Which attribute most accurately describes a project? - Answer The correct answer is:
Projects are finite.
What is an example of how project managers apply sound management techniques?
- Answer The correct answer is: they break down a task further if it remains at the
same percent completion despite reported progress.
Which is an advantage of using a standardized project management model? -
Answer The correct answer is: The model is a framework that project managers can
adapt to project specifics.
In the project model, what do outputs from the Plan phase become? - Answer The
correct answer is: inputs to the Execute phase.
A project will have a long payback period. What should the project be linked to thus
increasing the chances the project will be approved? - Answer The correct answer is:
Strategic facility plans
Which activity is set by policy at the start of a project? - Answer The correct answer
is: Estimating
What should a facility manager do at the beginning of a routine project to achieve
success? - Answer The correct answer is: generate a shared understanding of the
end purpose of a project.
What principle is true about the steps involved when defining project success? -
Answer The correct answer is: Specifying nonessential parameters is as important
as specifying essential ones.
Which document may include details such as adjacency diagrams, space standards,
and information on current and future staffing count for business units? - Answer The
correct answer is: Statement of requirements
In what document would the project manager be formally listed? - Answer The
correct answer is: Project charter
Which is true about the elements in a project objectives statement? - Answer The
correct answer is: Schedule documentation only includes milestones for hard
delivery dates.
An organization gathers data on occupant space requirements, desired location, and
desired cost per square meter (square foot). What other factors should be
considered when listing site selection criteria? - Answer The correct answer is:
Desired floor plan/stacking plan and desired amenities
Which element is developed first? - Answer The correct answer is: Work Breakdown
Structure (WBS)
Voordelen van het kopen van samenvattingen bij Stuvia op een rij:
Verzekerd van kwaliteit door reviews
Stuvia-klanten hebben meer dan 700.000 samenvattingen beoordeeld. Zo weet je zeker dat je de beste documenten koopt!
Snel en makkelijk kopen
Je betaalt supersnel en eenmalig met iDeal, creditcard of Stuvia-tegoed voor de samenvatting. Zonder lidmaatschap.
Focus op de essentie
Samenvattingen worden geschreven voor en door anderen. Daarom zijn de samenvattingen altijd betrouwbaar en actueel. Zo kom je snel tot de kern!
Veelgestelde vragen
Wat krijg ik als ik dit document koop?
Je krijgt een PDF, die direct beschikbaar is na je aankoop. Het gekochte document is altijd, overal en oneindig toegankelijk via je profiel.
Tevredenheidsgarantie: hoe werkt dat?
Onze tevredenheidsgarantie zorgt ervoor dat je altijd een studiedocument vindt dat goed bij je past. Je vult een formulier in en onze klantenservice regelt de rest.
Van wie koop ik deze samenvatting?
Stuvia is een marktplaats, je koop dit document dus niet van ons, maar van verkoper EvaTee. Stuvia faciliteert de betaling aan de verkoper.
Zit ik meteen vast aan een abonnement?
Nee, je koopt alleen deze samenvatting voor €10,81. Je zit daarna nergens aan vast.