100% tevredenheidsgarantie Direct beschikbaar na betaling Zowel online als in PDF Je zit nergens aan vast
logo-home
PSPO 1 EXAM WITH COMPLETE SOLUTIONS. €14,75   In winkelwagen

Tentamen (uitwerkingen)

PSPO 1 EXAM WITH COMPLETE SOLUTIONS.

1 beoordeling
 14 keer bekeken  0 keer verkocht
  • Vak
  • PSPO I
  • Instelling
  • PSPO I

PSPO 1 EXAM WITH COMPLETE SOLUTIONS.

Voorbeeld 3 van de 17  pagina's

  • 12 december 2022
  • 17
  • 2022/2023
  • Tentamen (uitwerkingen)
  • Vragen en antwoorden
  • PSPO I
  • PSPO I

1  beoordeling

review-writer-avatar

Door: danilohellerprates • 1 jaar geleden

avatar-seller
PSPO 1 EXAM WITH COMPLETE
SOLUTIONS.
In order to make investment decisions, the Product Owner is likely to look at the
Total Cost of Ownership (TCO) of the product being built. What costs will a Product
Owner take into account? - Answer All investments required to conceive, develop,
operate and maintain the product

What best describes the relationship of the Product Owner and the stakeholders? -
Answer The Product Owner actively asks for stakeholder input and expectations to
process into the Product Backlog.

Learning turns into 'validated learning' when assumptions and goals can be
assessed through results. What is a key way for a Product Owner to apply validated
learning? - Answer Release an Increment to the market to learn about the business
assumptions built into the product.

When can the Product Backlog be updated? - Answer At any time when done by the
Product Owner or at the Product Owner's discretion

How important is it for a Product Owner to order Product Backlog items by value
points? - Answer It is a good practice, keeping in mind that market reception is the
best measure of value.

What are two typical activities for a Product Owner in a Sprint? - Answer -Work with
the Development Team on Product Backlog refinement.
-Collaborate with stakeholders, user communities, and subject matter experts.

True or False: The Scrum Team should choose at least one high priority process
improvement, identified during the Sprint Retrospective, and place it in the Product
Backlog. - Answer False

True or False: The value delivered by a product can only be determined by revenue.
- Answer False

The process of regular inspection and adaptation employs knowledgeable and
skilled inspectors. What are two ways in which the Product Owner takes the lead in
the inspection process? - Answer -At the Sprint Review the Product Owner shares
the current state of Product Backlog, which, combined with the inspection of the
Increment, leads to an updated Product Backlog.
-The Product Owner invites stakeholders to the Sprint Review to learn how the
current state of the marketplace influences what is the most valuable thing to do
next.

What two things should be done if the Product Owner is unavailable? - Answer -
Within the Sprint, the Development Team makes the best decisions possible to
assure progress toward the Sprint Goal, re-aligning with the Product Owner once
he/she is available again.
-In a permanent state of unavailability, a new Product Owner needs to be appointed.
Development efforts without a Product Owner are not employing Scrum.

,PSPO 1 EXAM WITH COMPLETE
SOLUTIONS.
It is mandatory for the Product Owner to monitor and share progress of the Product
Backlog by using which method? - Answer Any practice based on trends of work
completed and upcoming work

The Product Owner's authority to change and update the Product Backlog is
unlimited, except for: - Answer Nothing. The entire organization must respect a
Product Owner's decisions.

To what extent does technical debt limit the value a Product Owner can get from a
product? - Answer -Technical debt causes a greater percentage of the product's
budget to be spent on maintenance of the product.
-The velocity at which new functionality can be created is reduced when you have
technical debt.

True or False: The Sprint Review is the only time at which stakeholder feedback is
taken into account. - Answer False

True or False: A Product Owner is essentially the same thing as a traditional Project
Manager? - Answer False

Which two statements explain why the definition of "Done" is important to the
Product Owner? - Answer -It assures the Increment reviewed at the Sprint review is
usable so the Product Owner may choose to release it.
-It creates transparency regarding progress within the Scrum Team.

What is the Product Owner accountable for in Scrum? - Answer Clearly expressing a
Product Backlog that maximizes value and represents the needs of the stakeholders

How does an organization know that a product built through Scrum is successful? -
Answer By releasing often, and updating key performance indicators (KPIs) on value
after every release and feeding this information back into work on the Product
Backlog

What two things best help the Product Owner manage the value of a product? -
Answer -The order of the Product Backlog
-Validating assumptions of value through frequent releases

What variables should a Product Owner consider when ordering the Product
Backlog? - Answer Whatever is most appropriate for the Product Owner to achieve
the product's goals and to optimize the value received

How can a Product Owner use time-boxed Sprints to obtain feedback from users and
the market? - Answer Through frequent delivery of Increments of the product into the
market.

The Product Owner manages the Product Backlog. Who is accountable for
estimating the effort to complete the Product Backlog items? - Answer The

, PSPO 1 EXAM WITH COMPLETE
SOLUTIONS.
Development Team. As a collective, they have a complete view of the work needed
to transform Product Backlog items into Increments of product.

Must the Product Owner be present at the Sprint Retrospective? - Answer It is
mandatory. The Sprint Retrospective is an opportunity for the Scrum Team to assess
its performance and improve itself.

Which description best fits the role of the Product Owner? - Answer Value Maximizer

Who creates the definition of "Done"? - Answer The development organization (or
Development Team if none is available from the development organization)

A Product Owner is entitled to postpone the start of a new Sprint after the conclusion
of a previous Sprint for the following reason: - Answer There is no acceptable
reason. A new Sprint starts immediately after the conclusion of the previous Sprint.

What is a Product Backlog? - Answer It is a living artifact of product requirements
that exists and evolves as long as a product exists.

What pre-conditions must be fulfilled in order to allow Sprint Planning to begin? -
Answer There are no such pre-conditions

What two phrases best describe the relationship of the Product Owner and the
Development Team? - Answer -They collaborate often so the Product Owner can
make informed decisions in balancing effort and value of Product Backlog items.
-They collaborate often so the Development Team builds Increments keeping end-
user and stakeholder concerns in mind.

Who is responsible for managing the Product Backlog? - Answer The Product Owner

Select the two focus areas that are not considered in executing Value Driven
Development by the Product Owner. - Answer -Coach of the Development Team in
self-organization and cross-functionality
-Remover of impediments to the Development Team's progress

Who is responsible for all estimates in the Product Backlog? - Answer The
Development Team

What are the Scrum Artifacts? Select all applicable items. - Answer -Product Backlog
-Sprint Backlog
-Increment
-The Sprint Goal

What is the Increment? - Answer All items in the Sprint Backlog that could be
released regardless of whether the Product Owner decides to actually do it

What could be a source of requirements for any changes to be made to the product?
- Answer The Product Backlog

Voordelen van het kopen van samenvattingen bij Stuvia op een rij:

Verzekerd van kwaliteit door reviews

Verzekerd van kwaliteit door reviews

Stuvia-klanten hebben meer dan 700.000 samenvattingen beoordeeld. Zo weet je zeker dat je de beste documenten koopt!

Snel en makkelijk kopen

Snel en makkelijk kopen

Je betaalt supersnel en eenmalig met iDeal, creditcard of Stuvia-tegoed voor de samenvatting. Zonder lidmaatschap.

Focus op de essentie

Focus op de essentie

Samenvattingen worden geschreven voor en door anderen. Daarom zijn de samenvattingen altijd betrouwbaar en actueel. Zo kom je snel tot de kern!

Veelgestelde vragen

Wat krijg ik als ik dit document koop?

Je krijgt een PDF, die direct beschikbaar is na je aankoop. Het gekochte document is altijd, overal en oneindig toegankelijk via je profiel.

Tevredenheidsgarantie: hoe werkt dat?

Onze tevredenheidsgarantie zorgt ervoor dat je altijd een studiedocument vindt dat goed bij je past. Je vult een formulier in en onze klantenservice regelt de rest.

Van wie koop ik deze samenvatting?

Stuvia is een marktplaats, je koop dit document dus niet van ons, maar van verkoper EvaTee. Stuvia faciliteert de betaling aan de verkoper.

Zit ik meteen vast aan een abonnement?

Nee, je koopt alleen deze samenvatting voor €14,75. Je zit daarna nergens aan vast.

Is Stuvia te vertrouwen?

4,6 sterren op Google & Trustpilot (+1000 reviews)

Afgelopen 30 dagen zijn er 82265 samenvattingen verkocht

Opgericht in 2010, al 14 jaar dé plek om samenvattingen te kopen

Start met verkopen
€14,75
  • (1)
  Kopen