100% tevredenheidsgarantie Direct beschikbaar na betaling Zowel online als in PDF Je zit nergens aan vast
logo-home
BTEC Unit 9 IT Project Management - Assignment 2 2023 | National Diploma in Information Technology €17,08   In winkelwagen

Tentamen (uitwerkingen)

BTEC Unit 9 IT Project Management - Assignment 2 2023 | National Diploma in Information Technology

 114 keer bekeken  2 keer verkocht
  • Vak
  • Instelling

BTEC Unit 9 IT Project Management - Assignment 2 2023 | National Diploma in Information Technology. User Interface of the Project: The interface that I have chosen for this website is Graphical User Interface (GUI) as this type of interface is visually instinctive/intuitive to use and suitable fo...

[Meer zien]

Voorbeeld 4 van de 59  pagina's

  • 21 februari 2023
  • 59
  • 2022/2023
  • Tentamen (uitwerkingen)
  • Vragen en antwoorden
avatar-seller
BTEC Unit 9 IT
Project Management
- Assignment 2 2023 |
National Diploma in
Information Technology

,Unit 9: IT Project
Management
Assignment 2


E. Bullion National Diploma in Information Technology

,Unit 9: IT Project Management


BTEC Assignment Brief
BTEC Level 3 Diploma in Information Technology
Qualification BTEC Level 3 Extended Diploma in Information Technology

Unit number and title
Unit 9: IT Project Management
B: Carry out a project initiation for an IT project
Learning aim(s) (For NQF
C: Carry out the planning, execution, monitoring and
only)
controlling of an IT project, using an appropriate methodology
Project Management in action
Assignment title

Assessor
O.Brown
Issue date
01/12/2021
Hand in deadline
22/12/2021


You have recently been recruited by a new software
development company based in Enniskillen as a trainee
project manager. You have been asked to manage your first
software development project
Vocational Scenario or
Context




You have been asked to project manage the development of a
software solution (the software solution will be developed for
Unit 6 – Web Development)
You need to:
• Research and evaluate two possible solutions to the IT
problem, identifying and evaluating the project risks and
constraints and suggest viable methods of controlling the
risks.
Task 1 • Prepare a feasibility study (including an introduction to the
project, overall description, a requirements specification
and success criteria) and select a preferred solution.)
• Project manage the development of the software solution,
including the planning, execution, monitoring and control of
the project. You need to perform the project management
processes in a consistent and effective manner using an
appropriate methodology. You should include evidence of:
o Project phasing, dividing up the user requirements.



1

, Unit 9: IT Project Management


o Use of typical project management processes such
as the development of risks, issues and tasks,
prioritising of work, management of barriers or
constraints, regular meetings, budget and resource
control)

Checklist of evidence • Evaluation of two possible solutions
required • Evidence of research into two different solutions
• Feasibility study
• Evidence of project management planning, monitoring and
control of the development activities

Criteria covered by this task:
Unit/Criteria
To achieve the criteria you must show that you are able to:
reference
Evaluate consistently and comprehensively at least two researched
BC.D2 and realistic solutions to an IT problem on a given theme and justify
using logical chains of reasoning a preferred solution.
Perform consistently and effectively appropriate project management
BC.D3
processes to implement an IT-based project.
Assess consistently at least two adequately researched solutions to an IT
B.M2
problem on a given theme and recommend a preferred solution.
Perform soundly and consistently appropriate project management
C.M3
processes to implement an IT-based project.
Research with some inconsistencies an IT problem, based on a given
B.P3
theme and scope out at least two alternative solutions.
Prepare with some inconsistencies a feasibility study on an IT project and
B.P4
select a preferred solution.
Plan with some inconsistencies and/or omissions the implementation of
C.P5
an IT project.
Execute with some inconsistencies and/or omissions the implementation
C.P6
of an IT project.
Monitor and control with some inconsistencies and/or omissions the
C.P7
implementation of an IT project.

Sources of information to
support you with this Lawton, I. PRINCE2 Made Simple, P2MS Press, 2015. 978-
Assignment 0992816339
Cole,R. and Scotcher, E. Brilliant Agile Project Management: A
Practical Guide to Using Agile, Scrum and Kanban, Pearson
2015. 978-1292063560
Newton, R. Project Management Step by Step: How to Plan
and Manage a Highly Successful Project, Pearson 2016. 978-
1292142197




2

Voordelen van het kopen van samenvattingen bij Stuvia op een rij:

Verzekerd van kwaliteit door reviews

Verzekerd van kwaliteit door reviews

Stuvia-klanten hebben meer dan 700.000 samenvattingen beoordeeld. Zo weet je zeker dat je de beste documenten koopt!

Snel en makkelijk kopen

Snel en makkelijk kopen

Je betaalt supersnel en eenmalig met iDeal, creditcard of Stuvia-tegoed voor de samenvatting. Zonder lidmaatschap.

Focus op de essentie

Focus op de essentie

Samenvattingen worden geschreven voor en door anderen. Daarom zijn de samenvattingen altijd betrouwbaar en actueel. Zo kom je snel tot de kern!

Veelgestelde vragen

Wat krijg ik als ik dit document koop?

Je krijgt een PDF, die direct beschikbaar is na je aankoop. Het gekochte document is altijd, overal en oneindig toegankelijk via je profiel.

Tevredenheidsgarantie: hoe werkt dat?

Onze tevredenheidsgarantie zorgt ervoor dat je altijd een studiedocument vindt dat goed bij je past. Je vult een formulier in en onze klantenservice regelt de rest.

Van wie koop ik deze samenvatting?

Stuvia is een marktplaats, je koop dit document dus niet van ons, maar van verkoper STUDYCENTER2024. Stuvia faciliteert de betaling aan de verkoper.

Zit ik meteen vast aan een abonnement?

Nee, je koopt alleen deze samenvatting voor €17,08. Je zit daarna nergens aan vast.

Is Stuvia te vertrouwen?

4,6 sterren op Google & Trustpilot (+1000 reviews)

Afgelopen 30 dagen zijn er 75632 samenvattingen verkocht

Opgericht in 2010, al 14 jaar dé plek om samenvattingen te kopen

Start met verkopen
€17,08  2x  verkocht
  • (0)
  Kopen