100% tevredenheidsgarantie Direct beschikbaar na betaling Zowel online als in PDF Je zit nergens aan vast
logo-home
SAFe 5 Advanced Scrum Master Exam Questions And Answers, Complete Solution €10,60   In winkelwagen

Tentamen (uitwerkingen)

SAFe 5 Advanced Scrum Master Exam Questions And Answers, Complete Solution

 28 keer bekeken  0 keer verkocht
  • Vak
  • Instelling

SAFe 5 Advanced Scrum Master Exam Questions And Answers, Complete Solution How does a Scrum Master lead a team's in relentless improvement? By facilitating the Iteration Retrospective An effective decision-making framework provides which two ultimate outcomes? 1 - Unlocks the intrinsic motiva...

[Meer zien]

Voorbeeld 3 van de 18  pagina's

  • 27 februari 2023
  • 18
  • 2022/2023
  • Tentamen (uitwerkingen)
  • Vragen en antwoorden
avatar-seller
SAFe 5 Advanced Scrum Master Exam
Questions And Answers, Complete Solution
How does a Scrum Master lead a team's in relentless improvement?
By facilitating the Iteration Retrospective
An effective decision-making framework provides which two ultimate outcomes?
1 - Unlocks the intrinsic motivation of knowledge workers
2 - Improves flow
What are two Release Train Enginner responsibilities?
1 - Drive relentles improvement through Inspect and Adapt
2 - Facilitate PI Planning readiness and the event itself
What is one way to improve the skills of a team member?
Pair-work with other team members
Who should vote on root causes?
The team members working on that problem
One of the Scrum Master's main responsibilities is to communicate with
management and outside stakeholders to hel the team in what way?
Protect them from uncontrolled addition of work
A team's Product Owner (PO) takes an unexxpected leave of absence for the last
week of the Iteration. Trhee of the team's Sotires have been completed and are
waiting to be accepted.

The Scrum Master asks the Product Manager (PM) to attend the Iteration Review
and accept the Sotires. The PM responds that he is not familiar enough with the
intent to feel comfortable accepting these responsabilities. He suggest keeping
the iteration open for additional week and waiting for the PO to come back. What
should the team's Scrum Master do?
Work with the Release Train Enginner to find a solution
The Agile Team need to learn or acquire new skills. Where is this list of skills
found?
In the Improvement backlog
Who participates in the Inspect and Adapt event?
The entire Agile Release Train
What are three Interation Retrospective anti-patterns?
1 - When only some of the team attends
2 - When the Scrum Master decides what the retrospective topic(s) will be and directs
the team on specific improvement items to work on
3 - When the team's people manager comes in to observe
What are two examples of tasking anti-patterns? (Choose two.)
1 - The team focuses on task completion over Story completion and acceptance criteria;
2 - The team provides updates only on tasks during the daily stand up meeting
Wich two actions enhance an Agile Release Train's performance?
1 - Collaboration
2 - Team alignment

,How does the Scrum Master hel teams address the challenges of modern
Enterprises?
By actively addressing impediments
What is the skill type Scrum Masters try to get the Agile Team to achieve?
T-Shaped
One state on the team Kaban board has people waiting while the previous stage
is overloaded. What should the Scrum Master consider doing?
Encourage and coach the people in the under-utilized stage to hel with the work of the
overloaded stage
How can learning Milestones be used?
To test the conecpt of a new Feature or Capability
What is one Extreme Programming (XP) rule adopted in SAFe?
Pair Programming
Why are SAFe Scrum Masters challenged differently in a Enterprise?
The team is affected by teams and stakeholders beyong their control
SAFe Scrum Master interact with wich level(s) of Framework?
All Levels
Wich tow events explicity implement the Lean-Agile Mindset of relentless
improvement?
1 - Inspect and Adapt
2 - Iteration Retrospective
Who is responsible for assisting to establish Continuous Integration in SAFe?
The System Team
What is the connection between feedback and optimun batch size?
Lack of feedback contributes to higher cost
During Iteration Review, the team decides to carry forward three Stories to the
next iteration. This is the second time during this PI that some of the team's
Stories are carried over. What are two actions the Scrum Master should take?
1 - Discuss the issue at the Itaration Retrospective
2 - Perform the 5 Whys to find the root cause of the delays
Who reviews the top Capabilities for the upcoming PI?
Solution Management
Wich statement describes how Kanban teams handle capacity during PI
Planning?
They use throughput as an indication of their capacity
Which technique is used to identify root causes during the problem-solving
workshop?
5 Whys
What are two key areas a team should be organized aroung?
1 - Enablers
2 - Features
What anti-pattern can emerge during the Scrum of Scrums?
Scrum Masters report on the teams' tasks status each day
A team achieved less than 80% predictability during the quantitative
measurement of the Inspect and Adapt event. What would be an unacceptable
action for this team's Scrum Master take?

, Decide improvement actions for the team to implement
In complex systems development, what do local integration points ensure?
That each Capability of the systems is meeting its responsibilities in contributing of the
overall Solution Intent
Wich SAFe organizational construct allows businesses to build large and
complex systems wich require hundreds of people in a Lean-Agile manner?
Solution Train
Achieving the goals of Release on Demand requires an understanding of how to
decouple what?
The release from deployment
What improves collaboration between Scrum Masters and System Architects,
System Teams and Operations?
Program Kanban
What is the most effective way to estabilish Built-in Quality?
Perform as many types of testing within the Iteration boundaries as possible
What action should be taken on relentless improvement backlog items from the
problem-solving worshop?
Use the items as direct input into the PI Planning event that follows
How do Kanban Teams implement the SAFe Lean-Agile mindset of relentless
improvement?
By using cumulative flow diagrams to objectively measure bottlenecks and variation
which could be due to systemic factors
Wich SAFe configuration requires having a Vision?
All SAFe configurations
What are two typical anti-patterns with Product Owners (POs)?
1 - POs design the Solution before brining the intent to the team;
2 - POs and Product Management are not aligned with business intent
What is a recommended Story-Splitting technique for Agile Teams?
Implement the 'happy path' first and the rest of the scenarios afterwards
What is the first step in the problem-solving workshop?
Agree on the problem to solve
What are three benefits a community of practice offers? (Choose three.)
1 - To drive craftsmanship;
2 - To facilitate the adoption of new methods and techniques;
3 - To provide a place to acquire knowledge;

https://www.scaledagileframework.com/communities-of-practice/
What provides objective evidence that the system is iterating?
System Demo
Wich statement is true about the phase-gate Milestone model?
It does not mitigate risk as intended
Wich pilar of the SAFe House of Lean supports not imposing wishful thinking?
Respect for People and Culture
Considering individual skill sets, an E-shaped person has a combination of what?
Experience
Expertise

Voordelen van het kopen van samenvattingen bij Stuvia op een rij:

Verzekerd van kwaliteit door reviews

Verzekerd van kwaliteit door reviews

Stuvia-klanten hebben meer dan 700.000 samenvattingen beoordeeld. Zo weet je zeker dat je de beste documenten koopt!

Snel en makkelijk kopen

Snel en makkelijk kopen

Je betaalt supersnel en eenmalig met iDeal, creditcard of Stuvia-tegoed voor de samenvatting. Zonder lidmaatschap.

Focus op de essentie

Focus op de essentie

Samenvattingen worden geschreven voor en door anderen. Daarom zijn de samenvattingen altijd betrouwbaar en actueel. Zo kom je snel tot de kern!

Veelgestelde vragen

Wat krijg ik als ik dit document koop?

Je krijgt een PDF, die direct beschikbaar is na je aankoop. Het gekochte document is altijd, overal en oneindig toegankelijk via je profiel.

Tevredenheidsgarantie: hoe werkt dat?

Onze tevredenheidsgarantie zorgt ervoor dat je altijd een studiedocument vindt dat goed bij je past. Je vult een formulier in en onze klantenservice regelt de rest.

Van wie koop ik deze samenvatting?

Stuvia is een marktplaats, je koop dit document dus niet van ons, maar van verkoper LectDan. Stuvia faciliteert de betaling aan de verkoper.

Zit ik meteen vast aan een abonnement?

Nee, je koopt alleen deze samenvatting voor €10,60. Je zit daarna nergens aan vast.

Is Stuvia te vertrouwen?

4,6 sterren op Google & Trustpilot (+1000 reviews)

Afgelopen 30 dagen zijn er 75619 samenvattingen verkocht

Opgericht in 2010, al 14 jaar dé plek om samenvattingen te kopen

Start met verkopen
€10,60
  • (0)
  Kopen