An full and extensive summary (100+ pages) based on the lecture slides complimented by chapters 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 12, 14, 15, 16 of the book: Lean Production for Competitive Advantage : A Comprehensive Guide to Lean Methodologies and Management Practices by John Nicholas 2th edition an...
Summary Design and Planning of Production by Tobias Schiphorst
1. Manufacturing strategy, product/process matrix & resource based view ......................................... 6
1.1 Manufacturing strategy ................................................................................................................. 6
1.2 Product/Process matrix ................................................................................................................. 7
1.3 Resource based view ................................................................................................................... 12
1.4 Manufacturing Strategy: Defining the missing link Steven C. Wheelwright ............................... 14
1.4.1 Overview............................................................................................................................... 14
1.4.2 Management philosophy, driving forces and competitive advantage ................................. 14
1.4.3 Driving forces ........................................................................................................................ 15
1.4.4 Competitive priorities........................................................................................................... 15
1.4.5 Concept of manufacturing strategy ..................................................................................... 15
1.4.6 Three primary levels of strategy within manufacturing ....................................................... 16
1.4.7 Manufacturing functional strategy....................................................................................... 16
1.4.8 Manufacturing corporate strategy ....................................................................................... 16
1.4.9 Role of manufacturing in defining desired competitive advantage ..................................... 17
1.5 An Empirical Analysis of the Product-Process Matrix M. Hossein Safizadeh, Larry P. Ritzman,
Deven Sharma, Craig Wood .............................................................................................................. 17
1.5.1 Process choice ...................................................................................................................... 17
1.5.2 Process choice linked to product plans ................................................................................ 18
1.5.3 Process choice linked to competitive priorities ................................................................... 19
1.5.4 Process choice and performance ......................................................................................... 19
1.5.5 Propositions & findings ........................................................................................................ 19
1.5.6 Conclusion ............................................................................................................................ 20
1.6 A resource-based view of manufacturing strategy and the relationship to manufacturing
performance Roger G. Schroeder, Kimberly A. Bates and Mikko A. Junttila .................................... 21
1.6.1 Resource based view (RBV) .................................................................................................. 21
1.6.2 Manufacturing and RBV ....................................................................................................... 21
1.6.3 Internal learning ................................................................................................................... 21
1.6.4 External learning................................................................................................................... 22
1.6.4 Proprietary manufacturing processes and equipment ........................................................ 22
1.6.5 Manufacturing performance ................................................................................................ 22
1.6.6 Conclusions ........................................................................................................................... 22
2. Lean production ................................................................................................................................ 22
2.1 Introduction of Lean production ................................................................................................. 22
2.2 Lean toolbox ................................................................................................................................ 26
2.3 The human side of Lean .............................................................................................................. 36
1
,3. Layout and flow & small batches ...................................................................................................... 40
3.1 Layout and flow ........................................................................................................................... 40
3.2 Batch-size basics .......................................................................................................................... 43
3.3 Small batches............................................................................................................................... 43
3.3.1 Focus in batching .................................................................................................................. 43
3.3.2 Buffers .................................................................................................................................. 44
3.3.3 Cause of large batches.......................................................................................................... 44
3.4 Batch sizing .................................................................................................................................. 45
3.4.1 Batch-for-Batch and POQ ..................................................................................................... 45
3.4.2 Economic Order Quantity (EOQ) .......................................................................................... 45
3.4.3 Economic Manufacturing Quantity (EMQ) ........................................................................... 46
3.4.4 Batch size effects .................................................................................................................. 47
3.4.5 EOQ-based methods: Discussion .......................................................................................... 48
3.5 Appropriate coordination techniques ......................................................................................... 48
4. Scheduling ......................................................................................................................................... 49
4.1 What is scheduling ...................................................................................................................... 49
4.1.1 Why schedule ....................................................................................................................... 49
4.2 Mixed-Model Production: Heijunka ............................................................................................ 50
4.2.1 Heijunka ................................................................................................................................ 50
4.3 Priority rules ................................................................................................................................ 50
4.3.1 First-Come-First-Serve (FCFS) ............................................................................................... 51
4.3.2 Shortest-Processing-Time-First (SPTF) ................................................................................. 51
4.3.3 Earliest-Due-Date (EDD) ....................................................................................................... 52
4.4 Why should we schedule? ........................................................................................................... 52
4.5 Performance criteria & interconnections of planning................................................................. 53
4.6 An empirical investigation of scheduling performance criteria .................................................. 54
4.7 Outflanking Undecided Ever-changing puzzles ........................................................................... 56
4.7.1 Scheduling paradigms (models/theories) ............................................................................ 56
4.7.2 Why scheduling problems are difficult................................................................................. 56
4.7.3 Behavioural aspects of planning and scheduling ................................................................. 57
4.7.4 The organizational interconnectivity of planning and scheduling ....................................... 59
4.7.5 Computer support for planning and scheduling .................................................................. 60
4.7.6 Behavioural effects of using scheduling algorithms ............................................................. 60
4.7.7 Design methodology for scheduling support ....................................................................... 61
4.7.8 Discussion ............................................................................................................................. 62
5. Smart industry / Industry 4.0 ............................................................................................................ 63
2
, 5.1 Industrial revolutions .................................................................................................................. 63
5.2 Industry 4.0.................................................................................................................................. 63
5.3 Physical Internet (PI) ................................................................................................................... 64
5.4 Condition based maintenance (CBM) ......................................................................................... 64
5.5 Smart industry enablers .............................................................................................................. 64
5.6 Smart industry / industry 4.0 link to OM..................................................................................... 66
5.6 Paper : Industry 4.0 ..................................................................................................................... 68
5.6.1 Application-pull and technology-push ................................................................................. 68
5.6.2 Fundamental Concepts......................................................................................................... 68
5.6.3 Relevance for Business and Information Systems Engineering and Exemplary Fields of
Application..................................................................................................................................... 68
5.6.4 Summary and expected trends ............................................................................................ 69
5.7 Paper : Industry 4.0 Opportunities and challenges for operations management ...................... 69
5.7.1 Introduction .......................................................................................................................... 69
5.7.2 Additive manufacturing (3D printing) .................................................................................. 70
5.7.3 The Internet of Things .......................................................................................................... 70
5.7.4 Blockchain............................................................................................................................. 70
5.7.5 Advanced Robotics ............................................................................................................... 71
5.7.6 Artificial Intelligence ............................................................................................................. 71
5.7.7 Other technologies ............................................................................................................... 72
5.7.8 Conclusion ............................................................................................................................ 72
6. Pull production .................................................................................................................................. 73
6.1 Traditional coordination .............................................................................................................. 74
6.2 Pull production ............................................................................................................................ 74
6.3 2-bin system ................................................................................................................................ 75
6.4 Pull production with buffers (ROP) ............................................................................................. 75
6.5 Kanban ......................................................................................................................................... 76
6.5.1 Conveyance Kanbans ............................................................................................................ 77
6.5.2 Production Kanbans ............................................................................................................. 77
6.5.3 Lecture example Kanban ...................................................................................................... 78
6.5.4 More Kanban cards .............................................................................................................. 78
6.6 Rules for pull production with Kanban ........................................................................................ 79
6.7 Some additional notes................................................................................................................. 79
7. Cellular Manufacturing ...................................................................................................................... 80
7.1 What is Cellular Manufacturing? ................................................................................................. 80
7.2 From Process layout to Cellular Manufacturing .......................................................................... 80
3
, 7.2.1 Planning and control ............................................................................................................ 81
7.2.2 Organizational issues ............................................................................................................ 81
7.2.3 Attitudinal issues .................................................................................................................. 81
7.3 (Dis)advantages of Cellular Manufacturing ................................................................................. 81
7.4 How are the cells determined (group technology) ..................................................................... 82
7.4.1 Focused factories.................................................................................................................. 82
7.5 Group formation.......................................................................................................................... 83
7.5.1 Group technology (GT coding) ............................................................................................. 83
7.5.1 Visual cluster analysis ........................................................................................................... 83
7.5.2 Production Flow Analysis (PFA) ............................................................................................ 83
7.6 Binary Ordering algorithm example ............................................................................................ 84
7.6.1 Dense blocks, Then what? .................................................................................................... 87
7.6.2 Binary Ordering algorithm .................................................................................................... 87
7.7 Now organize the group itself ..................................................................................................... 88
7.7.1 Work cell design ................................................................................................................... 88
7.7.2 Assembly workcell formulas ................................................................................................. 88
7.7.3 Machining workcell formulas ............................................................................................... 90
8. Line balancing .................................................................................................................................... 90
8.1 Line production ........................................................................................................................... 91
8.1.1 Flow line ............................................................................................................................... 91
8.2 Balancing ..................................................................................................................................... 91
8.3 Line balancing .............................................................................................................................. 91
8.3.1 Line Balancing steps ............................................................................................................. 92
8.3.2 Precedence diagram; production of bicycles ....................................................................... 92
8.3.3 Calculate the efficiency of a sequence of workstations ....................................................... 93
8.3.4 Longest processing time ....................................................................................................... 93
8.3.5 Weighted average time ........................................................................................................ 97
8.3.6 Rank Positional Weight example .......................................................................................... 98
8.3.7 Uncertainty in task times.................................................................................................... 102
4
Voordelen van het kopen van samenvattingen bij Stuvia op een rij:
Verzekerd van kwaliteit door reviews
Stuvia-klanten hebben meer dan 700.000 samenvattingen beoordeeld. Zo weet je zeker dat je de beste documenten koopt!
Snel en makkelijk kopen
Je betaalt supersnel en eenmalig met iDeal, creditcard of Stuvia-tegoed voor de samenvatting. Zonder lidmaatschap.
Focus op de essentie
Samenvattingen worden geschreven voor en door anderen. Daarom zijn de samenvattingen altijd betrouwbaar en actueel. Zo kom je snel tot de kern!
Veelgestelde vragen
Wat krijg ik als ik dit document koop?
Je krijgt een PDF, die direct beschikbaar is na je aankoop. Het gekochte document is altijd, overal en oneindig toegankelijk via je profiel.
Tevredenheidsgarantie: hoe werkt dat?
Onze tevredenheidsgarantie zorgt ervoor dat je altijd een studiedocument vindt dat goed bij je past. Je vult een formulier in en onze klantenservice regelt de rest.
Van wie koop ik deze samenvatting?
Stuvia is een marktplaats, je koop dit document dus niet van ons, maar van verkoper tobiasschiphorst. Stuvia faciliteert de betaling aan de verkoper.
Zit ik meteen vast aan een abonnement?
Nee, je koopt alleen deze samenvatting voor €4,49. Je zit daarna nergens aan vast.