100% tevredenheidsgarantie Direct beschikbaar na betaling Zowel online als in PDF Je zit nergens aan vast
logo-home
PRO4801 Assignment 4 2023 ( 791013) Answers with referencing and Reference list! €2,68   In winkelwagen

Tentamen (uitwerkingen)

PRO4801 Assignment 4 2023 ( 791013) Answers with referencing and Reference list!

1 beoordeling
 40 keer bekeken  5 keer verkocht
  • Vak
  • Instelling

PRO4801 Assignment 4 2023 ( ) Answers with referencing and Reference list!

Voorbeeld 3 van de 42  pagina's

  • 26 juni 2023
  • 42
  • 2022/2023
  • Tentamen (uitwerkingen)
  • Vragen en antwoorden

1  beoordeling

review-writer-avatar

Door: lindagwangwa • 1 jaar geleden

avatar-seller
,Table of Contents
Question 4.1 ............................................................................................................... 4

Projects go through many uncertainties. Therefore, projects must be able to
adjust. Traditional organisations are ineffective in the face of rapid change. In
contrast, project organisations should be organic. Explain what is meant by
'organic' and distinguish how the different kinds of integrators can enhance
interaction, coordination and mutual adjustments. .................................................. 4

Different types of integrators can enhance interactions, coordination, and mutual
adjustments in a project organization ..................................................................... 4

Multifunctional project teams .................................................................................. 8

Pure Project Managers ........................................................................................... 9

Matrix Managers ................................................................................................... 10

Integrating Contractors ......................................................................................... 11

Conclusion ............................................................................................................ 13

Question 4.2 ............................................................................................................. 14

The South African Satellite (SAS) project for the installation of two very advanced
satellite systems has been assigned to the board. Explain the specific content,
typical activities and different management approaches of the board, referring to
each of the four phases in the SAS systems development cycle. ............................ 14

The SDC comprises four phases .......................................................................... 14

Phase A: ............................................................................................................... 14

Phase B: ............................................................................................................... 15

Phase C: ............................................................................................................... 15

Phase D: ............................................................................................................... 15

Conclusion ............................................................................................................ 16

Question 4.3 ............................................................................................................. 16

Defend the selection of a project structure (form of organisation) by referring to the
importance of organisational structure for projects. .................................................. 16

There are four main types of projects organizational structures ........................... 16

1

, Presenting a Justification for the Significance of Organizational Structure in Projects
by Examining Relevant Criteria: ............................................................................... 18

Delving Deeper: Analysing Key Components for Selecting an Organizational
Structure and Their Implications on Project Management .................................... 19

Question 4.4 ............................................................................................................. 20

Differentiate between the formal and informal organisational structures and explain
the informal organisation’s role in project management. .......................................... 20

Formal Organizational Structure ........................................................................... 21

Informal Organizational Structure: ........................................................................ 22

Role of Informal Organization in Project Management: ........................................ 22

The main differences between the informal and formal organizational structures: 23

Question 4.5 ............................................................................................................. 25

Illustrate the different focal points of a project manager’s role. Explain the effect of a
project manager’s 'umbrella' responsibility in projects. ............................................. 25

The different focal points of a project manager’s role ........................................... 25

The effect of a project manager’s 'umbrella' responsibility in projects .................. 26

This umbrella responsibility ensures that: ............................................................. 26

Ways in which the umbrella responsibility of a project manager plays a critical role
.............................................................................................................................. 27

The different focal points of a project manager's role ........................................... 28

The effect of a project manager’s 'umbrella' responsibility, which encompasses all
of these focal points .............................................................................................. 29

Question 4.6 ............................................................................................................. 30

Distinguish between the four different qualification categories of a project manager
and explain why these are important for a successful project manager considering
the power shift. ......................................................................................................... 30

Distinguishing between the four different qualification categories of a project
manager ................................................................................................................... 30

Why are these qualifications important considering the power shift? ....................... 31

2

Voordelen van het kopen van samenvattingen bij Stuvia op een rij:

Verzekerd van kwaliteit door reviews

Verzekerd van kwaliteit door reviews

Stuvia-klanten hebben meer dan 700.000 samenvattingen beoordeeld. Zo weet je zeker dat je de beste documenten koopt!

Snel en makkelijk kopen

Snel en makkelijk kopen

Je betaalt supersnel en eenmalig met iDeal, creditcard of Stuvia-tegoed voor de samenvatting. Zonder lidmaatschap.

Focus op de essentie

Focus op de essentie

Samenvattingen worden geschreven voor en door anderen. Daarom zijn de samenvattingen altijd betrouwbaar en actueel. Zo kom je snel tot de kern!

Veelgestelde vragen

Wat krijg ik als ik dit document koop?

Je krijgt een PDF, die direct beschikbaar is na je aankoop. Het gekochte document is altijd, overal en oneindig toegankelijk via je profiel.

Tevredenheidsgarantie: hoe werkt dat?

Onze tevredenheidsgarantie zorgt ervoor dat je altijd een studiedocument vindt dat goed bij je past. Je vult een formulier in en onze klantenservice regelt de rest.

Van wie koop ik deze samenvatting?

Stuvia is een marktplaats, je koop dit document dus niet van ons, maar van verkoper EducationPacks. Stuvia faciliteert de betaling aan de verkoper.

Zit ik meteen vast aan een abonnement?

Nee, je koopt alleen deze samenvatting voor €2,68. Je zit daarna nergens aan vast.

Is Stuvia te vertrouwen?

4,6 sterren op Google & Trustpilot (+1000 reviews)

Afgelopen 30 dagen zijn er 78252 samenvattingen verkocht

Opgericht in 2010, al 14 jaar dé plek om samenvattingen te kopen

Start met verkopen
€2,68  5x  verkocht
  • (1)
  Kopen