100% tevredenheidsgarantie Direct beschikbaar na betaling Zowel online als in PDF Je zit nergens aan vast
logo-home
Samenvatting - Projectmanagement (2113MDOGCP) €7,49
In winkelwagen

Samenvatting

Samenvatting - Projectmanagement (2113MDOGCP)

 20 keer bekeken  0 keer verkocht
  • Vak
  • Instelling

ENGELS Samenvatting aan de hand van de belangrijkste begrippen per les. H1 t/m 8 + 10, 11

Voorbeeld 4 van de 33  pagina's

  • 26 mei 2023
  • 33
  • 2022/2023
  • Samenvatting
avatar-seller
Inhoudsopgave
Lecture 1: Complex projects........................................................................................................................................................................................................... 2
Lecture 2: Project management, the bigger picture........................................................................................................................................................................ 5
Lecture 3: Initiating projects............................................................................................................................................................................................................ 7
Lecture 4: Defining projects............................................................................................................................................................................................................ 9
Lecture 5: Planning and preparing projects.................................................................................................................................................................................. 13
Lecture 6: Implementation & aftercare.......................................................................................................................................................................................... 15
Lecture 7: Managing time............................................................................................................................................................................................................. 16
Lecture 8: Project finance & budget management – process & project management................................................................................................................... 19
Lecture 10: Managing uncertainty & risk...................................................................................................................................................................................... 24
Lecture 11: Managing quality........................................................................................................................................................................................................ 30

,Lecture 1: Complex projects
Project Actionable parts of plans ( structureplans, spatial policy)
3 requirements:
 Timing
 Place (bv project zone, project study area)
 Budget
Strategic projects Projects embedded in strategic plans
Spatial Development Infrastructure projects
Projects (SDP’s)
Type of actors within SDP’s  Public projects (bv. Scheldekaaien)
 Private projects
 Public – private projects
Differentiation between main actors that run the project.
Type of goals SDP’s Single goal or multiple goal
Type of field for SDP’s  Greenfield
o Producing not developed land
 Brownfield
o Producing on developed land (sanitizing before building, more consistent projects)
o More shifting to these types of projects because greenfield is limited.
Type of landscape SDP’s  Urban: landscape projects
 Rural: non-urban projects
Type of SDP’s  Strategic
o Once in a lifetime project
o No routines in place to manage kind of projects
 Operational
o Series of projects that always have the same processes
o With a team that’s always working on those projects.
Management
characteristics of
SDP’s
Complex systems theory  Systems with many components
 Systems with high distinction (= onderscheid) between components
 Mutual dependent  things can go easily wrong. Bv. Parkeerplaats te klein / te groot
dat een effect kan hebben op leven, winkelen, milieu.
Different types of complexity  Technological complexity
o Design & Engineering
o Unicity (= zeldzaam) & nieuwigheid (novelty) v technology  (= overall anders, de
techn. Op de ene locatie is niet hetzeflde als op de andere)

, o Functional interdependencies  (sommige markten kunnen achterlopen met techn.)
o Uncertainty regarding the impact
o Technological dynamics during the project
 Societal complexity
o Many actors involved with different goals  differential impact thus winners &
losers, so projects result in societal struggle
o Bv de ring: port area more infrastructure to use, but less space to live.
o Large societal impact
 Political complexity
o Multi-level governance (te maken met verschillende lagen met een groot project ivm
budget)
o Effect of elections and political volatility (onzekerheid)
o Political strategic behaviour: political actors block each other
o Political logic is different from technological logic: political horse-trading in projects.
 Organizational complexity
o Organizational complexity  public, private, civil society
o Mutual dependency (resource dependency)
o Obliged to cooperate
 Juridical-administrative complexity
o Lot of procedures, environmental legislation, contracts
Megaprojects A separate specie of SDP’s
 Cost > 1 billion
 Many years to build
 Involve multiple stakeholders
 Impact millions of people
Performance of megaprojects shows: Systematic
 Cost overrun
o Cost escalation
 Time slippage
 Non-implementation
 Underperformance or underuse
 Decreasing ambition levels over time.
Theoretical causes of failures  The sublime of megaprojects (= drivers from megaproject initiation)
o 4 sublimes:
 Technological: possibilities in longest-highest-fastest projects
 Political: happy to have monuments and being visible in media & public.
 Economic: happy to get money & jobs from megaprojects.

,  Aesthetic: happiness from design lovers when buildings are beautiful/stylish.
 Optimism bias and deception (= drivers for mega project commitment)
o Pattern of errors is always skewed to the right (cost overrun)
o Their errors are intentional due cost underestimation
o Project promotors are too optimistic about costs & benefits (optimism bias)
 Accountability & Risk
o Ignoring uncertainties by different groups who are involved in decision making of a
megaproject because of no responsibility when things go wrong (accountability =
responsibility)
o Types of risk in megaprojects:
 Cost risk
 Demand risk
 Financial market risk (future interest rates)
 Political risk (regulation, parallel public investment)
o Studies are biased because of no accountability by actors in the decision-making
process.
o Traditional approaches to project management & better approaches
 Sunk costs and the escalation of commitment (= drivers for megaproject escalation)
o Escalation of commitment = tendency to keep investing in “bad” investments (fi old
car, waiting in line)
o Because of:
 Psychological mechanism
 Social drivers
 Project & economic drivers


 Transfer of risk and impacts to outside parties
 Fail
Questions: 1. What are SDP’s 1. Infrastructure projects
2. What are the different forms of 2. Technological, societal, political, organizational, juridical-adminstrative
complexity in Spatial development 3. ?Uncertainties & risks?
projects? 4. drivers from megaproject initiation: 4 types: technological, politic, economic, aesthetic.
3. What are the typical fail factors in Spatial 5. (4) sublimes, optimism bias and deception, accountability & risk, sunk costs and the
development projects? escalation of commitment
4. What is the megaproject sublime?
5. What are causes of megaproject failure?

Voordelen van het kopen van samenvattingen bij Stuvia op een rij:

Verzekerd van kwaliteit door reviews

Verzekerd van kwaliteit door reviews

Stuvia-klanten hebben meer dan 700.000 samenvattingen beoordeeld. Zo weet je zeker dat je de beste documenten koopt!

Snel en makkelijk kopen

Snel en makkelijk kopen

Je betaalt supersnel en eenmalig met iDeal, creditcard of Stuvia-tegoed voor de samenvatting. Zonder lidmaatschap.

Focus op de essentie

Focus op de essentie

Samenvattingen worden geschreven voor en door anderen. Daarom zijn de samenvattingen altijd betrouwbaar en actueel. Zo kom je snel tot de kern!

Veelgestelde vragen

Wat krijg ik als ik dit document koop?

Je krijgt een PDF, die direct beschikbaar is na je aankoop. Het gekochte document is altijd, overal en oneindig toegankelijk via je profiel.

Tevredenheidsgarantie: hoe werkt dat?

Onze tevredenheidsgarantie zorgt ervoor dat je altijd een studiedocument vindt dat goed bij je past. Je vult een formulier in en onze klantenservice regelt de rest.

Van wie koop ik deze samenvatting?

Stuvia is een marktplaats, je koop dit document dus niet van ons, maar van verkoper Mstudent123. Stuvia faciliteert de betaling aan de verkoper.

Zit ik meteen vast aan een abonnement?

Nee, je koopt alleen deze samenvatting voor €7,49. Je zit daarna nergens aan vast.

Is Stuvia te vertrouwen?

4,6 sterren op Google & Trustpilot (+1000 reviews)

Afgelopen 30 dagen zijn er 52510 samenvattingen verkocht

Opgericht in 2010, al 14 jaar dé plek om samenvattingen te kopen

Start met verkopen
€7,49
  • (0)
In winkelwagen
Toegevoegd