100% tevredenheidsgarantie Direct beschikbaar na betaling Zowel online als in PDF Je zit nergens aan vast
logo-home
Summary Chapter 18 'managing risk' Gower Handbook of Project Management, ISBN: 9781472422965 €3,49   In winkelwagen

Samenvatting

Summary Chapter 18 'managing risk' Gower Handbook of Project Management, ISBN: 9781472422965

 15 keer bekeken  0 keer verkocht

Chapter 18 Gower Handbook of Project Management, ISBN: 2965

Voorbeeld 2 van de 6  pagina's

  • Onbekend
  • 7 oktober 2022
  • 6
  • 2022/2023
  • Samenvatting
book image

Titel boek:

Auteur(s):

  • Uitgave:
  • ISBN:
  • Druk:
Alle documenten voor dit vak (16)
avatar-seller
RSCHO
Summary of the hand of project management | Remco van der Schoot




Multitasking Doesn’t support multitasking Allows multitasking (two activities can be
completed in the same time)
Delays Delays are on non-essential tasks Member can immediately start on such
activities
Real-time Uses real-time monitoring and buffer for The duration for certain task may lengthen
activities each activity to ensure on-time completion when an activity needs extra time
applicability When there are unlimited resources and a When there are limited resources and a fixed
flexible deliverable deliverable
Additional sources: Critical Chain vs Critical Path (CCPM vs CPM) | Wrike Guide, Critical Path Method vs
Critical Chain Method for PMP Exam - Updated PMP, PMI-ACP & ITIL Exam Tips 2022 (edward-designer.com)
& 5 Advantages of Critical Chain vs Critical Path (pm-training.net)

2.5. HOOFDSTUK 18 – MANAGING RISK (P.281-305)


2.5.1. RISK CONCEPTS
Managing risk in projects includes all sources of uncertainty, can be both positive and/or negative and can also
exists at the overall project level. The two levels of risks include:
1. Risks in the project:
o Risk events/individual risk = a specific discrete thing that might or might not happen in the
future, but which if they did happen would have a significant effect on achievement of one or
more project objectives.
2. Risk of the project (two definitions):
o Project risk = the exposure of stakeholders to the consequences of variations in the outcome
o Overall project risk = the effect of uncertainty on the project as a whole

The project manager is required to manage:
- Individual risk/risk events -> identifying, assessing and managing individual risk
- (overall) project risk -> account to the project sponsor, project owner and other stakeholders overall
project risk

How to manage both type of risks:
▪ Overall project risk should be addressed as soon as the
pre-project or concept phase, when the scope and
objectives are clarified and agreed upon.
o Risk-reward balance should be agreed upon
through decisions about structure, scope,
content and context of the project
▪ When the project is initiated traditional project risk
process can be used to address explicitly the individual risks that lie within the project.
▪ At key points in the project it will be necessary to revisit the assessment of overall project risk



P a g i n a 25 | 35

, Summary of the hand of project management | Remco van der Schoot


2.5.2. INTRODUCING THE RISK PROCESS
Informal step Formal process Purpose
Getting started [what are Risk process To define the scope, objections, and practical parameters of
we trying to achieve?] initiation the project risk management process
Finding risks [what could Risk To identify all currently knowable risks, including both
affect us achieving this?] identification individual risks and sources of overall project risk
Setting priorities [Which of Qualitative Risk To evaluate key characteristics of individual risks enabling
those things are most Assessment them to be prioritized for further action, and recognizing
important?] patterns of risk exposure
Quantitative To evaluate the combined effect of risks on the project
Risk Analysis outcome and assess overall project risk exposure
Deciding what to do [What Risk Response To determine appropriate response strategies and actions
shall we do about them?] Planning for each individual risk and for overall project risk
Acting [Did we do what we Risk Response To implement agreed actions, determine whether they are
said we would do?] Implementation working and identify any resultant secondary risks
Telling others [Who needs Risk To inform project stakeholders about the current level of
to know?] communication risk exposure and its implications for project success,
including both individual risks and overall project risk, as
appropriate
Keeping up to date [What Risk Review To review changes in identified risks and overall project risk
has changed and what exposure, identify additional actions as required and assess
should we do now?] the effectiveness of the project risk management process
Capturing lessons [What Post-Project To identify risk-related lessons to be learned for future
did we learn?] Review projects




P a g i n a 26 | 35

Voordelen van het kopen van samenvattingen bij Stuvia op een rij:

Verzekerd van kwaliteit door reviews

Verzekerd van kwaliteit door reviews

Stuvia-klanten hebben meer dan 700.000 samenvattingen beoordeeld. Zo weet je zeker dat je de beste documenten koopt!

Snel en makkelijk kopen

Snel en makkelijk kopen

Je betaalt supersnel en eenmalig met iDeal, creditcard of Stuvia-tegoed voor de samenvatting. Zonder lidmaatschap.

Focus op de essentie

Focus op de essentie

Samenvattingen worden geschreven voor en door anderen. Daarom zijn de samenvattingen altijd betrouwbaar en actueel. Zo kom je snel tot de kern!

Veelgestelde vragen

Wat krijg ik als ik dit document koop?

Je krijgt een PDF, die direct beschikbaar is na je aankoop. Het gekochte document is altijd, overal en oneindig toegankelijk via je profiel.

Tevredenheidsgarantie: hoe werkt dat?

Onze tevredenheidsgarantie zorgt ervoor dat je altijd een studiedocument vindt dat goed bij je past. Je vult een formulier in en onze klantenservice regelt de rest.

Van wie koop ik deze samenvatting?

Stuvia is een marktplaats, je koop dit document dus niet van ons, maar van verkoper RSCHO. Stuvia faciliteert de betaling aan de verkoper.

Zit ik meteen vast aan een abonnement?

Nee, je koopt alleen deze samenvatting voor €3,49. Je zit daarna nergens aan vast.

Is Stuvia te vertrouwen?

4,6 sterren op Google & Trustpilot (+1000 reviews)

Afgelopen 30 dagen zijn er 82191 samenvattingen verkocht

Opgericht in 2010, al 14 jaar dé plek om samenvattingen te kopen

Start met verkopen
€3,49
  • (0)
  Kopen