100% tevredenheidsgarantie Direct beschikbaar na betaling Zowel online als in PDF Je zit nergens aan vast
logo-home
Tech. & Operations Management- Project Management Lecture Notes, Reading List Book Summaries and Essay Plans €4,92   In winkelwagen

Overig

Tech. & Operations Management- Project Management Lecture Notes, Reading List Book Summaries and Essay Plans

 13 keer bekeken  0 keer verkocht
  • Vak
  • Instelling

Detailed notes, including lecture notes, reading list book summaries and essay plans for the Oxford University FHS Technology & Operations Management course's section on Project Management (Week 8 of the course).

Voorbeeld 3 van de 20  pagina's

  • 7 september 2021
  • 20
  • 2021/2022
  • Overig
  • Onbekend
avatar-seller
Project Management

Definitions for Project Management- Maylor (2005)
 Project: "A unique set of coordinated activities, with definite starting and finishing
points, undertaken by an individual or organization, to meet specific performance
objectives within defined schedule, cost and performance parameters"(BS6079, 2000)
 Slack et al (2019): a set of activities with a defined start point & a defined end state,
which pursues a defined goal and sues a defined set of resources
 "A temporary endeavour undertaken to create a unique product or service" (PMI, 2000)
 A low-volume, high variety activity
 E.g. Westgate, dams, LHR, mega events (2012 London Olympics, Glastonbury)
 Project Management: the activity of defining, planning and executing projects of any
type.

Other Definitions in Project Management
 Schedule- result of transforming a project action plan into an operating timetable
 Activity- task that requires time & resources
 Event- end state
 Path- a serios of connected activities
 Network- map of arcs & nodes that describe the project

The Volume/ Variety Matrix




Mega Projects
 Cost over $1B/ £1B, take more than 5 years, change the way a large organisation or
state does something, any stakeholders involved
 Mega projects used to fight global challenges e.g. energy (power stations, renewables),
food & water (desalination, irrigation), population growth (infrastructure, housing),
health (COVID-19 Vaccination programme), etc
 Mega-projects characterised by
o Multiple strategic objectives
o Long-term planning horizons
o Novel, non-standard technology

, o High uncertainty in cost, benefit and risk forecasting
o Complex governance, contract and decision-making structures
o Project lock-in or capture at early stage
o Scope and ambition change over life-cycle
o Dynamic political and economic environment
o Multiple stakeholders with changing agendas
 Mega-project are complex due to:
o Technical elements: time dimensions, multiple stakeholders, complexity and
uncertainty, complex communication, projects are a technical network, not a
hierarchy
o Social elements: Conflicting, unclear or emergent goals, Organisational
leadership, Control or Commitment culture, Projects are a social network, not a
hierarchy, Experience periods of failure, Crises are normal

Historical development of PM
 Stage 1: Pre 1950s- no generally accepted or defined methods
 Stage 2: 1950s- one best way approach based on numerical methods established in the
US for large scale projects
 Stage 3: 1990s- A contingent approach based on strategy
 Stage 4: 2000s- projects as organisations

General Management Project Management
Responsible for managing the status quo Responsible for overseeing change
Authority defined by management Lines of authority are fuzzy
structure
Consistent set of tasks Ever changing set of tasks
Responsibility limited to own function Responsibility for cross-functional activities
Works in permanent organisational Operates within structures which exist for
structures the life of the project
Works in permanent organisational Predominantly concerned with innovation
structures
Tasks described as maintenance Main task is the resolution of conflict
Main task is optimisation Success determined by the achievement of
a stated goal
Success determined by achievement of Contains intrinsic uncertainties
interim targets
Limited set of variables
General Management vs Project Management

Project Management Structure Models
 All projects need a project manager- manage human resources
o People need clear understanding of their own roles
o Allocate different tasks
o Respond to rapid exchange of info between stakeholders

Project Development- Maylor (2003)

, Understanding the environment
Define the project- setting objectives, scope & strategy
 Conceptualisation, goal defintion, organisational strategy
 Generate explicit statement of needs and identifity what has to be provided to meet
these needs and whether it is feasible.

Design the project process- deciding how to execute the project
 Proposal, justification, agreement: show how needs met through project activites and
prepare and evaluate financial costs and benefits
 How will it be done? When can it start and finish?
 Planning process purposes:
o Determines the cost and duration of the project- Enables major
decisions to be made like whether to start project at all
o Determines level of resources needed
o Helps allocate work & monitor progress- who is responsible for what
o Helps assess impact of changes to project
 5 steps in planning progress:
o Identify activities in project
o Estimate times & resources for activities
o Identify relationship between activities
o Identify time & resource schedule constraints
o Fix schedule for time & resources
o The third stage of planning is understanding the interactions between
different project activities: Activities need to be executed in a particular
order are dependent on a series of relationships (others are
independent)

Deliver the project- performing the technical aspects of the project
 Start-up, execution, completion, handover: gather resources, assemble teams, carry out
defined tasks

Develop the process- reviewing
 Review, feedback: identify outcomes for all stakeholders and put in place improvements
to procedures, fall knowledge gaps

The basic approach of all scheduling techniques is to form an actual or implied network of
activity and event relationships that graphically portrays the sequential relations between
the tasks of a project

Voordelen van het kopen van samenvattingen bij Stuvia op een rij:

Verzekerd van kwaliteit door reviews

Verzekerd van kwaliteit door reviews

Stuvia-klanten hebben meer dan 700.000 samenvattingen beoordeeld. Zo weet je zeker dat je de beste documenten koopt!

Snel en makkelijk kopen

Snel en makkelijk kopen

Je betaalt supersnel en eenmalig met iDeal, creditcard of Stuvia-tegoed voor de samenvatting. Zonder lidmaatschap.

Focus op de essentie

Focus op de essentie

Samenvattingen worden geschreven voor en door anderen. Daarom zijn de samenvattingen altijd betrouwbaar en actueel. Zo kom je snel tot de kern!

Veelgestelde vragen

Wat krijg ik als ik dit document koop?

Je krijgt een PDF, die direct beschikbaar is na je aankoop. Het gekochte document is altijd, overal en oneindig toegankelijk via je profiel.

Tevredenheidsgarantie: hoe werkt dat?

Onze tevredenheidsgarantie zorgt ervoor dat je altijd een studiedocument vindt dat goed bij je past. Je vult een formulier in en onze klantenservice regelt de rest.

Van wie koop ik deze samenvatting?

Stuvia is een marktplaats, je koop dit document dus niet van ons, maar van verkoper edoardocolao. Stuvia faciliteert de betaling aan de verkoper.

Zit ik meteen vast aan een abonnement?

Nee, je koopt alleen deze samenvatting voor €4,92. Je zit daarna nergens aan vast.

Is Stuvia te vertrouwen?

4,6 sterren op Google & Trustpilot (+1000 reviews)

Afgelopen 30 dagen zijn er 76669 samenvattingen verkocht

Opgericht in 2010, al 14 jaar dé plek om samenvattingen te kopen

Start met verkopen
€4,92
  • (0)
  Kopen