DBIA EXAM 2 STUDY GUIDE PRACTICE QUESTIONS AND ANSWERS 100% VERIFIED.

1 beoordeling
 20 keer verkocht
  • Vak
  • DBIA
  • Instelling
  • DBIA

DBIA EXAM 2 STUDY GUIDE PRACTICE QUESTIONS AND ANSWERS 100% VERIFIED.DBIA EXAM 2 STUDY GUIDE PRACTICE QUESTIONS AND ANSWERS 100% VERIFIED.DBIA EXAM 2 STUDY GUIDE PRACTICE QUESTIONS AND ANSWERS 100% VERIFIED.DBIA EXAM 2 STUDY GUIDE PRACTICE QUESTIONS AND ANSWERS 100% VERIFIED.VDBIA EXAM 2 STUDY ...

[Meer zien]

Voorbeeld 2 van de 14  pagina's

  • 13 juni 2023
  • 14
  • 2022/2023
  • Tentamen (uitwerkingen)
  • Vragen en antwoorden
  • DBIA
  • DBIA

1  beoordeling

review-writer-avatar

Door: bobbysanders • 8 maanden geleden

reply-writer-avatar

Door: saraciousstuvia • 7 maanden geleden

Thank you for the positive feedback.

avatar-seller
DBIA EXAM 2 STUDY GUIDE PRACTICE
QUESTIONS AND ANSWERS
_____ _____ is the belief that there is a technique, method or process that is more
effective at delivering a particular outcome than any other Correct -Best Practice

A Best Practice is the belief that there is a ______ , _____ or _____ that is more
effective at delivering a particular outcome than any other. Correct -- technique
- method
- process

How many best practices are there? Correct -10

What are the 3 areas that the implementing techniques are categorized into? Correct
-1. Procurement
2. Contracting
3. Execution

All DB members should be _____ and _____ in the DB process and be knowledgeable
of the differences between DB and other delivery systems. Correct -- educated
- trained

_____ is the essence of Design-Build Done Right Correct -Teaming

What are the 4 key factors enabling Team Alignment? Correct -1. Early Involvement
2. Qualifications-Based Selection
3. Cost Transparency
4. Fostering an Environment of Trust

The most successful projects engage core team members in the _____ process, before
advancing beyond _____ design. Correct -- design
- schematic

Early involvement enables deeper participation in _____ practices. Correct -
integrated

Projects should be staffed with individuals that are _____ and ______ in the
implementation of DB best practice and whose _______ are well-suited to the
collaborative nature of the DB process Correct -- educated
- experienced
- personalities

Senior leadership must support DB project _____. Correct -delivery

, _____ should create an organization that supports the successful procurement and
execution of a DB project with key personnel _____ and _____ in DB project delivery in
an _____ and _____ environment. Correct -- Owners
- educated
- trained
- integrated
- collaborative

Executive leadership requires _____ _____. Correct -True Believers

_____ are responsible for an integrated and collaborative environment. Correct -
Owners

Owners are responsible for an _____ and ______ environment. Correct -- integrated
- collaborative

Owners must sustain an atmosphere of _____ and _____. Correct -- trust
- flexibility

Owners must consistently operate from an _____ DB mindset. Correct -integrated

_____ _____ has a unique definition for each project. Correct -Design Excellence

_____ and _____ should collaboratively and jointly define the design value that best
meet Owner's goals for each project. Correct -- Owners
- Design-Builders

Owners and Design-Builders should collaboratively and jointly define the _____ _____
that best meet Owner's goals for each project. Correct -Design Value

_____ _____ is the time from Notice of Award to the end of the warranty period.
Correct -Post Award

Post Award is the time from _____ __ _____ to the end of the _____ period. Correct
-- Notice of Award
- Warranty

_____ Management typically focuses on building the project. Correct -Construction

_____-_____ _____ involves managing people through the ENTIRE process.
Correct -Design-Build Leadership

What are the 5 main stages of DB Leadership? Correct -1. Project team formation
and alignment.
2. Project pursuit and procurement.
3. Design integration and advancement.

Dit zijn jouw voordelen als je samenvattingen koopt bij Stuvia:

Bewezen kwaliteit door reviews

Bewezen kwaliteit door reviews

Studenten hebben al meer dan 850.000 samenvattingen beoordeeld. Zo weet jij zeker dat je de beste keuze maakt!

In een paar klikken geregeld

In een paar klikken geregeld

Geen gedoe — betaal gewoon eenmalig met iDeal, creditcard of je Stuvia-tegoed en je bent klaar. Geen abonnement nodig.

Direct to-the-point

Direct to-the-point

Studenten maken samenvattingen voor studenten. Dat betekent: actuele inhoud waar jij écht wat aan hebt. Geen overbodige details!

Veelgestelde vragen

Wat krijg ik als ik dit document koop?

Je krijgt een PDF, die direct beschikbaar is na je aankoop. Het gekochte document is altijd, overal en oneindig toegankelijk via je profiel.

Tevredenheidsgarantie: hoe werkt dat?

Onze tevredenheidsgarantie zorgt ervoor dat je altijd een studiedocument vindt dat goed bij je past. Je vult een formulier in en onze klantenservice regelt de rest.

Van wie koop ik deze samenvatting?

Stuvia is een marktplaats, je koop dit document dus niet van ons, maar van verkoper saraciousstuvia. Stuvia faciliteert de betaling aan de verkoper.

Zit ik meteen vast aan een abonnement?

Nee, je koopt alleen deze samenvatting voor €21,21. Je zit daarna nergens aan vast.

Is Stuvia te vertrouwen?

4,6 sterren op Google & Trustpilot (+1000 reviews)

Afgelopen 30 dagen zijn er 64670 samenvattingen verkocht

Opgericht in 2010, al 15 jaar dé plek om samenvattingen te kopen

Begin nu gratis

Laatst bekeken door jou


€21,21  20x  verkocht
  • (1)
In winkelwagen
Toegevoegd