[Meer zien]What is a bid? - A guarantee to construct the project in accordance with the bid documents for a 
quoted price 
Employees who are fired for filing an OSHA complaint have ______ to notify OSHA. - 30 days 
To obtain the best price for materials you should obtain at least how many bids? - 3 
Getting to...
Voorbeeld 2 van de 6 pagina's
In winkelwagenWhat is a bid? - A guarantee to construct the project in accordance with the bid documents for a 
quoted price 
Employees who are fired for filing an OSHA complaint have ______ to notify OSHA. - 30 days 
To obtain the best price for materials you should obtain at least how many bids? - 3 
Getting to...
2x verkocht
A lump sum contract on a project has a total contract price of $160,000. Retainage has been held back at 
10%. The contractor has received progress payments for 75% of the project. The contractor submits a 
request for final payment for the new completed project. The final payment amount should be f...
Voorbeeld 1 van de 4 pagina's
In winkelwagenA lump sum contract on a project has a total contract price of $160,000. Retainage has been held back at 
10%. The contractor has received progress payments for 75% of the project. The contractor submits a 
request for final payment for the new completed project. The final payment amount should be f...
A contractor does not notify a change of address and so does not receive a timely Notice of Renewal. 
Who is responsible when the contractor does not renew his license on time? 
a) USBC 
b)OSHA 
c)The licensee Contractor 
d)DPOR - The licensee Contractor 
A designated employee should be? 
a)any full...
Voorbeeld 2 van de 8 pagina's
In winkelwagenA contractor does not notify a change of address and so does not receive a timely Notice of Renewal. 
Who is responsible when the contractor does not renew his license on time? 
a) USBC 
b)OSHA 
c)The licensee Contractor 
d)DPOR - The licensee Contractor 
A designated employee should be? 
a)any full...
What is the MAXIMUM penalty for a contractor who undertakes work without the proper class of 
license? - $500 fine per day for each day of violation plus penalties for a misdemeanor. 
All Class A contractor licensure applications MUST include - information on the knowledge, skills, and 
abilities of...
Voorbeeld 3 van de 17 pagina's
In winkelwagenWhat is the MAXIMUM penalty for a contractor who undertakes work without the proper class of 
license? - $500 fine per day for each day of violation plus penalties for a misdemeanor. 
All Class A contractor licensure applications MUST include - information on the knowledge, skills, and 
abilities of...
1x verkocht
What is the minimum distance from exposed ground for a wood framing member that is in contact 
with?? - 24 inches 
What is the maximum allowed slope for the top surface of a footing? - None 
Where should a drip edge be used? - Beneath the underlayment 
What is the minimum height for guard rails for ...
Voorbeeld 2 van de 12 pagina's
In winkelwagenWhat is the minimum distance from exposed ground for a wood framing member that is in contact 
with?? - 24 inches 
What is the maximum allowed slope for the top surface of a footing? - None 
Where should a drip edge be used? - Beneath the underlayment 
What is the minimum height for guard rails for ...
A contractor does not notify a change of address and so does not receive a timely Notice of Renewal. 
Who is responsible for when the contractor does not renew his license on time? - The Licensee 
Contractor 
A Designated Employee should be? - At least 18, Full Time, Passed Required Exams 
What is t...
Voorbeeld 2 van de 7 pagina's
In winkelwagenA contractor does not notify a change of address and so does not receive a timely Notice of Renewal. 
Who is responsible for when the contractor does not renew his license on time? - The Licensee 
Contractor 
A Designated Employee should be? - At least 18, Full Time, Passed Required Exams 
What is t...
1x verkocht
What is the MAXIMUM penalty for a contractor who undertakes work without the proper class of 
license? - $500 fine per day for each day of violation plus penalties for a misdemeanor. 
What is the PRIMARY purpose of licensing? - Protect the health and welfare of the public. 
The application for licen...
Voorbeeld 2 van de 7 pagina's
In winkelwagenWhat is the MAXIMUM penalty for a contractor who undertakes work without the proper class of 
license? - $500 fine per day for each day of violation plus penalties for a misdemeanor. 
What is the PRIMARY purpose of licensing? - Protect the health and welfare of the public. 
The application for licen...
4x verkocht
Which of the following estimating methods is typically used by the architect rather than the contractor? - 
Conceptual estimate 
An agreement that calls for a contractor to be paid actual costs for labor and materials plus a fixed fee 
for the contractor's overhead and profit is called a... - cost ...
Voorbeeld 2 van de 5 pagina's
In winkelwagenWhich of the following estimating methods is typically used by the architect rather than the contractor? - 
Conceptual estimate 
An agreement that calls for a contractor to be paid actual costs for labor and materials plus a fixed fee 
for the contractor's overhead and profit is called a... - cost ...
Studenten hebben al meer dan 850.000 samenvattingen beoordeeld. Zo weet jij zeker dat je de beste keuze maakt!
Geen gedoe — betaal gewoon eenmalig met iDeal, creditcard of je Stuvia-tegoed en je bent klaar. Geen abonnement nodig.
Studenten maken samenvattingen voor studenten. Dat betekent: actuele inhoud waar jij écht wat aan hebt. Geen overbodige details!
Je krijgt een PDF, die direct beschikbaar is na je aankoop. Het gekochte document is altijd, overal en oneindig toegankelijk via je profiel.
Onze tevredenheidsgarantie zorgt ervoor dat je altijd een studiedocument vindt dat goed bij je past. Je vult een formulier in en onze klantenservice regelt de rest.
Stuvia is een marktplaats, je koop dit document dus niet van ons, maar van verkoper AmazingGrace. Stuvia faciliteert de betaling aan de verkoper.
Nee, je koopt alleen deze samenvatting voor €38,18. Je zit daarna nergens aan vast.
4,6 sterren op Google & Trustpilot (+1000 reviews)
Afgelopen 30 dagen zijn er 63950 samenvattingen verkocht
Opgericht in 2010, al 15 jaar dé plek om samenvattingen te kopen