passes and the President signs both the Defense Appropriations Bill and the Defense Authorization Bill for FY22 JCDIDs uses __________ to identify capabilities needs, gaps, and solution analysis. - ANSWER Capabilities-Based Assessments (CBAs) What is a Needs Analysis? - ANSWER Assess and determines required capabilities based on strategy, concepts, and similar guidance What is a Gap analysis? - ANSWER Compares required capabilities to capabilities and capacity present in the joint force to determine unmet capability requirements What is a Solutions Analysis? - ANSWER Proposes multiple solution approaches across the domains of DOTMLPF-P. What is a Capabilities Based Assessment? - ANSWER The analytical process of JCIDs that identifies requirements, which requirements are not met, and proposes DOTMLPF-P approaches to the solve them. The __________ manages the Joint Requirements Oversight Council (JROC) and the ____________ manages the Army Requirements Oversight Council (AROC). - ANSWER Joint Staff J-8; HQDA G-8 Within JCIDs, what construct do capability develops use to identify a wide range of possible solutions? - ANSWER DOTMLPF-P What organization is responsible for guiding Army modernization and capability development? - ANSWER Army Futures Command Across DOTMLPF-P, the services consider material solutions last because ______________. - ANSWER They are generally the most expensive and take the longest to develop The Army processes urgent acquisition requirements through Operational Needs Statements (ONSs). The Joint community uses__________. - ANSWER Joint Urgent Operational Needs (JUONs) and Joint Emergent Operational Needs (JEONs) What represents a "Must-Do", or minimum requirements a capability? - ANSWER The Key Performance Parameter (KPP) Acquisition programs are managed by ____________. - ANSWER Program Executive Offices, Program Managers, Product Managers, and Project Managers To streamline modernization, Army Futures Command has established _________, bringing all stakeholders into the conversations. - ANSWER Cross-Functional Teams (CFTs) Force Management ________________ - ANSWER Develops and fields capabilities that combatant commanders require to meet the demands of the contemporary operating environment. By law, Headquarters, Department of the Army (HQDA) is limited in size. What organization does it use to accomplish the Title To missions? - ANSWER Army Commands (ACOMs), Army Service Component Commands (ASCCs), Direct Reporting Units (DRUs), and Field Operation Agencies (FOAs) Provide an example of Congress exercising its authority to organize the military. - ANSWER Goldwater- Nichols Act established the structure that included geographic combatant commands What line of authority is used to accomplish the Title 10 requirements for the Secretary of the Army? - ANSWER ADCON Congress directs the Department of Army (DA) to accomplish certain tasks through ___________. - ANSWER US Code Title 10 The ____________ represents the total force that the Army Senior Leaders have identified for funding. - ANSWER POM Force Differentiate a TOE and MTOE. - ANSWER An MTOE is an authorizations document that details a resourced organization. A TOE is a requirement document that details the doctrinal requirements for an organization. After TAA, capabilities developers execute the _________ to document MTOEs and TDAs. - ANSWER Command Plan What is the primary decision-maker in the Total Army Analysis? - ANSWER The Chief of Staff of the Army (CSA) Within Total Army Analysis (TAA), the Quantitative Analysis phase ___________. - ANSWER Uses computer modeling to determine the total force requirements resulting from DoD planning scenarios.
Geschreven voor
- Instelling
- CGSC X100
- Vak
- CGSC X100
Documentinformatie
- Geüpload op
- 20 november 2022
- Aantal pagina's
- 4
- Geschreven in
- 2022/2023
- Type
- Tentamen (uitwerkingen)
- Bevat
- Vragen en antwoorden
Onderwerpen
-
cgsc x100
-
the model use
-
cgsc x100 exam with complete solutions
-
differentiate the roles of hqda g 357 and hqda g 1 in manning an organization
-
forscom the armys force provider follows